Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Place barcode here
THIS IS THE FIRST PART OF A
MULTIPLE PART RECORD
Checklist 1 Part a Of
(Please Circle)
Application number: Dpr.J 0-3-
T:U&Ahf flCS L'M' ORMAT1ON MANAGEMENTRECORDS MANAGEM ENTConuol of Records'EDRMS\Molt, Pan Record Cover Sheet FOIST PART dof
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of pages 2 to 94 (of 275)
Page 2
Environmental Management Plan
no, Peregian Beach Caravan Park
Important Note
Apart from fair dealing for the purposes of private study, research, criticism, or review as permitted under the Copyright
Act, no part of this report, its attachments or appendices may be reproduced by any process without the written consent
of RPS Australia East Pty Ltd. All enquiries should be directed to RPS Australia East Pty Ltd.
We have prepared this report for the sole purposes of Matrix Projects Pty Ltd & Scanlon Property Group Pty Ltd ("Client")
for the specific purpose only for which it is supplied. This report is strictly limited to the Purpose and the facts and matters
stated in it and does not apply directly or indirectly and will not be used for any other application, purpose, use or matter.
In preparing this report we have made certain assumptions. We have assumed that all information and documents
provided to us by the Client or as a result of a specific request or enquiry were complete, accurate and up-to-date. Where
we have obtained information from a government register or database, we have assumed that the information is
accurate. Where an assumption has been made, we have not made any independent investigations with respect to the
matters the subject of that assumption. We are not aware of any reason why any of the assumptions are incorrect.
This report is presented without the assumption of a duty of care to any other person (other than the Client) ("Third
Party"). The report may not contain sufficient information for the purposes of a Third Party or for other uses. Without the
prior written consent of RPS Australia East Pty Ltd:
a) This report may not be relied on by a Third Party; and
b) RPS Australia East Ply Ltd will not be liable to a Third Party for any loss, damage, liability or claim arising out of
or incidental to a Third Party publishing, using or relying on the facts, content, opinions or subject matter
contained in this report.
If a Third Party uses or relies on the facts, content, opinions or subject matter contained in this report with or without the
consent of RPS Australia East Pty Ltd, RPS Australia East Ply Ltd disclaims all risk and the Third Party assumes all risk
and releases and indemnifies and agrees to keep indemnified (Conics Brisbane) Pty Ltd from any loss, damage, claim or
liability arising directly or indirectly from the use of or reliance on this report.
In this note, a reference to loss and damage includes past and prospective economic loss, loss of profits, damage to
property, injury to any person (including death) costs and expenses incurred in taking measures to prevent, mitigate or
rectify any harm, loss of opportunity, legal costs, compensation, interest and any other direct, indirect, consequential or
financial or other loss.
Quality Assurance Statement
Revision Approved for Issue
Author Reviewer
No. Signature Date
0 L. Fisher & S. Brisbane J. Watson 4 October 2011
4)4
Page 3
Environmental Management Plan
Peregian Beach Caravan Park
Table of Contents
1.0 INTRODUCTION .................................................................................................................1
1.1 BACKGROUND ....................................................................................................................... 1
1.2 DEVELOPMENT APPROVAL CONDITIONS ................................................................................. 1
1.3 STATUTORY OBLIGATIONS ..................................................................................................... 1
1.4 EMP O BJECTIVES .................................................................................. ............................... 3
1.5 CONTRAST CONSTRUCTION'S ENVIRONMENTAL POLICY .......................................................... 4
2.0 EMP FRAMEWORK & IMPLEMENTATION ...................................................................... 5
2.1 SUMMARY OF ENVIRONMENTAL ISSUES .................................................................................. 5
2.2 EMP ELEMENTS & STRUCTURE ............................................................................................. 6
2.3 ROLES & RESPONSIBILITIES .................................................................................................. 7
2.4 TRAINING REOUIREMENTS ..................................................................................................... 8
2.5 ENVIRONMENTAL INCIDENT & COMPLAINTS PROCEDURE ........................................................ 9
2.5.1 Environmental Incident Reporting ....................................................................................... 9
2.5.2 Environmental Complaints .................................................................................................. 9
2.6 REPORTING & DATA MANAGEMENT ..................................................................................... 10
2.7 EMP AUDIT & REVIEW ........................................................................................................10
3.0 CONSTRUCTION PHASE MANAGEMENT PLANS ....................................................... 11
3.1 EROSION & SEDIMENT CONTROL ......................................................................................... 11
3.2 SURFACE & GROUND WATER QUALITY ................................................................................ 19
3.3 HAZARDOUS SUBSTANCES .................................................................................................. 23
3.4 VEGETATION PROTECTION ................................................................................................... 27
3.5 WEED & PEST CONTROL ..................................................................................................... 31
3.6 BUSHFIRE CONTROL ........................................................................................................... 34
3.7 FAUNA PROTECTION ............................................................................................................ 36
3.8 AIR QUALITY ....................................................................................................................... 39
3.9 NOISE & VIBRATION ............................................................................................................ 42
3.10 WASTE MANAGEMENT ......................................................................................................... 45
3.11 CULTURAL HERITAGE .......................................................................................................... 47
3.12 VISUAL AMENITY ................................................................................................................. 48
4.0 OPERATIONAL PHASE MANAGEMENT PLANS .......................................................... 49
4.1 SURFACE & GROUND WATER QUALITY ................................................................................ 49
4.2 WATER CONSERVATION ...................................................................................................... 54
4.3 VEGETATION PROTECTION ................................................................................................... 57
4.4 WEED & PEST CONTROL .....................................................................................................60
4.5 BUSHFIRE CONTROL ........................................................................................................... 62
4.6 FAUNA PROTECTION ............................................................................................................ 64
4.7 WASTE MANAGEMENT ......................................................................................................... 66
5.0 REFERENCES .................................................................................................................. 67
1101 14 PR20517,,EMP.doc Page i
Page 4
Environmental Management Plan
Peregian Beach Caravan Park
Tables
Table 1.1: Summary of Statutory Obligations .......................................................................................... 2
Table 2.1: Existing Environmental Issues and Potential Impacts ............................................................ 5
Table 2.2: Summary of Roles & Responsibilities .................................................................................... 7
Appendices
Appendix A: Stormwater Management Plan / Sediment and Erosion Control Plan
Appendix B: Ecological Restoration Plan
Appendix C: Arborist Report
Appendix D: Koala Habitat Management Plan
Appendix E: Fire Management Plan
1101 14_PR20517_EMP.doc Page ii
Page 5
Environmental Management Plan
F
W11 lire, Peregian Beach Caravan Park
1.0 Introduction
Backer
This Environmental Management Plan (EMP) has been prepared on behalf of Contrast Constructions Pty Ltd
to manage potential environmental impacts in relation to the approved redevelopment of the Peregian Beach
Caravan Park located at 215-219 David Low Way, Peregian.
The approved development involves the upgrading of the current tourist accommodation facilities by
constructing commercial buildings (restaurant/retail/offices) and accommodation units and beach shacks to
replace the current caravan park. The development also incorporates an approximately 20m service and
buffer area to the adjacent Noosa National Park.
As a condition of approval, an EMP is to be prepared that outlines management strategies to implement
during the construction and operational phase of the development to reduce the risk of environmental harm.
This EMP has been developed with general reference to the following:
Ecological Assessment, June 2007 by Natural Solutions;
Stormwater Management Plan / Sediment and Erosion Control Plan, December 2010 by Simmonds &
Bristow;
Ecological Restoration Plan, June 2010 by RPS;
Arborist Report, June 2010 by Leaf & Limb Horticultural Consultancy;
Koala Habitat Management Plan, June 2010 by James Warren & Associates;
Fire Management Plan, November 2007 by Natural Solutions;
Acid Sulfate Soils Assessment, July 2010 by Butlers Partners;
Waste Management Plan;
Conditions of Development Approval; and
Approved design drawings.
pment Approval
The preparation of the EMP is in response to Condition 69-71 of the Development Approval for a
Reconfiguration of a Lot (ROL) application for the site, issued by the Sunshine Coast Regional Council
(SCRC). The prepared EMP is to address relevant environmental issues in relation to the construction and
operational phase of the development.
Construction and operational works for the approved development need to be undertaken in accordance with
the EMP to ensure the development's impact on the environment is minimal, the environmental values of the
site are protected and enhance, and the development is ecologically sustainable.
Statutory Obligations
In addition to the condition requirements outlined in the Development Approval for the site, the development
has obligations and responsibilities under numerous pieces of legislation and policies at the federal, state
and local levels. The EMP has been prepared to assist the development in meeting these obligations. Table
1.1 outlines the relevant statutory documents and associated compliance requirements.
110114_PR20517_EMP.doc Page I
Page 6
Environmental Management Plan
FolVa-liq'
Peregian Beach Caravan Park
Table 1.1: Summary of Statutory Obligations
RELEVANT STATUTORY DOCUMENT
Federal
Environmental Protection and Biodiversity Conservation Development activities are not to pose a likely risk of
Act 1999 (EPBC Act) significantly impacting on Matter of National Environmental
Significance (MNES). The Noosa National Park adjacent
to the site is listed as a National Heritage Place and
contains known habitat for threatened species, which are
considered under the Act of MNES.
Australian Heritage Council Act 2003 Development activities are not to have an adverse impact
on cultural heritage areas. The Noosa National Park
adjacent to the site is listed on the Register of National
Estates database.
State
Aboriginal Cultural Heritage Act 2003 The Contractor is to comply with the Aboriginal cultural
heritage duty of care during construction and operational
phases.
Coastal Protection and Management Act 1995 Development activities must maintain, protect and
enhance the current extent and diversity of mapped
wetlands within and adjacent to the site. In particular,
development activities must maintain and enhance
environmental values and water quality, including
groundwater hydrology of receiving wetlands.
Environmental Protection Act 1994 The Contractor must uphold the duty of care as defined
under the Act:
A person must not carry out any activity that causes, or is
likely to cause, environmental harm unless the person
takes all reasonable and practicable measures to prevent
or minimise the harm"
Environmental Protection Policies for Air, Noise and Water The Contractor must take reasonable steps to ensure the
environmental values and quality objectives stated under
the relevant policies for the receiving environment are
achieved.
Land Protection (Pest and Stock Route Management) Act The Contractor must take reasonable steps to remove and
2002(LPA) maintain the site free of Class 1 and 2 species declared
under the LPA.
Nature Conservation Act 1992 (NCA) Development activities are to comply with the Act's
management intent for listed threatened species and
declared protected areas by ensuring minimal impact.
Construction and operational works are to be undertaken
1101 14 PR20517 EMP.doc Page 2
Page 7
Environmental Management Plan
Fal -0 D 41
Peregian Beach Caravan Park
_.^l _ 1 • ^^
in accordance with the necessary permits to clear native
plants under the NCA.
South East Queensland Koala State Planning Regulatory Development activities are to be consistent with the
Provisions (February 2010) requirements of the state planning regulatory provisions by
undertaking all works in accordance with the prepared
Koala Management Plan.
State Planning Policy 1/03 Mitigating the Adverse Impacts Development activities are to be consistent with the
of Flood, Bushfire and Landslide (SPP 1/03) outcomes of SPP 1/03, including minimising as far as
practicable the adverse impacts from natural hazards and
not posing an unacceptable risk to people or property.
Sustainable Planning Act 2009 Development activities are to be consistent with works
required to establish the land uses approved by the SCRC.
