2021-11-15 General Committee Meeting Agenda
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING AGENDA 15 NOVEMBER 2021
completed and an application for plan seal is not lodged with Council by 18 November
2025 unless an application to extend the currency period is approved by Council.
Plan of Development
5. Any future dwelling, associated buildings and effluent disposal area on Lot 11 must be
contained wholly within the approved building envelope shown on the approved Plans of
Development. A copy of the approved Plan of Development and Revegetation Concept
Plan must be included in the contract of sale for either lot, together with clauses which
a) requires any future dwelling, associated buildings and effluent disposal area on Lot
11 must be constructed within the building envelope.
b) Access permission to the proposed covenant area for the purposes of fulfilling the
requirements of the Revegetation Concept Plan and development approval
conditions.
Effluent Disposal
6. Lot 11 must be provided with an on-site waste water treatment and effluent disposal
system having a capacity sufficient for the use and contained within the building
envelope.
7. All effluent disposal areas in Lots 10 and 11 are to be wholly located within the lot in
which they serve and comply with the boundary setback requirements of the Plumbing
and Drainage Act 2002 and associated codes and requirements.
ENGINEERING
Property Access and Driveways
8. A residential driveway must be constructed to proposed Lot 11. The works must be
undertaken as part of any subsequent building approval on the Lot and be generally in
accordance with Council’s standard drawings at the time of construction.
To advise prospective purchasers and private certifiers the following property notation or
similar will be added to Council’s rates records for proposed Lot 11:
Private Certifiers, owners and prospective purchasers are notified that special access
requirements apply to this parcel of land. Contact Council's Planning Department for
Details.
Internal Fencing
9. The boundary between lots 10 & 11 must be located clear of the existing driveway and
the fencing relocated where appropriate.
10. No fencing is to be constructed in the covenant area, including on the boundary.
Stormwater Drainage
11. Stormwater runoff from the development must be disposed of on-site within the relevant
lot without causing scour or damage to the subject site or any adjoining property.
Services
12. Reticulated electricity and telecommunication services must be provided to each lot in
accordance with the standards and requirements of the relevant service provider.
13. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
Page 18 of 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.