Skip to the record
Noosa’s premier civic archive.

Original source · versioned page text

Stormwater Management Plan

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 16, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
Indicative location of the detention tank can be found in Appendix E. Flow hydrographs and
the water levels inside the tank of each detention tank for various AEPs are obtained through
the XPSTORM model. The results are presented in Appendix F.

Table 3.6 lists the key parameters of the above-ground detention tank.

Table 3.6 Specification of each roof water detention tank

                                                             Tank base area (m²)                  3.795 (1.15 x
               Underground Detention tank




                                                                                                      3.30)
                                                           Tank internal height (m)                   2.02
                                                              Tank Volume (m3)                        7.67
                                                 First orifice Invert RL from ground level (mm)        10
                                                          First orifice diameter (mm)                  40
                                                Second orifice Invert RL from ground level (mm)       1000
                                                         Second orifice diameter (mm)                  50
                                                        Tank outlet pipe diameter (mm)                150



A schematic plot is presented in Figure 3.3, the location of the orifices are illustrated.




                                            Figure 3.3 Illustration of the proposed 7 KL detention tank



File Name:                                  WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:                                   C                                                                     16
Log in to download the original file

STORMWATER MANAGEMENT PLAN.PDF · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.