Vegetation Management Act 1999 (VMA) All clearing works associated with the development are to
be limited to clearing that falls under the urban area &
urban purposes clearing exemption as defined Sustainable
Planning Regulations 2009.
Local
Local Law 10 - Vegetation Management Clearing works are to be undertaken in accordance with
any necessary Council permits to clear native vegetation
on the site.
1.4 EMP Objectives
The purpose of this EMP is to assist the SCRC, the Principal Contractor and consultants to minimise the
potential risk of environmental harm from construction and operational activities associated with the
development.
The general objectives of this EMP are to:
Provide a framework for authorities (including SCRC) and the Principal Contractor to confirm
compliance with environmental statutory requirements and other obligations;
Set the environmental standards to be achieved;
Provide practical and achievable management strategies for various facets of the development to
minimise the potential risk of adverse impact on the environmental values of the area during
construction and operation;
Identify extraordinary factors (i.e. abnormal operation, emergencies) that may cause environmental
harm and establish contingency plans to deal with these;
Facilitate regular monitoring and reporting of environmental performance and conditions during
construction and operation to allow for early detection and management of potential issues;
Place an environmental commitment on each staff member in carrying out all operations and tasks;
Ensure all persons carrying out the activity are aware of the environmental risks, and are trained in the
measures and contingency plans to deal with them;
110114_PR205I7_EMP.doc Page 3
Page 8
Environmental Management Plan
Peregian Beach Caravan Park
Provide evidence to the community that the project is being managed in an environmentally
acceptable manner; and
Provide for continual improvement.
Cc
Contrast Constructions Pty Ltd (Bradley Durkin, Managing Director) has committed to conduct business in a
manner that drives to protect the environment in the communities that are touched by our company.
Contrast aims to use preventative measures where possible and commits to an ongoing development of our
policy and procedures.
Contrast Constructions Pty Ltd recognizes that our company will impact the environment in these key areas:
• Energy Use
• Raw material Use
• Waste Generation
• Emissions that impact air and water
• Water Use
• Transport
• Land Procurement
• Noise Pollution
Our Commitment to you & to the environment is as follows;
Contrast aims to provide training and ongoing support, to implement programs and to conduct internal
reviews to ensure ongoing compliance with the relevant legislation and regulations.
Contrast aims to educate employees to a great understanding of our environmental policy, our aim is
that the knowledge will be shared and a greater responsibility of one's own impact on the environment
will grow.
Contrast aims to support Clients, Suppliers and Subcontractors alike in their quest for better
environmental initiatives.
Contrast aims to continually grow in the direction of a greener environment by sourcing and adopting
more sustainable environmental building practices.
Contrast aims to communicate to all parties within the working relationship the importance of preventing
environmental issues, where this cannot be achieved - to reporting and aiding in ongoing development
of the plan
Contrast aims, where appropriate to minimize our creation of waste, to recycle, to ensure pollution
prevention and to disposal of all wastes to the best possible means.
Contrast aims to provide achievable resources to implement and manage our environmental policy
1101 14 PR20517 EMPdoc Page 4
Page 9
Environmental Management Plan
Peregian Beach Caravan Park
2.0 EMP Framework & Implementation
This EMP has been prepared to set the framework necessary to ensure that the relevant environmental
issues are identified and addressed in an EMP element and that the subsequent control strategies
developed for each element are appropriately implemented to minimise potential adverse environmental
impacts during construction and operational phases of the project.
The following sections outline the relevant environmental issues, the prescribed EMP elements for each
phase of development and the structure of the management plan for each element. Roles and
responsibilities as well as other procedures to implement during the construction and operation of the
development are also described.
mmary of En
A general list of potential environmental issues and impacts that could arise during the construction and
operation of the development is listed below in Table 2.1. Consideration of potential environmental issues
and impacts has been given during the preparation of the EMP.
TABLE 2,1: EXISTING ENVIRONMENTAL ISSUES AND POTENTIAL IMPACTS
I* POTENTIAL IMPACTS
Vegetation Loss of some mature and remnant vegetation;
Presence of exotic vegetation and declared weed species increasing the risk of further
weed invasion during disturbance works;
Potential reduction in condition and quality of vegetation communities within and adjacent to
the site;
Potential increase in edge effects within surrounding vegetation communities;
Loss of stabilising function of vegetation;
Potential damage to retained trees within the development site during clearing works; and
Site aesthetics potentially affected.
Fauna & Habitat n Potential degradation of site's and surrounding areas habitat values, including resources
potentially utilised by significant species in the Noosa National Park;
n Increased risk of fauna collision during construction works;
n Increased risk of fauna injury and death during clearing works;
n Potential reduction in the site's permeability for fauna, including Koalas, to access to site's
foraging resources;
n Potential increase in pest animals on the site due to increase disturbance during
construction and operational works;
• Loss of some mature trees and associated habitat resources i.e. foraging, nesting and
sheltering; and
• Potential increase in site's fire risk and subsequent threat to surrounding habitats within
Noosa National Park.
n Potential source of gross pollutants, sediments, litter and chemicals entering the site's wet
Water Quality
heath area and Noosa National Park from construction works;
(including n Potential source of gross pollutants and chemicals from construction works infiltrating into
groundwater) the groundwater resources that supply the Noosa National Park;
n Potential degradation of aquatic and semi-aquatic habitat within and adjacent to site;
n Increased risk of chemical spills during the construction phase; and
n Potential for increased pressure on the site's wet heath area and Noosa National Park to
process and assimilate development's stormwater.
Air • Short term, localised air quality impacts due to particulate emissions from heavy machinery
use on construction site; and
1101 14_PR20517_EMP.doc Page 5
Page 10
Environmental Management Plan
Peregian Beach Caravan Park
A^T# k II I_ 4r71Tj T'i l
Short term, localised impacts due to dust creation when machinery working in exposed
areas etc.
Noise Short term increases in background noise levels due to machinery operation and truck
movements;
Potential increase in edge effects for surrounding habitat areas; and
Potential disturbance to fauna.
Waste Poor waste management encouraging an increase in pest animals on the site; and
Potential for increase pressure on local landfills.
EMP Elt
The EMP elements address environmental issues and impacts that have been identified as relevant to the
construction and operational phase of the development. These elements are also based on issues listed in
Condition 71.4 and 71.5 of the Development Approval issues by the SRC. Specific control by way of
environmental management strategies have been developed for each element, which are included in
Sections 3.0 and 4.0 of this EMP.
EMP elements have been separated into the relevant development phase and include:
Construction Phase: Operational Phase:
n Erosion and sediment control; • Water Conservation;
n Vegetation protection; n Water Quality;
n Fauna management; n Stormwater Management;
• Weed and pest control; n Vegetation Protection;
• Water quality (including groundwater); n Fauna Management;
• Air quality; n Bushfire Control;
n Storage and handling of hazardous substances; • Weed and Pest Control; and
• Noise and vibration control; n Waste Management.
• Waste management;
• Cultural heritage; and
• Visual amenity protection.
The EMP sets out, through the abovementioned individual elements, specific management plans with the
following structure:
Performance Objectives / Indicators - Describe the criteria against which the level of achievement of
the stated objective / target shall be measured.
Control Measures - Describe the steps to be taken to implement the nominated strategy, including
any necessary approval, applications, consulting, monitoring.
Monitoring - Nominate a time frame in which each of the tasks / actions are to be carried out and/or
completed (e.g. daily, monthly, and prior to commencement of use).
Reporting / Responsibility - Describe the required reporting and review arrangements (including
auditing) for each task (e.g. how often, by whom, to whom) and assign responsibility for carrying out
each task/action to a relevant person and / or organisation.
Corrective Actions - Describe what shall be done if the stated objectives / targets are not being met
or maintained, including whom is responsible for taking the required actions.
1 101 14_PR20517_EMP.doc Page 6
Page 11
Environmental Management Plan
Peregian Beach Caravan Park
The Contractor will be responsible for the implementation of the EMP during the construction stages of the
development. The Contractor will also be the responsible party for implementing the EMP during the
mandatory maintenance period for the operational stage of development.
The Contractor (on behalf of Contrast Constructions Pty Ltd) is responsible for ensuring all personnel
including subcontractors are aware of the contents of the EMP and act accordingly. The Site Manager is the
site supervisor and supervises the Contractor.
All staff employed by the facility shall be educated, during the site induction, on the environmental obligations
of the EMP, informed of the significance of the EMP and their general environmental duty of care under the
Environmental Protection Act 1994. The EMP shall be made available to all staff employed at the facility as
a reference document. A summary of the roles and responsibilities during the construction and mandatory
maintenance period is provided in Table 2.1.
Once each stage of the development proceeds to `off-maintenance', implementation of the EMP will then fall
to the Body Corporate.
Table 2.2: Summary of Roles & Responsibilities
TITLE ROLE RESPONSIBILITY
The Site Manager has overall responsibility Authorising and ensuring the EMP is made
to ensure that the construction works occur available to all staff and authorities.
as per requirements, while adhering to • Being wholly responsible for operation of
statutory requirements. the site including compliance and
• The Site Manager has overall responsibility implementation with the EMP.
to ensure implementation and operation of n Allocating resources for environmental
environmental practices on the site. management, training and EMP duties.
n Perform regular inspections of the site • Engagement of environmental auditor when
works to identify areas that require necessary.
Site Manager improvements.
• Reviewing EMP effectiveness for
n The Site Manager must regularly liaise with continuous improvement.
the Construction Foreman and regulatory
authorities. • Reporting to relevant authorities including
Council.
n Liaising with Council, agencies, neighbours,
complainants, community groups and other
stakeholders.
n Maintaining complaints register.
• Direct all works for machinery and truck Some reporting to relevant authorities
operators. including Council and the Site Manager.
• Prepare and collate all necessary reporting Controlling EMP including revision & issues.
for the site e.g. incident reports, progress Ensuring project operations are performed
reports, monitoring reports and submit in accordance with requirements.
these to the Site Manager.
Ensure all personnel on site have
• Engagement and briefing of consultants and undertaken site induction.
Construction sub contractors.
Reviewing inspection reports and following
Foreman Undertake all site inductions. up on actions.
n Arranging and attending inspections and . Ensuring non-compliances are reported and
meetings. corrective actions are taken.
n Schedule periodic meetings with operational Ensuring subcontractors fulfil their
staff to discuss and record improvement environmental obligations.
opportunities, keeping up to date with
industry guidelines.
Reviewing environmental procedures.
n Assigning project staff to perform EMP Undertake daily monitoring and reporting
1101 14_PR20517-EMP.doc Page 7
Page 12
Environmental Management Plan
Peregian Beach Caravan Park
TITLE ROLE
duties. requirements for Site Environmental Log,
n Implementing the EMP for all environmental including, rainfall records, pH & turbidity
matters on site, with authority to direct values with on-site probe, etc.
compliance with the EMP. Establish and maintain the incident register,
n Liaison with necessary consultants, auditors complaints register and compliance
and health and safety officers. checklists and report this information to the
Site Manager.
n Perform regular inspections of the site
works to identify areas that require
improvements.
• Undertake site works as instructed by the • To undertake site works with a duty of care
Construction Foreman. under the Environmental Protection Act
All Staff • All equipment used and works undertaken 1994.
