Stormwater Management Plan

of 94

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 17, section 1. The text section number identifies this passage in the reader.

Plans and drawings

This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).

Log in to see the plans as drawn
65-67 Elanda Street, Sunshine Beach
Site Based Stormwater Management Plan
_____________________________________________________________________________________________
For each tank, the flow discharge is the sum of the flows from the two orifices. The sum of
the flows from the proposed two detention tanks and by-pass areas shall be no greater than
the total flow discharge from pre-development site, details of which are presented in Table
3.7.

Table 3.7 Mitigated Flows using roof water Detention Tank

              Storm event             Peak flow from       Peak flow from    Sum of the peak
                                      detention tanks      all the by-pass     flow (m3/s)
                                          (m3/s)            area (m3/s)

             63% AEP, 25min               0.006                0.013              0.019
             39% AEP, 25min               0.006                0.016              0.022
             20% AEP, 25min               0.008                0.023              0.031
             10% AEP, 25min               0.010                0.029              0.039
             5% AEP, 25min                0.010                0.034              0.044
             2% AEP, 25min                0.018                0.036              0.054
             1% AEP, 25min                0.022                0.040              0.062




File Name:            WCD-22936 – 65-67 Elanda_SWMP.docx
Revision:             C                                                                        17
Log in to download the original file

STORMWATER MANAGEMENT PLAN.PDF · 6.4 MB (large file)

Large file: the download may take up to a minute.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.