Council archive · source document
08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published] · 142008.252
INTEGRATED PLANNING ACT 1997 . IDAS Assessment Checklist, Version 21.0, 3’Septemiber 2007
If yes, Is the proposed operational work for the following?
Interfering with quarry material on State coastal land above high-water mark [x] No Yes
e Disposing of dredge spoil or other solid waste material in tidal watera ‘ [x] No 0 Yes
¢ Drainage or allowing drainage or flow water or other matter across State costal land above [x] ‘No OYes
high-water mark ,
¢ Constructing or installing works in a watercourse where the works are not assessable under [x] No Yes
IPA, schedule 8, part 1, table 4, items 3 or 4 ot
e Reclaiming land under tidal watera [—K] No OYes
© Constructing an artificial waterway, other than a canal, associated with reconfiguring a lot [x] No 0 Yes
¢ Constructing an artificial waterway that is a canal, associated with reconfiguring alot [] No 0 Yes
¢ Constructing an artificial waterway not associated with reconfiguring a fot on land, other than {&] No Yes
State coastal land, above high-water if the maximum surface area of water on the waterway
is at least 5,000m2
e Constructing a bank or bund wall to establish a ponded pasture on land, other than State {%] No [Yes
coastal land, above high-water mark
¢ Removing or interfering with coastal dunes on land, other than State coastal land, that is in [%] No OO Yes
an erosion prone area and above high-water mark
IPA, schedule 8, part t, table 4, tem §
IP Regi tton, achediile 2, tabie 2, lenis 12 and 14
3. table 4, items 4A and 5
lagement Act 1995 Act 1995, section 1044 {wild river area)
thon ¢3A
4.12 ts any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
No
0 Yes
IPA, schedule 8, part 1, fable 4, tem &
IPA, soheclule 8, part 2. tabie 4, Kem 2
4.13 Is any of the operational work proposed to be cartied out completely or partly within a declared fi sh habitat area under the
Fisheries Act 1994?
~ >] No
0 Yes
IPA, schedule 8, part
IPA, schedule 8. pa
He {, part 3, table 4, tem 7
5, sections $34
4.14 Is any of the proposed operational wo work removing, destroying or cama marine plants under the Fisheries Act 1994?
[K] No
CO Yes
IPA, schedule &, part 1, table 4. item 8
IPA, schedule 8, pari 2. table 4
IP Regulati
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0252 - Prescribed Tidal Works - Transport Type 6 - Commercial Marine [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.