(including are in compliance with this EMP.
n Report all incidents. spills or non
Contract Staff)
conformances with the EMP to the
Construction Foreman
n Undertake scheduled and non scheduled • Scheduled inspections and audits of all
environmental inspections and audits and environmental protection measures and
reporting of compliance with the EMP. their efficiency.
n Undertake regular monitoring events. • Unscheduled inspections of the site
Environmental The Environmental Auditor / Officer will be following instances of increased
independent of the Principal Contractor. environmental risk (eg. heavy rainfall) or
Officer / Auditor
reported non-compliance.
n The Environmental Auditor/Officer will be
qualified and have specific skills required to Review monitoring reports, corrective
cover the range of environmental issues actions, incident register and complaints
covered in this EMP. logs as required.
n Develop and undertake all site works in n Implementing the Occupational Health &
accordance with the Occupational Health Safety Plan.
Occupational and Safety Plan.
Health & Safety n Undertake site OHS inductions.
Officer • Review and amend procedures relating to
chemicals and hazardous materials stored
and used on site where necessary.
Training Requirem
The environmental management techniques outlined in this management plan apply to all persons working
on or entering the site. A copy of the EMP will be issued to all personnel working on or entering the site,
including contractors and subcontractors. A site induction will be conducted for all persons prior to entering
or working on the site. The induction will include:
An introduction to the environmental values of the site;
An explanation of the management techniques used on site to protect environmental values;
An explanation of the requirements for all persons working on and entering the site; and
An understanding of responsibilities under relevant legislation and ramifications to individuals if the
EMP requirements are not followed.
Following this site induction each person will be required to sign a declaration stating that they have been
informed of the specific site environmental requirements and have understood these requirements. All
signed declaration forms shall be kept at the site office by the Site Manager. The signed declaration forms
1101 14_PR20517_EMP.doc Page 8
Page 13
Environmental Management Plan
Peregian Beach Caravan Park
shall be made available for inspection by Council officers upon request. Some staff such as machinery
operators and truck operators may need more intensive training as to the specific requirements of this EMP.
2.5.1 Environmental Incident Reporting
All environmental incidents and near-misses shall be reported to the Site Foreman or Site Manager. The
Site Foreman shall establish and maintain an Environmental Incident Register which lists the date and
nature of the incident/near miss. An incident report shall be completed for each incident/near miss and shall
address the following:
Date of incident;
Nature of incident and associated information;
Location of incident;
Name of person or body which reported incident (note: if complainant does not wish to be identified
then "not identified" is to be recorded);
Employee who received notice of incident;
Contractor's review and comment;
Recommended action to resolve incident;
List of organisations to be contacted with regard to incident;
Outcome of actions undertaken subsequent to incident being recorded; and
Date of resolution of incident.
Specific corrective actions relevant to each EMP element are outlined in each relevant section. Material or
serious environmental harm shall be reported by the Site Manager to the Council as soon as they become
aware of its occurrence.
2.5.2 Environmental Complaints
Emphasis shall be placed upon timely resolution of any complaints received in relation to development of the
site and the establishment of corrective actions in response to non-conformities with the EMP (identified by
the monitoring process). The Construction Foreman shall establish and maintain a Complaints Register to
enable recording of complaints received.
Procedure
1. Complaint is received by personnel (written, verbal, email, telephone call, fax etc.).
2. Complaint is immediately forwarded to the Site Manager.
3. Upon receipt of a complaint, the Site Manager shall immediately acknowledge the complainant (either
verbally or in writing) and document the complaint in the Complaints Log. The original copy of the
complaint shall be retained if possible.
4. As soon as practicable after the receipt of the complaint the Site Manager shall notify the Council and
investigate the complaint. The Site Manager shall identify and document:
a) Operations undertaken at the time of the complaint;
b) Factors that may have contributed to the complaint; and
c) Necessary steps and implementation timeframe to address the complaint.
1101 14_PR20517_EMP.doc Page 9
Page 14
Environmental Management Plan
Peregian Beach Caravan Park
5. At the completion of the investigation, the Site Manager shall notify the complainant and Council in
writing of the results of the investigation and, if necessary, the nature and timing of any proposed
mitigation measures.
The Site Manager shall ensure that the Complaints Log is completed and all supporting documentation and
correspondence (e.g. initial complaint, complainant acknowledgement, complaint investigation report and
complainant notification etc) is retained.
& Data Management
Reporting will be required during the construction and operational phase of the development with specific
reporting requirements detailed further for each EMP element. Generally, reports must be kept of the key
environmental performance indicators, monitoring results, corrective actions, environmental incidents and
complaints, reports to management, and any reports required by law such as regulated waste tracking.
Any record or document required as an outcome of this EMP or issued by a regulatory authority must be
kept at the site office / Contrast constructions pty ltd Property office for a period of 5 years, and be available
to an authorised person. Any daily and weekly records or logs must be kept for a period of 3 years and are
then kept in the form of an annual summary after that period.
The site shall undergo regular audits to assess the compliance of management techniques as required under
this EMP. Frequency of audits is further detailed for each EMP element. The audit shall be undertaken by
an independent Environmental Officer and reports shall be submitted to the Site Manager and forwarded to
SCRC, as appropriate.
Environmental audits are to confirm that the proposed actions are appropriate and are to assess the
effectiveness of actions to achieve environmental protection. Each element of the EMP is to be assessed
relative to the Performance Criteria for the Element. Environmental audits may also identify areas that
require improvements or changes to work processes or management techniques used on the site. In cases
where changes to work process or management techniques are identified, the EMP is to be amended and
submitted to Council for approval.
The Site Manager shall perform regular inspections of the site works to identify areas that require
improvements and periodic review of environmental performance and continual improvement. Periodic
reviews of environmental performance and procedures are required to ensure the system used is still
effective, and identify opportunities for improvement. The Construction Forman will schedule periodic
meetings with operational staff to discuss and record improvement opportunities, keeping up-to-date with
industry guidelines.
110114_PR20517_EMP.doc Page 10
Page 15
Environmental Management Plan
Peregian Beach Caravan Park
3.0 Construction Phase Management Plans
CONSTRUCTION PHASE - EROSION & SEDIMENT CONTROL
This element to be read in conjunction with the Stormwater Management Plan & Sediment l Erosion Control Plan (Simmonds & Bristow, 2010) (Appendix A). Relevant
information has been extracted from this document for inclusion in this element of the EMP.
Performance Criteria No discharge of contaminated water to receiving waters;
• No deterioration in water quality (upstream or downstream of development);
n Location and velocity of drainage flow controlled;
n Exposed and/or unstable soil surfaces revegetate and stabilised; and
n Appropriately installed, operational and maintained erosion and sediment control devices and measures.
n Performance Indicators outlined in the Stormwater Management Plan / Sediment and Erosion Control Plan (Simmonds & Bristow,
2010), including:
Upslope storm water flow diversion
Effective diversion of stormwater away from the building site, and in particular away from areas of high erosion hazard;
No evidence of soil erosion on site, such as rills or sheet erosion;
Site entry and exit points
- Minimal transport of sediment offsite onto public roads by exiting vehicles:
Designated on-site stockpiles
Minimal sediment accumulation against the sediment fence;
Stockpile covered when required; and
Effective containment of waste.
Downslope sediment controls
- No rill development;
110114_PR20517_EMP.doc Page I I
Page 16
Environmental Management Plan
Peregian Beach Caravan Park
Low turbidity of sediment in overflow from the sediment fence into the terminal wetland;
Containment of stormwater behind the sediment curtain in the terminal wetland; and
Prompt connection of temporary downpipes on the building site;
Maintaining groundcover
Ground disturbance kept to the minimum required for construction;
Suitable ground coverage with remnant grass (undisturbed state), erosion blankets (short term disturbance) or reseeded grass
(longer term after disturbance); and
Lack of surface erosion.
Implementation Strategies The Construction Foreman shall provide temporary control measures as required during the course of the work to prevent soil
erosion, scouring, sediment transport and deposition;
n Install all temporary control measures as outlined in the Stormwater Management Plan / Sediment and Erosion Control Plan
(Appendix A) and identified in associated drawings prior to the commencement of bulk earthworks. Sequence of installation to occur
as described in Table 9 of the Stormwater Management Plan / Sediment and Erosion Control Plan. Recommended control measures
include:
Ups/ope storm water flow diversion
Construct a perimeter bank stabilised with erosion mats (e.g. jute mesh anchored by cold anionic bitumen emulsion) along the
upslope (eastern) edge of the development to divert flow around the building site, and onto grassed or stabilised surfaces on the
edge of the building site; and
Install geo-logs/straw wattles within the building site upslope of areas of high disturbance or high erosion hazard to direct flow
onto grassed or stabilised ground. Ensure secure pegging of geo-logs to prevent flow under the log. The edge of the log needs
to overlap the stable or grassed surface.
Site entry and exit points
Install an access path of crushed rock leading into the site, and directly to the stockpile area. Rock pads should be at least 15 m
long and 200 mm thick, with an underlying layer of geo-fabric. Use cattle ramps as part of the structure to allow 2 complete
rotations of the largest tyre leaving the site; and
110114_PR20517_EMP.doc Page 12
Page 17
"DJ Environmental Management Plan
Peregian Beach Caravan Park
- Install a high pressure water hose that can reach the rock pad, to remove cohesive mud.
Designated on-site stockpiles
Have a designated site for stockpiling excavated earth, building sand and building materials. Ensure that the stockpiles have
designated covers with pegs to protect them from wet weather, and are sufficiently distant from kerbside drains;
Install a geo-log upslope of stockpile area to divert flow around the stockpile;
Install a sediment fence down-slope of stockpile area to collect sediment; and
At the end of each day, or before the onset of rain, cover and securely peg stockpiles.
Downslope sediment controls
Install geo-textile sediment fences on the lower slopes of the building site. Posts should be minimum of 2m spacing; the base
should be buried at least 200 mm below ground. The fences should be concave upslope to bund stormwater, while allowing
lateral overflow down-slope;
Stabilise ground that accommodates overflow from the sediment fences to avoid rill development (refer to 'Maintaining
groundcover';
Direct overflow into down-slope sediment fence. Use filter socks as a final barrier to contain suspended sediment. Overflow from
the filter socks will be into the terminal wetland. Use water from the terminal wetland to irrigate ground cover (refer to
'Maintaining groundcover);
Install a sediment curtain in the terminal wetland to contain any fine sediment in overtopped stormwater; and
Install temporary downpipes from newly constructed roofs.
Maintaining groundcover
Maintain existing grass cover as much as possible. Reduce damage to grass cover by limiting vehicle movements to work areas
and designated access tracks;
Cover disturbed ground under erosion blanket, secured with pegs and with the edge buried below the soil surface;
Reseed disturbed soils that will be left bare, using hydromulch or equivalent. Irrigate reseeded area daily for four weeks to
establish the grass surface; and
Lay turf in areas where concentrated flow is expected (e.g. at the overflow of sediment fences).
110114_PR20517_EMP.doc Page 13
Page 18
a a J Environmental Management Plar
Peregian Beach Caravan Park
Education of site personnel regarding erosion and sediment control measures, including inspection and maintenance requirements;
n Scheduling of work to avoid the highest rainfall risk period, where possible;
n Ground disturbance to be kept to the minimum required for construction activities;
• Progressive stabilisation of ground disturbance;
• Disturbed and exposed ground at risk of erosion to be stabilised and as soon as possible;
• Vehicles shall keep loads covered;
• If flocculation is required to meet the total suspended solids performance objective, it is to be used in accordance with the
manufacturer's guidelines and reasonable precautions to prevent potential impacts on receiving waters;
n Permanent control measures shall be provided as soon as possible after completion in each construction area. Permanent measures
(e.g. swales/bio-retention/wetlands) to be adopted for this project are outlined in the Stormwater Management Plan / Sediment and
Erosion Control Plan (Appendix A); and
n Construction of stormwater treatment devices, including swales and bioretention basin systems shall be protected from sediment runoff
until the site is stabilised and vegetation is established.
