Council archive · source document
08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published] · 142008.252
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 21.0, 3 September 2007
49 {s the proposed operational work for the following?
« For the construction of a referable dam as defined under the Water Act 2000 —)] No DD Yes /
© To increase the storage capacity of a referable dam by more than 10% [x] No OO Yes t
{f yes to either or both - (Complete Part Ks) This application requires assessment by the Department of Natural Resources and Water (NRW).
if NRWis not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
IPA, schedule 8, part 1. tabis 4, tem 4
IP Regulation, schedule 2, table 2: item 10
4.10 ls any of the proposed operational work tidal work, other than excluded work defined under the IPA?
(No
[X] Yes - Answer (a) and (b) betow
_{a) Is any of the proposed tidal work prescribed tidal work?
Yes
O] No
{f yes, is any of the proposed prescribed tidal work to be carried out in a wild river aréa declared under the Wild @
Rivers Act 2005?
[X] No
-E Yes
If no, is the work proposed in a canal? .
No
CI Yes
If no, is any of the proposed tidal work for a marina with more than 6 vessel berths?
x] No - (Complete Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager for
the application, the agency has jurisdiction as Concurrence Agency. The application also requires
assessment by Queensland Transport (Maritime Safety Qid) as Concurrence Agency.
(1 Yes - (Complete Part P). if the Environmental Protection Agency (EPA) is not the Assessment Manager
for the application, the agency has jurisdiction as Concurrence Agency. The application also
requires assessment by Queensland Transport (Maritime Safety Qld) as Concurrence Agency and
Qld Fire and Rescue Service as Advice Agency.
(b)_ Is any of the proposed tidal work to be carried out in one or more of the following tidal areas?
. One only local government tidal area “L1No - Yes @
vemment tie aesoulinno sttegieporttdelaea) BNO] Yes
e oer or mor socal government tidal areas but not starting in either local No o Yes
. One only strategic port tidal area No C1 Yes
. Atel area that is not a strategic port tidal area or a local government tidal No Cl Yes
IPA, schedule 8, part 7, table 4, fem §
4.14 \s any of the operational work proposed to be carried out within a coastal management district?
(J No
[x] Yes
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.