Monitoring • A daily site checklist will be used by the Construction Foreman to ensure that contractors understand and perform the required
management actions. The checklist to be utilised is included as Appendix C of the Stormwater Management Plan / Sediment and
Erosion Control Plan (Appendix A);
• Weekly monitoring of sediment accumulation build up behind sediment fences to be undertaken by Construction Foreman;
n Performance of temporary control measures, sediment accumulation and the suspended solid content of water entering and exiting the
site, is to be monitored by Construction Foreman during significant stormwater event;
• Monthly audit and review of implemented temporary control devices and site erosion and sediment control procedures by the
Environmental Officer;
n Monitoring to be undertaken as per the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Upsiope stormwater flow diversion
Daily inspection of the structural integrity of the perimeter bank and geo-logs:
Daily inspection of the ground surface for erosion;
110114_PR20517_EMP.doc Page 14
Page 19
Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - EROSION & SEDIMENT CONTROL
Inspection of performance of the geo-log and diversion banks during a significant stormwater event (water effectively diverted to
grassed areas, low turbidity of diverted water, no erosion under the geo-log):
Site entry and exit points
- Daily inspection of the road surface beside the exit for sediment movement off the site:
Designated on-site stockpiles
Daily inspection of geo-log and sediment fence for structural integrity;
Daily inspection of the sediment fence for sediment accumulation; and
Daily inspection of stockpile for effective cover, or wetness and erosion if cover has been removed.
Downslope sediment controls
Inspection for rills immediately after rainfall events;
Daily inspection of sediment fences for structural integrity and sediment accumulation (build up behind sediment fences should
be no more than 1/3 of the fence height) weekly and immediately after a rainfall event; and
Measure suspended solids of stormwater flowing into and out of the building site during stormwater events (suspended solids in
overtopped stormwater entering the terminal wetland should not be excessively high when compared with suspended solids
entering the construction site).
Maintaining groundcover
Daily inspection of temporarily disturbed ground to ensure these areas are covered with erosion mats;
Daily inspection of bare ground to ensure reseeding and irrigation is occurring;
Inspection for rills after stormwater events; and
Measure suspended solids of stormwater flowing into and out of the building site during stormwater events (suspended solids in
water existing the site should not be excessively higher than water entering the site).
Reporting i Responsibility Reporting
n Daily inspection checklist to be completed by Construction Foreman;
• Monthly reporting by the Construction Foreman to Site Manager addressing the monitoring results during construction, including:
1 1 0 1 14_PR20517_EMP.doc Page I S
Page 20
Environmental Management Plan
Peregian Beach Caravan Park
• yl.• itn .i• k 01.. ..1 • ill[ • ..
Compliance with erosion and sediment controls;
- Performance of temporary control measures and maintenance performed;
Local weather conditions prior to monitoring;
Rainfall events and intensities;
Any corrective action taken to maintain performance requirements; and
Details of any changes required to the erosion and sediment control measures.
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective actions and document
any information provided by the Contractor.
• In the event of a non-conformance, the Site Manager is to report to the Environmental Officer. The Environmental Officer shall inspect
and record:
Nature of the non-conformance (e.g. failure of sediment fencing leading to high suspended solids);
Actions taken to prevent the non-conformance from recurring (i.e., fortification, realignment of fence or installation of upstream
cut off drain);
Provide photographic evidence of completed remedial actions; and
Provide laboratory analysis of sampling locations (inflow and outflow points) specified in Table 13 within the Stormwater
Management / Erosion and Sediment Control Plan (Appendix A).
n In the event of material or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory authorities;
and
n Copies of reports to be retained and provided to Sunshine Coast Regional Council if requested.
Responsibility
• Construction Foreman;
• Site Manager: and
n Environmental Officer.
Corrective Action n Required corrective action will be undertaken by the Construction Foreman;
110114_PR20517_EMP.doc Page 16
Page 21
Environmental Management Plan
Peregian Beach Caravan Park
Sediment that has accumulated to 1/3 of the fence height is be removed;
n In the event of material or serious environmental harm, consultation will be undertaken with Council and regulatory authorities for an
agreement to be reached in relation to appropriate corrective and preventative actions to be taken.
n Any changes or improvements to the Stormwater Management Plan / Erosion and Sediment Control Plan resulting from audits and
reviews, will be made as soon as possible following the audits and reviews;
n In the event of erosion and sediment control failure, proposed deviation from the Erosion and Sediment Control Plan or alteration to the
proposed construction sequence, the Construction Foreman is to seek written advice from the Environmental Officer. It is the
responsibility of the Construction Foreman to implement any amendments to the erosion and sediment control structures as
recommended by the Environmental Officer;
n Corrective actions to be undertaken as per the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A)
including:
Upsiope storm water flow diversion
• When loss of control of the upslope flow diversion occurs:
Follow contingency plan as outlined for EP-SECP-01 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
If necessary, remove sediment mobilised on road surfaces with a spade and broom. Do not use water;
Repair perimeter bank: reinstall berm, secure the jute mat;
Repair or replace geo-logs if damaged. Securely peg to the ground to ensure no flow under log;
Add a second geo-log 1 to 4m upslope if necessary; and
Improve the stability of ground surface that receives diverted water (refer to 'Maintaining groundcover).
Site entry and exit points
n When sediment transportation from the site access point is occurring:
Follow contingency plan as outlined for EP-SECP-02 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
Remove sediment from road surface using a spade and broom. Do not use a hose;
Building contractor to advise staff about responsibilities inherent with hosing off mud;
Install extra length of rock pad or grid if necessary;
110114_PR20517_EMP.doc Page 17
Page 22
Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - EROSION & SEDIMENT CONTROL
Improve delivery of high pressure water hose if possible; and
Avoid work under muddy conditions.
Designated on-site stockpiles
• When loss of materials from stockpiles is occurring:
Follow contingency plan as outlined for EP-SECP-03 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
Repair the geo-log, perimeter stockpile covers and sediment fence, if required:
Address upslope controls if required (refer to'Upslope stormwater flow diversion); and
Contractor to reinforce the need to cover stockpiles.
Downslope sediment controls
n When significant loss of sediment down-slope is occurring:
Follow contingency plan as outlined for EP-SECP-04 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
Improve groundcover if rills are evident;
Repair sediment fences;
Remove sediment from sediment fences and stockpile (refer to 'Designated on-site stockpiles) for later use as topsoil; and
Install temporary downpipes promptly.
Maintaining groundcover
n When water is flowing over unstable ground:
- Follow contingency plan as outlined for EP-SECP-05 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
Building contractor to reinforce the need for managing off site movement of disturbed soil because of the high environmental
values associated with Noosa National Park;
- Ensure that erosion mats are intact and properly installed: and
Ensure that re-seeding and irrigation is occurring. Install additional erosion mats, grass cover, or turf if necessary.
110114_PR20517_EMP.doc Page 18
Page 23
Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY
This element to be read in conjunction with the Stormwater Management Plan & Sediment/ Erosion Control Plan (Simmonds & Bristow, 2010) (Appendix A) and the Erosion
and Sediment Control Element (Section 3.1).
Performance Criteria n Performance requirements for water discharge(s) during construction of the site include (in accordance with the
construction phase objectives in the Noosa River: Environmental Values and Water Quality Objectives 2007 and
Queensland Water Quality Guidelines 2009):
Total suspended solids <50 mg/L and/or 80% reduction in suspended solids compared to untreated stormwater
runoff from the developed part of the site;
60% reduction in Total Phosphorus compared to untreated stormwater runoff from the developed part of the site;
45% reduction in Total Nitrogen compared to untreated stormwater runoff from the developed part of the site;
pH 6.5 - 8.5; and
Turbidity: Discharge <50NTU and/or released waters from approved discharge point/s have turbidity less than 10%
above that of receiving waters (measured immediately upstream of the site).
n No exposure of acid sulfate soils (ASS) to the external environment;
n Correct management of acid sulfate soils if exposure occurs;
• No discharge of contaminated water to receiving waters;
n No deterioration in water quality in adjacent surface waters; and
• No deterioration in groundwater quality.
Implementation Strategies n Implement all erosion and sediment temporary control measures (as outlined in the Soil Erosion and Sediment Control
element of this EMP; Section 3.1, and the Stormwater Management Plan / Sediment and Erosion Control Plan Appendix
A) prior to the commencement of bulk earthworks;
n Implement all Hazardous Substances and Waste Management implementation strategies (as outlined in the EMP;
Section 3.3 & Section 3.10);
n All contractors are to be trained during site inductions on the identification of Potential Acid Sulfate Soils (PASS) and ASS.
Common indicators of PASS or ASS include:
110114_PR20517-EMP.doc Page 19
Page 24
Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY
Presence of dark grey sands or clays (e.g. mangrove mud);
Presence of very clean water or clean bluish water;
Soils which exhibit sulphurous odour; and
Presence of iron (red coloured) stains in water or on soil.
n Any excavation works consisting of 100m3 or greater which extends below 5m AHD will need to be carried out in
accordance with State Planning Policy 2102 Planning and Managing Development Involving Acid Sulfate Soils. Appropriate
testing and supporting documentation prepared by a suitably qualified specialist shall be submitted to Council for approval
prior to obtaining a Development Permit for Operational Works;
n Should exposure of acid sulfate soils occur, the following steps should be implemented:
Stop excavation in the area; and
Advice should be sought from an appropriate qualified professional on specific treatment methods (e.g. liming of the
affected material).
n All stockpiles to be located in accordance with Stormwater Management Plan / Sediment and Erosion Control Plan
Appendix A;
n Where chemical treatment is required, chemicals will be kept away from sensitive areas and the selected chemical should
be frog friendly such as BioactiveTM Herbicide, Roundup or Weedmaster Herbicide. Broad scale spraying is not permitted;
n Permanent control measures are to be installed as soon as possible after completion in each construction area. Permanent
measures (e.g. vegetated buffers, bio-retention trenches, constructed wetland system) are to be installed as outlined in the
Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A).
Monitoring A daily site checklist will be used by the Construction Foreman to ensure that contractors understand and perform the
required management actions. The checklist to be utilised is included as Appendix C of the Stormwater Management Plan /
Sediment and Erosion Control Plan (Appendix A);
n Daily visual inspections of excavation works for PASS & ASS;
Monthly audit and review of implemented temporary control devices and site erosion and sediment control procedures by
the Environmental Officer;
Monthly water quality monitoring during the construction phase to be conducted by the Environmental Officer, as per the
monitoring schedule, methodology and locations outlined in Stormwater Management Plan / Sediment and Erosion Control
Plan; (Appendix A). The following water quality parameters are to be monitored:
1101 14_PR20517_EMP.doc Page 20
Page 25
Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY
pH;
Dissolved oxygen;
BOD5
Suspended Solids;
Total Nitrogen;
Total Phosphorus;
Herbicides;
Faecal coliforms;
Enterococci; and
Turbidity.
• Measure suspended solids of stormwater flowing into and out of the building site during stormwater events;
• A rain gauge is to be installed on site to monitor rainfall intensity during stormwater events;
n Herbicide monitoring in stormwater entering and leaving construction site should be performed when applications are
known to occur; and
n Refer to the monitoring in Section 3.1 (Soil Erosion and Sediment Control Element in EMP).
Reporting / Responsibility Reporting
n Daily inspection checklist to be completed by Construction Foreman;
n Monthly reporting by the Construction Foreman to Site Manager addressing the monitoring results during construction,
including:
Compliance with erosion and sediment controls;
Local weather conditions prior to monitoring;
Outcomes from monitoring conducted throughout stormwater events:
Any corrective action taken to maintain performance requirements;
Details of any changes required to the erosion and sediment control measures;
Incidences of untreated stormwater release;
Records of leachate staining or environmental harm in receiving waters; and
Records of any general water quality deterioration of water quality in adjacent waterways.
• Copies will be provided to Sunshine Coast Regional Council if requested.
1101 14_PR20517_EMP.doc Page 21
Page 26
Environmental Management Plan
Peregian Beach Caravan Park
CONSTRUCTION PHASE - SURFACE & GROUND WATER QUALITY
Monthly audit to be completed by Environmental Officer, and should include any recommended corrective action and
document any information provided by the contractor;
n Monthly water quality monitoring to be completed by Environmental Officer.
n In the event of non-conformance, the Site Manager is to report to the Environmental Officer. The Environmental Officer
shall inspect and record:
Nature of the non-conformance:
Actions taken to prevent the non-conformance from recurring;
Provide photographic evidence of completed remedial actions; and
Provide laboratory analysis of sampling locations.
• In the event of material, or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory
authorities.
Responsibility
• Construction Foreman;
• Site Manager; and
• Environmental Officer.
Corrective Action n Corrective action will be undertaken by the Construction Foreman;
• In the event of serious environmental harm, consultation will be undertaken with Council and regulatory authorities for an
agreement to be reached in relation to appropriate corrective and preventative actions to be taken;
• In the event of exposure of release of PASS or ASS, consultation will be undertaken with an appropriately qualified
professional and agreement reached in relation to appropriate corrective and preventative actions to be taken;
• Corrective actions outlined in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A)
including those outlined in Section 3.1 of this EMP.
1101 14_PR20517_EMP.doc Page 22
Page 27
Environmental Management Plan
up, Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - HAZARDOUS SUBSTANCES
Performance Criteria Hazardous substances from the construction site are properly managed and do not pollute surface water runoff and
adjacent wetlands;
• No uncontrolled spills of oils, fuels and chemicals to the external environment;
n Storage of all hazardous materials complies with the requirements of relevant legislation, Australian Standards and/or
Codes of Practice, including Environmental Protection (Waste Management) Policy 2000, Dangerous Goods Safety
Management Act 2001, AS 1940: 2004 The storage and handling of flammable and combustible liquids, Workplace Health
and Safety Act 1995 and Carriage of Dangerous Goods by Road Act 1984; and
n Clean-up equipment and materials made available on-site at all times.
Implementation Strategies Handing and Storage
n The storage of flammable and combustible liquids will be in accordance with Australian Standard (AS)1940-2004;
• A copy of Material Safety Data Sheets (MSDS's) to be provided and made readily available to construction Contractors for
all hazardous and/or potentially polluting material;
n Any spill must be cleaned up in accordance with the MSDS's and the Environmental Emergency Response Plan:
n All employees and subcontractors will be trained on the handling and use of hazardous substances as part of the site
induction process;
n Transport, use and storage of hazardous materials on the Project shall be in accordance with the requirements of:
the relevant MSDS's;
Part 37 "Hazardous Substances" of the Workplace Health and Safety Regulation 1997;
the Code of Practice "The Management of Hazardous Substances at Work";
the Dangerous Goods Safety Management Act 2001 and Dangerous Goods Safety Management Regulation 2001;
AS 1940-2004 The Storage and Handling of Flammable and Combustible Liquids.
• Retain only minimal required quantities of chemicals, fuels, oils, etc on site during construction at any particular time;
• Arrange for delivery of products on an 'as required' basis;
• No permanent storage of potential contaminants on site;
• Chemicals, fuels, oils, etc shall be stored within an impervious bunded area or compound in accordance with the Australian
Standards and/or Codes of Practice and will be located at least 50 m from waterbodies;
n Suitable quantity of absorbent material (e.g. Enretech) is to be available near storage areas in case of a spill;
1 101 14_PR20517_EMP.doc Page 23
Page 28
Environmental Management Plan
Peregian Beach Caravan Park
n Fuelling, maintenance and washing of plant and equipment shall be conducted where practicable within a bunded area on
site with facilities for the storage, removal or disposal of wastewater;
Spills and disposal
n All contractors are to be trained during site inductions on spill and clean up procedures;
n Clean-up equipment, absorbent materials, and any materials for neutralising or decontaminating spills on the premises will
be kept in a safe accessible location on site and contractors will be adequately trained In the use of these materials;
n Clean-up of spills or leaks will occur immediately. Contaminated materials will not to be reused and will be appropriately
contained and packaged for transport for either recycling or disposal by a licensed waste removal contractor;
n Spill clean up kits shall be kept in relevant locations throughout the site;
• In the event of a spill, immediate actions shall be taken to contain the spill to prevent contamination. The Construction
Foreman shall be informed as soon as practicable; and
• The use of sawdust or other readily combustible absorbents to clean up flammable liquid spills will be avoided. A suitable
clean up kit shall be kept on site and personnel trained in the use of such equipment. Records of training shall be kept
within the personnel file of each employee.
Other
• Only minor servicing of vehicles shall take place (e.g. replace burst hydraulic hoses). All other servicing shall be
undertaken off site:
n Any areas where petroleum products and/or other potentially hazardous substances were stored should be
decommissioned and where necessary remediated at the completion of construction works;
• Material Safety Data Sheets (MSDS's) for all hazardous substances used or stored on site will be kept in a register; and
n Paint washdown facilities with provision of effluent collection shall be established.
Monitoring • Weekly visual inspections of construction works, storage areas, plant and equipment by the Construction Foreman to
ensure appropriate hazardous substances management performance;
n Containment of contaminated water within the bunding is to be monitored by the Construction Foreman during significant
rainfall event; and
n Monthly audit and review of storage locations and procedures by the Environmental Officer.
Reporting! Responsibility Reporting
n Chemical inventory and storage locations to be maintained by the Construction Foreman;
1101 14_PR20517_EMP.doc Page 24
Page 29
Environmental Management Plan
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - HAZARDOUS SUBSTANCES
Weekly records of visual inspections by Construction Foreman;
• Monthly reporting by the Construction Foreman to Site Manager covering all monitoring activities and results as well as
compliance with performance criteria;
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman;
n Non-conformance and complaint details will be forwarded to the Site Manager as soon as practicable;
• All complaints or incidents of non-compliance are to be recorded on the site Incidents and Complaints Register (refer to
Section 2.5);
n In the event of a spill the following additional details are to be recorded in the Incidents and Complaints Register:
Reasons why the spill occurred;
Quantity and type of oil/chemical spilled;
Actions implemented to clean up the spill;
Method of disposal of used absorbent and spilled petroleum product;
Details of any potential or actual environmental harm caused consequent to the spill; and
Cost to clean up spill (all costs of materials and labour).
• The Site Manager is to report any events of non-conformance to the Environmental Officer;
n In the event of material or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory
authorities;
Responsibility
• The Construction Foreman
n Site Manager
n Environmental Officer
n Steps to be implemented if a spill occurs:
Corrective Action
stop the spillage or leakage at the source;
ensure the spill does not leave the site, enter waterbodies or drains by bunding (e.g. earth mound, filter sock,
Enretech);
chemical spills to be cleaned up in accordance with the relevant Material Safety Data Sheet for the product spilled;
Use absorbent materials (e.g. Enretech (land spills) or Cellusorb (water spills) to isolate and clean up the spills;
1101 14_PR20517_EMP.doc Page 25
Page 30
Environmental Management Plan
Peregian Beach Caravan Park
Recover used absorbent materials and petroleum product and place in a sealed container. Clearly label the
container to identify its contents;
Organise a waste contractor, licensed to receive such waste under the Environmental Protection Act 1994, to collect
and treat/dispose of the container;
• Clean-up equipment and materials repaired and replaced as required;
n Corrective actions to be developed in consultation with Sunshine Coast Regional Council and relevant regulatory agencies,
where required;
n The Construction Foreman shall alter procedures or apply, as necessary to produce compliance with the performance
objectives / indicators;
n In the event of a spill the Construction Foreman shall delegate clean up works, as required; and
n The Construction Foreman reserves the right to request any works necessary to maintain compliance.
1 101 14_PR20517_EMP.doc Page 26
Page 31
Environmental Management Plan
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - VEGETATION PROTECTION
This element to be read in conjunction with the Ecological Restoration Plan (RPS, 2010) (Appendix B) and the Arborist Report (Leaf & Limb, 2010) (Appendix C). Relevant
information has been extracted from these documents for inclusion in this element of the EMP. This element is also related to the Bushfire Management and Fauna Elements,
which also should be read I considered when implementing this Element.
Performance Criteria • To clear and dispose of trees and other vegetation in a manner acceptable to Sunshine Coast Regional Council;
• Avoid damage to vegetation to be retained on the site as identified in the Arborist Report (Appendix C);
• Limit tree and vegetation clearing to only those areas required for the particular stage of earthworks being completed;
• Appropriately rehabilitate and manage those areas identified in the Ecological Restoration Plan (Appendix B);
• Performance criteria outlined in the Ecological Restoration Plan, including:
all treatments for rehabilitation zones 1 and 2 completed;
weed removal on peripheral edges of the parkland area are completed and maintained;
all rubbish, foreign material, old fencing etc is removed; and
fauna and sediment fencing in place.
Implementation Strategies Tree Retention / Removal
n Vegetation shall not be cleared without the necessary clearing permits by relevant administering authority / Council;
n Emphasis shall be placed on retaining existing vegetation until its removal is strictly necessary;
n Trees within the existing entrance turnaround (Tree number 7, 8 & 9) and on the western side of the proposed gabion wall
are to be retained as identified in the Arborist Report (Appendix C);
n The Tree Management and Protection Plan outlined in the Arborist Report (Appendix C) is to be implemented and a copy
to be retained on site:
n A suitably qualified site Arborist is to supervise all tree protection procedures prior to the commencement of construction
works as well as any earthwork activities within the site during construction;
• Prior to the pre-start meeting, all vegetation to be retained is to be clearly marked on construction plans and in the field.
Large areas of vegetation and individual trees to be retained are to be fenced off using temporary fencing in accordance
with AS 4970-2009. Fencing is to be installed around the Tree Protection Zone (TPZ) as per AS 4970-2009;
• The TPZ of retained trees are to be mulched and irrigated on a weekly basis;
• All vegetation retention areas will be fenced and clearly identified as a 'Vegetation Protection Area' prior to the
commencement of any works. These exclusion fences shall be maintained throughout the construction period. Access to
1101 14_PR20517_EMP.doc Page 27
Page 32
Environmental Management Plan
Peregian Beach Caravan Park
retained vegetation will only be allowed for weed removal purposes by a suitably qualified restoration team (in accordance
with the Ecological Restoration Plan; Appendix B);
n The following activities are not to occur within the areas of retained vegetation including the TPZ - vehicle movements,
storage and mixing of materials, vehicle parking, liquid disposal, machinery repairs and/or refuelling, construction site office
or shed, combustion of any material, stockpiling of soil, rubble or debris, and any filling or excavation including trenching,
topsoil skimming and/or surface excavation;
n Construction workers are to be specifically advised of areas and individual trees that are to be retained;
• All tree surgery and pruning works will be undertaken by a suitably qualified and experienced arborist in accordance with
Australian Standard AS4373:1996 Pruning of Amenity Trees;
n All activities in areas adjacent to protected vegetation shall be carried out in such a manner as to minimise any damage to
trees and/or the conserved area;
n Tree limbs (of trees to be retained) that are likely to be in the way of earthworks shall be pruned by a qualified tree surgeon
prior to construction activity commencing (in accordance with the Arborist Report; Appendix C);
n Stockpiling of felled trees will only occur within the development footprint (i.e. areas to be cleared);
• No roots greater than 25mm shall be cut during construction without the consent of the site arborist;
n At least one day prior to vegetation removal a wildlife spotter-catcher will assess the site for the presence of native fauna
and undertake procedures outlined in the Fauna Protection Element (Section 3.7);
n Vegetation clearing to be undertaken in a sequential manner and in stages, in a manner where only the minimum amount
of ground is open at any one time. Rehabilitation/landscaping of disturbed areas to commence immediately after clearing,
where appropriate;
n Upon completion of clearing works the Site Arborist is to undertake an assessment to determine the health and vigour of all
retained trees;
• Cleared native vegetation is to be processed by one of the following methods and removed from the site:
Re-use for building materials;
Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less
than 1000m3, less than 2.5m high with a minimum of 1 Om between edges of heaps;
Disposal for firewood:
Disposal for landscaping purposes; or
110114_PR20517_EMP.doc Page 28
Page 33
Environmental Management Plan
Peregian Beach Caravan Park
- Transport to alternative site for breaking down materials provided that all necessary permits have been obtained
to allow the alternate site to be used for this purpose; and
Rehabilitation Works
n Wire fauna fence is to be erected around the parkland boundary to prevent any unauthorised access to the area during
construction;
n Construction workers are to be specifically advised of the restrictions applying to the rehabilitation areas;
n All erosion and sediment control devices are to be in place to prevent damage to the parkland area;
n Weed management is to be implemented on the site in accordance with the methods outlined in the Ecological Restoration
Plan (Appendix B) (refer to the Weed and Pest Control element of this EMP; Section 3.5); and
n Implementation of any other control measures nominated in the Ecological Restoration Plan (Appendix B).
Monitoring n Daily inspection of retained vegetation areas by the Construction Foreman to ensure fencing and signage is in place, mulch
levels are correct within the TPZ and retained vegetation is not damaged;
n Daily monitoring of clearing techniques by a qualified Arborist to ensure there are no non-conformances;
n A qualified Arborist shall monitor the health and structural integrity of the trees and vegetation to be retained. This
monitoring shall occur at least monthly during the construction period;
n Wire fencing around the parkland area is to be inspected regularly to ensure it remains properly installed; and
n All weed removal activities have been undertaken.
Reporting / Responsibility Reporting
n Monthly reporting by the Construction Foreman to Site Manager of:
All monitoring and inspection activities;
Implementation strategies and compliance with performance criteria; and
Corrective action undertaken.
n Copies of the report to be provided to Sunshine Coast Regional Council if requested:
n Any incidents of non-compliance to be recorded in the Incidents and Complaints Register (Section 2.5);
n The Construction Foreman to immediately notify the Site Manager of any unauthorised damage to retained vegetation on
the site who is then to notify the Site Aborist and Environmental Officer;
n Council to be notified of the non-compliance incident, where appropriate; and
n Site Arborist is to provide a report detailing clearing works and health of retained trees post clearing works, where required.
1101 14_PR20517_EMP.doc Page 29
Page 34
Environmental Management Plar
Peregian Beach Caravan Park
Responsibility
• Construction Foreman
• Site Manager
n Site Arborist
Corrective Action • If clearing and disposal methods are not consistent with Sunshine Coast Regional Council's guidelines, necessary changes
shall be made to comply with the guidelines, as required;
• In the event of accidental tree clearing, fencing to be reinstated and the Site Arborist and Council notified;
n Rehabilitation of any non-authorised vegetation clearing will be done in consultation with the Site Arborist and Council;
n Reinstate fencing of retained vegetation and around the parkland area, where necessary;
n The Construction Foreman shall alter procedures or apply corrective action after consultation with the Site Manager and
Site Arborist, as necessary to produce compliance with the performance indicator;
n Any decline in tree health or structural integrity shall be rectified in accordance with the Site Arborist's recommendations;
and
n In the event of a fauna injury, spotter-catcher to coordinate with a local veterinary surgery (refer to the Fauna Protection
Element. Section 3.7).
1101 14_PR20517_EMP.doc Page 30
Page 35
Environmental Management Plan
F • J
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - WEED & PEST CONTROL
This element to be read in conjunction with the Ecological Restoration Plan (RPS, 2010) (Appendix B). Relevant information has been extracted from this document for
inclusion in this element of the EMP.
n To minimise the growth and transfer of noxious plants and weeds; and
Performance Criteria
• To minimise the impact of feral animals on the site, particularly retained vegetation.
n Prior to vegetation clearing, weeds on the site will first be removed by qualified personnel with training in weed identification and
Implementation Strategies
management;
n All Class 2 and Class 3 weeds declared under the Land Protection (Pest and Stock Route Management) Act 2002 and all environmental
weed species listed by Sunshine Coast Regional Council that occur within the subject site shall be eradicated;
n Weed removal activities are to be undertaken within areas of retained vegetation (in accordance with the Ecological Restoration Plan;
Appendix B);
n Weed control will be conducted primarily by mechanical means. Mechanical control methods include:
Manual removal by hand or grubbing by using loppers, hatchets or small saws to remove the weed including the roots;
Lopping where the weed is removed by an axe or chainsaw;
Mowing or brush-cutting to remove the seed heads of the weed; and
n Ringbarking, which involves removing the sapwood around the entire girth of the trunk near the base of the plant.
n Where chemical treatment is required, chemicals will be kept away from sensitive areas and the selected chemical should be frog friendly
such as BioactiveTM Herbicide, Roundup or Weedmaster Herbicide. Broad scale spraying is not permitted;
n Any herbicides will be used in accordance with manufacturers' and Queensland Primary Industries & Fisheries (QPI&F) fact sheets;
n A chemical register and Material Safety Data Sheets shall be kept on site for any herbicides and pesticides used;
• All weeds and exotic vegetation cleared (or weed affected material) from the site shall be separated from the balance of cleared vegetation.
This material shall be disposed at Sunshine Coast Regional Council dump sites;
n Burning is not an appropriate disposal method of cleared vegetation (weed or native):
n Stockpiles of native vegetation area to be inspected for weed species and weeds removed prior to export off site or mulching;
n Machinery shall be thoroughly washed and cleaned free of dirt in an appropriate wash facility prior to any construction equipment being
mobilised to site to ensure that no weeds are transferred to the site:
n Prior to entering or leaving the site, all vehicles and equipment involved in clearing and weed removal works should be cleaned down to
1101 14_PR20517_EMP.doc Page 31
Page 36
Environmental Management Plan
Peregian Beach Caravan Park
1 f• ^410^Ui I. • •,.
remove soil and plant material to prevent spreading of soil-borne diseases and weed seeds or plant material;
n Declared weeds as defined by the Land Protection (Pest and Stock Route Management) Act 2002 as well as noxious weeds are not to be
planted on site;
n All nursery stock for rehabilitation works shall be weed, pest and disease free and certified as such by the supplier where feasible. The
certificates are to be obtained prior to the commencement of any regeneration / revegetation works on site and shall be made available to
Council upon request;
n Soil disturbance within vegetation to be retained shall be avoided to prevent weed recruitment;
n Pest animal control measures, where necessary, shall be completed using suitable strategies as employed elsewhere within the Council
area;
n Domestic animals shall not be allowed on the site during construction;
n All stormwater treatment and sediment control devices shall be designed and managed so they do not create breeding habitat for mosquitoes
and cane toads (e.g. ponds of standing water);
n As the site is not recognised as a Fire Ant Restricted Area, advice from the QPI&F is not required on the movement of extracted or waste soil,
retaining soil, turf, pot plants, plant material, baled hay/straw or mulch/green waste/ fuel out of the site. However, any material sourced from
outside the site should come from either areas outside of a Restricted Area or from businesses with a OPI&F approved Risk Management
Plan.
Monitoring • Weekly visual surveys by the Construction Foreman to monitor weed management performance;
• Weekly visual surveys by the Construction Foreman of areas surrounding wash down sites for germination of weeds:
• Weekly visual surveys by the Construction Foreman of the site to detect any the spreading of any new weed incursions;
n Incidental monitoring of feral animals on the site by Construction Foreman; and
• Monthly audit and review of weed levels on site by the Environmental Officer.
Reporting / Responsibility Reporting
n Monthly reporting by the Construction Foreman to Site Manager of:
All monitoring and inspection activities;
Implementation strategies and compliance with performance criteria; and
Corrective action undertaken.
• Copies of the report to be provided to Sunshine Coast Regional Council if requested;
n Any incidents of non-compliance to be recorded in the Incidents and Complaints Register (Section 2.5); and
1 101 14_PR20517_EMP.doc Page 32
Page 37
Environmental Management Plan
Peregian Beach Caravan Park
DESIGN I CONSTRUCTION PHASE - WEED A PEST CONTROL
• Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and document any
information provided by the Construction Foreman.
Responsibility
n Construction Foreman
n Environmental Officer
n Undertake additional weed removal to treat germinated or regrown weed species: and
Corrective Action
n Appropriate feral animal control implemented, where required, following results of monitoring.
110114_PR20517_EMP.doc Page 33
Page 38
• • J Environmental Management Plan
Peregian Beach Caravan Park
• •11,•x. 'a:. n ^i^
Performance Criteria No increase in bushfire hazard for the site and surrounding properties;
Correct access for Queensland Fire and Rescue Service (QRRS) to all parts of the site at all times;
• Firebreaks are established;
• Fuel loads in protected areas are maintained at acceptable levels; and
• Development and construction site layouts to ensure no hindrance for local fire brigades access and capacity to undertake
fire fighting.
n Measures outlined in the Fire Management Plan (Appendix E) to implement during the construction phase include the
Implementation Strategies
following:
Construction of a 6m unvegetated setback west of the buildings with a surface to allow emergency fire vehicle
access;
Fire hydrants to be placed between buildings along the western edge of the development (nominally 3-4);
All buildings adjacent to the buffer to have roof sprinkler system installed;
All building materials to be of highest Australian Standards for fire proof materials and construction (particularly
those near the buffer vegetation);
Leaf guards to be installed in all gutters; and
Planting of fire "barrier" species along edge (interface) of buffer and between buildings (e.g. Macaranga
tanarius).
• All necessary firebreaks and emergency access points will be constructed and maintained in accordance with the Fire
Management Plan and Reconfiguration Plan (Appendix E);
n Construction site layout plans shall show assembly and safe areas for fires during the construction phase;
n A Fire Safety Plan for the construction site is to be developed which includes evacuation procedures, designated safety
gathering point, designated low-risk safety bunded areas for refuelling area (if applicable), and machinery and vehicles
fitted with fire extinguishers;
• Inform all site workers on the Fire Safety Plan and other fire safety aspects of the site;
• Adequate and accessible water supplies will be on-hand for fire-fighting purposes;
n Prescribed burning within the parkland to be undertaken if deemed necessary by Council and is to be consistent with the
Noosa National Park Management Plan objectives and outcomes;
1 101 14_PR20517_EMP.doc Page 34
Page 39
Environmental Management Plan
Peregian Beach Caravan Park
No burning of waste or open fires allowed on site;
n No storage or dumping of waste or combustible material/structures in parkland areas;
n No Ignition sources allowed in/near re-fuelling areas (if applicable) or in/within parkland areas;
n Less flammable/fire retardant species are to be considered in the Landscaping and areas close to potential bushfire
sources/adjacent to fire protection zones/setback areas adjoining the development; and
n In the event of a fire or bushfire contact 000 immediately.
Monitoring • Daily visual inspections by the Construction Foreman for compliance with the Fire Safety Plan, condition of fire breaks,
condition of emergency access and signs of inappropriate dumping and waste disposal;
n Monthly audit and review of firebreaks and emergency access by the Environmental Officer; and
n Annual assessment and monitoring of fuel loads within the parkland area to be undertaken by appropriately qualified
personnel.
Reporting / Responsibility Reporting
n Any incidents of non-compliance to be recorded in the Incidents and Complaints Register (Section 2.5) e.g. poor condition
of fire breaks, poor condition of emergency access and signs of inappropriate dumping and waste disposal;
• Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman;
Responsibility
• Construction Foreman
n Site Manager
n Environmental Officer
n Consultation will be undertaken with an appropriately qualified bushfire consultant and agreement reached in relation to
Corrective Action
appropriate corrective and preventative actions to be taken;
n Replacement planting where required (e.g. fire "barrier" species along the edge of the buffer and between buildings); and
n Amend construction site layout to minimise bushfire risk.
1101 14_PR20517_EMP.doc Page 35
Page 40
Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria Minimal disturbance to fauna;
No fauna injured or killed;
No destruction of habitat other than that designated for the development; and
Significant habitat on the site retained.
Implementation Strategies Habitat
n Carry out the minimum required vegetation clearing (as outlined in the Vegetation Protection Element, Section 3.4, and in accordance with
the Arborist Report; Appendix C);
• All areas of retained vegetation and associate habitat to be identified and clearly demarcated (i.e. fenced and signed);
• Any fauna habitat resources from clearing works (e.g. hollow logs, rocks) will be salvaged from clearing works. These are to be relocated
into the parkland area;
• Vegetation clearing shall be conducted in a staged and sequential manner to allow fauna to move off the site of their own accord;
n Clearing will occur from disturbed areas towards areas of vegetation to be retained;
n Retained vegetation will be rehabilitated in accordance with the Ecological Restoration Plan (Appendix B);
n Felled vegetation piles and earth are to be immediately mulched and moved off-site, or wildlife-proof barriers are to be erected to prevent
wildlife use;
• Old piles of felled vegetation or other material must be assumed to be inhabited by wildlife, unless proven otherwise.
Fauna Injury / Collision
• Construction work to be limited to daylight hours. Precautionary measures are to be implemented during dawn and dusk to avoid impacts on
fauna such as lower speed limits, any lighting to be limited and directed away from retained habitat;
• Contractors are to be made aware of the significance of the habitat areas adjacent to the site (i.e. Noosa National Park) and the importance
of minimising impact on native fauna;
• The developer shall appoint a qualified ecologist or a spotter-catcher (operating under a current DERM issued rehabilitation permit) and
provide their details to Council at least 14 days prior to any vegetation removal or earthworks;
n One day prior to vegetation removal, the fauna spotter-catcher will inspect for the presence of fauna (occupation, nesting, hollows) in all
vegetation to be removed. Where fauna is identified as utilising vegetation it will be marked with flagging tape;
• On the day of vegetation clearing, all trees marked with flagging tape and remaining vegetation to be removed will be inspected for fauna.
Should hollow bearing trees showing signs of fauna use and / or persistent fauna be identified in vegetation to be cleared, it must be either
1 101 14_PR20517_EMP.doc Page 36
Page 41
Environmental Management Plan
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - FAUNA
allowed to move from the site in its own time or be carefully removed and relocated by the spotter catcher (using approved fauna capture
procedures and equipment) to suitable habitat off site;
n The spotter-catcher will be present at all times during vegetation clearing;
n If a Koala is spotted (by any person) in a tree on site during vegetation clearing works, the tree containing the Koala/s and the surrounding
trees must not be cleared on that day. These trees may only be cleared on subsequent days if the Koalas has relocated at their own will;
n In the event of an Injury to fauna during construction, the spotter-catcher is to place it in an adequately ventilated box in a quiet and shady
location and taken to Queensland Parks and Wildlife Service (QPWS), local veterinary surgery or registered wildlife carer immediately for
treatment;
n Any injured fauna to be reported to Council;
n No domestic pets (including dogs, cats) allowed on the site;
n No barbed wire or electric fencing to be utilised at any time on the site; and
n Pool design and fencing to comply with the Koala Safety Fencing and Measures Guideline (2009).
n Daily inspection of retained areas by the Construction Foreman to ensure fencing is in place and no damaged is evident;
Monitoring
n Daily monitoring of clearing techniques;
n Daily observations by all personnel of any fauna species using the site;
n The spotter-catcher shall supervise all works involving habitat removal until satisfied that native fauna have been suitably relocated; and
n Monthly audit and review of fauna management procedures by the Environmental Officer.
Reporting / Responsibility Reporting
• Any injured fauna on the site immediately reported to Council and QPWS (1300 130 372);
n Daily records of inspections, monitoring activities and observations to be kept by the Construction Foreman;
n The spotter-catcher shall instruct the developer when no further action is required in relation to fauna relocation;
• Spotter-catcher to keep a daily log of animals captured, released and any injury or death, which is to be forwarded to Council; and
• Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and document any
information provided by the Construction Foreman.
Responsibility
• Construction Foreman
n Spotter-catcher
n Environmental Officer
1 101 14_PR20517_EMP.doc Page 37
Page 42
Environmental Management Plan
Peregian Beach Caravan Park
Corrective Action Reinstate barricading and signage, where required;
Modify clearing techniques, where necessary;
• In the event of accidental clearing of fauna habitat, fencing is to be reinstated and Council notified (refer to the Vegetation Management
Element, Section 3.4); and
n Rehabilitation of any non-authorised clearing will be done in consultation with Council (Vegetation Management Element, Section 3.4).
1101 14_PR20517_EMP.doc Page 38
Page 43
Environmental Management Plan
Peregian Beach Caravan Park
>aual tty
DESIGN / CONSTRUCTION PHASE - AIR QUALITY
Performance Criteria Comply with:
Environmental Protection Act 1994;
Environmental Protection Policy (Air) 2008;
Relevant Sunshine Coast Regional Council by-laws; and
Health and safety requirements.
n Construction works shall not result in the creation of air nuisance. Air emissions are not considered a nuisance should monitoring of air
quality satisfy the standards listed below':
Total Suspended Particulate (Annual averaged dust concentration) = 90ug/m3
Dust Particles as PM102 (24 hour averaged dust concentration) = 50pg/m3
Visibility reducing particles (1 hr average) = 20km visibility).
n No visible dust emissions beyond the site boundaries; and
• No complaints from adjacent landholders.
Implementation Strategies Odour & Fumes
n All equipment shall be efficient and operated in an efficient manner to minimise exhaust emissions;
n Engines shall not be left idling needlessly;
n All vehicles and plant shall be properly maintained;
n Ensure that emission levels of all vehicles and plant are less than the limits defined by relevant Commonwealth Department of Infrastructure,
Transport, Regional Development and Local Government Australian Design Rules for Vehicle Emissions:
ADR30 - Diesel Engine Exhaust Smoke Emissions;
ADR36 - Exhaust Emission Control for Heavy Duty Vehicles;
ADR37 - Emission Control for Light Vehicles; and
ADR70 - Exhaust Emission Control for Diesel Engine Vehicles.
n No burning of waste material;
• Wastes shall be stored and managed in a manner that prevents odour emissions.
Please note: Concentrations detailed in the Environmental Protection (Air) Policy 1997 are considered the maximum concentrations allowable.
z Note: PM10 is the suspended particulate matter less than 10 microns in diameter.
1 101 14_PR20517_EMP.doc Page 39
Page 44
Environmental Management Plan
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - AIR QUALITY
Dust
n Completion of tree and vegetation clearing in stages, in an order that minimises the area exposed at any one time:
• Clear only the minimum area required in accordance with the Arborist Report (Appendix C) (refer to the Vegetation Protection Element,
Section 3.4);
• Exposed soil / disturbed areas are to be stabilised as soon as possible after the disturbance using mulch or other suitable covers;
n Rehabilitation/landscaping of disturbed area, as soon as practical;
• Covering of loads entering and leaving the site;
• Collection of material on sealed public roads which falls from trucks or their wheels by sweeping on a regular basis;
• Use of recycled water trucks or other dust suppressants to work areas and haul routes on an as required basis to prevent dust nuisance;
n All recycled water to be obtained from Council designated points;
n Limit the amount and extent of stockpiling;
n Stabilisation of stockpile areas to occur immediately. Stockpiles of finer materials to be covered with denser material resistant to wind blow
(e.g. clay soil or covered with tarps) or use of some other stabilisation process (e.g. spray on binders, hydromulch, etc):
n A speed limit of 30 km/hr shall apply to all vehicles on the site;
• Shaker grids to be installed at access points and access tracks to be armoured where required to remove mud and sand from haul trucks
leaving the site; and
• Wind break screens shall be employed where considered necessary between working areas and abutting vegetation and development.
Monitoring • Daily site inspections by the Construction Foreman of the:
Types;
Locations; and
Details of control measures in place.
n Weekly monitoring by the Construction Foreman on the effectiveness of control measures in place by assessing against the Performance
Objectives/indicators for this element:
n If requested by Council in response to a complaint of nuisance, air quality monitoring shall be undertaken by a suitably qualified consultant
in accordance with DERM's Air Quality Sampling Manual (1997); and
n Monthly audit and review of control measures implemented on site by the Environmental Officer.
Reporting / Responsibility Reporting
n Construction Foreman to maintain regular records of meteorological conditions, i.e. wind speed, direction and rainfall (records to be obtained
1101 14-PR20517-EMP.doc Page 40
Page 45
Environmental Management Plan
o
Peregian Beach Caravan Park
DESIGN I CONSTRUCTION PHASE - AIR QUALITY
from closest weather station):
• Recording of all incidents, air quality complaints received and details of all control measures undertaken in the Incidents and Complaints
Register (Section 2.5):
n Construction Foreman to report all complaints to the Site Manager who is to then inform Contrast Constructions Pty Ltd:
n All complaints received by Contrast Constructions Pty Ltd from the public or advised by Sunshine Coast Regional Council shall be forwarded
to the Site Manager and Construction Foreman to be entered on the Incidents and Complaints Register for the project together with adopted
remedial measures;
• Reporting of any air quality monitoring to be undertaken by a suitably qualified consultant. A copy of the report shall be provided to Council
upon request:
n Monthly reports completed by the Construction Foreman of complaints received, including details of any monitoring activities, control
measures and corrective actions subsequently undertaken. This report will be available upon request from responsible regulatory authorities;
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and document any
information provided by the Construction Foreman.
Responsible Person
Site Manager.
The Construction Foreman.
Suitably qualified air quality consultant.
Environmental Officer.
Corrective Action If air quality complaints are received from adjacent residents, Contrast Constructions Pty Ltd will investigate those complaints and determine
whether further air quality monitoring is required;
If results from air quality monitoring indicate compliance with the standards mentioned in the Implementation Strategies section, releases
from the site are not considered a nuisance and no further action will be required;
Conversely, if results exceed the standards in the Implementation Strategies section, offensive sources must cease and corrective measures
taken until compliance can be achieved; and
If necessary, air quality control measures shall be reviewed in consultation with a qualified air quality consultant and upgraded if appropriate
to the satisfaction of the Site Manager and Sunshine Coast Regional Council.
1 101 14_PR20517_EMP.doc Page 41
Page 46
Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria Comply with the:
Environmental Protection Act 1994;
Schedule 1 of the Environmental Protection (Noise) Policy 2008; and
Sunshine Coast Regional Council (SCRC) by-laws.
n No receipt of legitimate complaints.
Implementation Strategies • Control all noise generating mobile and stationary plant and equipment in accordance with AS2436: 1981 Guide to Noise
Control on Construction, Maintenance and Demolition Sites;
n Control measures may include but are not limited to the following:
The fitting of effective residential grade exhaust silencers to all mobile plant;
The fitting of engine acoustic shielding;
Using exhaust silencers on compressed air exhausts;
The use of physical noise barriers such as earth mounds or mobile screens;
Review of times of operation of plant;
Vehicle speed limits; and
The use of specific pavement materials (which can reduce noise) for the construction of roads.
• All vehicles shall be operated and maintained in a manner which ensures that noise levels produced by the vehicles are
within the limits of the Commonwealth Department of Infrastructure, Transport, Regional Development and Local
Government Australian Design Rule ADR28 - External Noise of Motor Vehicles;
• All plant and machinery used during construction shall be maintained in a sound mechanical condition;
• Engines shall not be left idling needlessly; and
n Unless SCRC and the DERM permits otherwise, site working hours shall be as follows:
Monday - Saturday 6.30 am to 6:30 pm
Sunday and public holidays No work permitted
• Activities that may generate significant noise or vibration shall be scheduled between the hours of 8.30 am - 5.00pm on
weekdays (Mon - Fri) and between the hours of 8.30 am -1.00pm on Saturdays.
Monitoring n Daily site inspections by the Construction Foreman of the:
Types;
1101 14_PR20517_EMP.doc Page 42
Page 47
Environmental Management Plan
e r J
Peregian Beach Caravan Park
DESIGN / CONSTRUCTION PHASE - NOISE & VIBRATION
Locations; and
Details of control measures in place.
• Weekly inspections by the Construction Foreman of all noise generating sources (including inspection of new items before
they commence work on the site) to record details and compliance of sound control measures.
• If requested by Council in response to a complaint of nuisance, noise monitoring shall be undertaken by a suitably
qualified consultant; and
• Monthly audit and review of control measures implemented on site by the Environmental Officer.
Reporting / Responsibility Reporting
• Recording of all incidents, noise complaints received and details of all control measures undertaken in the Incidents and
Complaints Register (Section 2.5);
• Construction Foreman to report all complaints to the Site Manager who is to then inform Contrast Constructions Pty Ltd;
n All complaints received by Contrast Constructions Pty Ltd from the public or advised by Sunshine Coast Regional Council
shall be forwarded to the Site Manager and Construction Foreman to be entered on the Incidents and Complaints Register
for the project together with adopted remedial measures;
n Reporting of any noise monitoring to be undertaken by a suitably qualified consultant. A copy of the report shall be provided
to Council upon request;
• Monthly reports completed by the Construction Foreman of complaints received, including details of any monitoring
activities, control measures and corrective actions subsequently undertaken. This report will be available upon request from
responsible regulatory authorities;
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman.
Responsible Person
• Site Manager.
• The Construction Foreman.
• Suitably qualified air quality consultant.
• Environmental Officer.
n Investigate all activities producing excessive noise.
Corrective Action
n Where necessary, remedial action shall be undertaken by the Construction Foreman to the satisfaction the Site Manager
1101 14_PR20517_EMP.doc Page 43
Page 48
Environmental Management Plan
701-914
LLMAIL-A Peregian Beach Caravan Park
and Sunshine Coast Regional Council.
• Possible remedial action may include:
The activity responsible for the offending noise may be either re-scheduled for a more appropriate time,
operational practices modified or noise emissions attenuated via the use of temporary noise barriers.
In the case of machinery, the machinery may be inspected to identify any necessary repairs, which may have
contributed to an excessive noise release.
Development of further mitigation measures to achieve compliance.
Inspection by a qualified acoustic consultant
n In the event of a noise complaint:
Liaise with the complainant in an attempt to resolve the complaint e.g. reschedule/ replace noise offensive source
and implement remedial actions; and
If complaint cannot be resolved; monitor and identify mitigation measures in consultation with a suitably qualified
noise consultant (e.g. sound barriers) and Council.
1101 14_PR205I7_EMP.doc Page 44
Page 49
Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria To ensure wastes from the construction site are properly managed and do not pollute any waterways / wetlands;
No uncontrolled waste or litter to be observed on the construction site or access roads;
Wastes are properly disposed of without harm to the surrounding environment; and
Compliance with Environmental Protection (Waste Management) Policy 2000.
Implementation Strategies • Waste management practices on the site should adopt the waste management hierarchy and principles as prescribed in the
Environmental Protection (Waste Management) Policy 2000. Opportunities to avoid, reduce, reuse and recycle waste
materials are to be investigated;
n Provide industrial waste disposal bins for disposal of general inert construction wastes. Separate disposal bins clearly
marked are to be provided for recyclables;
n All wastes shall be securely stored and protected from rain and stormwater contact;
• Construction waste is to be regularly collected. Construction waste awaiting collection is to be appropriately contained on
site in a tidy manner and does not have the potential to be wind blown;
n Prohibit the discard of cigarette butts to ground. The Construction Foreman is to address the management of cigarette butts
on site and inform all contractors of the correct procedures;
n Washouts of concrete trucks shall not be permitted on site;
n Wheelbarrows and other mortar/concrete receptacles shall be cleaned out in bunded wash area for larger items and a
sealed wash drum system for small items. All waste materials shall be collected for disposal;
• Cleared native vegetation to be processed and transported off site to be reused for mulch, firewood, etc;
• Locate and manage construction storage areas so that there is no impact following completion of works;
• Only minor servicing of vehicles shall take place (e.g. replace burst hydraulic hoses). All other servicing shall be
undertaken off site;
• Store petroleum products in a secure, bunded compound. Refer to the Hazardous Substances Element (Section 3.3);
• Retain only minimal required quantities of chemicals, fuels, oils etc on site during construction at any particular time. These
products shall be stored within a bund (AS1940) with a suitable quantity of absorbent material (e.g. Enretech) available on
site in case of a spill. Refer to the Hazardous Substances Element (Section 3.3);
n All general construction waste shall be removed from the site and disposed of at a waste disposal facility licensed to
receive such wastes at the completion of construction works;
1101 14_PR20517_EMP.doc Page 4S
Page 50
Environmental Management Plan
Peregian Beach Caravan Park
All regulated waste shall be collected and transferred from site only by appropriately licensed contractors;
Ablution facilities / portable toilets to be used. Sewer waste shall be collected and transferred from site only by
appropriately licensed contractors;
n No burning or incinerating of waste is to occur on the site;
• Refer to additional implementation strategies in the Hazardous Materials element of this EMP (Section 3.3).
Monitoring • Daily inspection of the site, work areas and waste receptacles for litter containment;
n Visual surveys will be conducted on a weekly basis by the Construction Foreman to monitor waste management
performance: and
n Monthly audit and review of site conditions and control measures implemented on site by the Environmental Officer.
Reporting / Responsibility Reporting
n Weekly records of site inspection;
n Records of regulated waste disposal to be maintained by the Construction Foreman as well as other general waste receipts;
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman; and
n Copies of records and receipts are to be provided to Sunshine Coast Regional Council, if requested.
Responsibility
n The Construction Foreman.
n Environmental Officer.
Corrective Action • Immediately remove any waste that has left the boundaries of the site;
• Immediately cease any non-compliant waste management practices;
n Construction Foreman to instruct a site clean up, when required;
n The Site Manager reserves the right to request any works necessary to maintain compliance;
n Repair the waste receptacle/s as required; and
n Reinforce waste management education with all personnel.
1101 14_PR20S 17_EMP.doc Page 46
Page 51
Environmental Management Plan
Peregian Beach Caravan Park
al, =k-cl L-1 wil" 0:61 1, H
Performance Criteria No impact from construction activities on areas of cultural heritage significance as protected by the Aboriginal Cultural
Heritage Act 2003;
Prevention of any harm to cultural heritage values that may exist at the site by exercising a 'Cultural Heritage Duty of Care';
and
Adequate protection and preservation any items of cultural heritage value that may exist at the site.
Implementation Strategies In the event of an archaeological or historic site being discovered, all construction activities shall cease in the vicinity of the
find and the area shall be fenced off until appropriate measures are taken, under the direction of the Cultural Heritage unit
of DERM;
The findings of any aboriginal cultural heritage material must be reported within 24 hours to the Cultural Heritage Unit of
DERM;
If the find is deemed significant by the relevant authority or party, a suitable strategy shall be developed and agreed to by
all parties to best manage and avoid harm to any cultural heritage values;
Work shall not resume in the isolated area until authorised to do so in writing by the DERM.
Monitoring Daily general inspection of the site, work areas and practices.
Reporting / Responsibility Reporting
• In the event of an archaeological or historic site, item or place being discovered, the find shall be immediately reported to
Site Manager, Contrast Constructions Pty Ltd and DERM (Cultural Heritage) (07) 3406 2274.
Responsibility
• The Site Manager.
n Contrast Constructions Pty Ltd
Corrective Action Corrective action will be determined within the legal requirements of Aboriginal Cultural Heritage Act 2003 and in
consultation with DERM and relevant local Aboriginal communities;
Any actions requested by the DERM (Cultural Heritage); and
Additional staff training to ensure they are capable of identifying cultural sites, artefacts or remains.
110114_PR20517_EMP.doc Page 47
Page 52
Environmental Management Plan
FBI-Wiwi
Peregian Beach Caravan Park
Performance Criteria No adverse visual amenity impacts from the temporary construction works.
Implementation Strategies Maintain vegetation where possible to provide visual screening of the construction site;
Temporary screening will be used to alleviate visual intrusion, where necessary;
The construction site shall be kept free of litter and tidy at all times;
Site induction will communicate the requirement for a tidy site, and consideration for local residents; and
Lighting will not be directed into neighbouring residences.
Monitoring Daily monitoring of the construction site condition by the Construction Foreman.
Monthly audit and review of site conditions and control measures implemented on site by the Environmental Officer.
Reporting / Responsibility Reporting
• All complaints are to be recorded on the site Incidents and Complaints Register (Section 2.5);
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman.
Responsibility
n Construction Foreman
n Environmental Officer
Corrective Action Provide additional screening as required; and
n Clean up rubbish and stockpiles as required.
1101 14_PR20517_EMP.doc Page 48
Page 53
Environmental Management Plan
Peregian Beach Caravan Park
4.0 Operational Phase Management Plans
OPERATIONAL PHASE - SURFACE & GROUND WATER QUALITY
This element to be read in conjunction with the Stormwater Management Plan & Sediment/Erosion Control Plan (Simmonds & Bristow, 2010) (Appendix A). Relevant
information has been extracted from this document for inclusion in this element of the EMP.
Performance Criteria • No deterioration in water quality in adjacent waters;
• Long-term median stormwater quality objectives as recommended in the Stormwater Management Plan / Sediment and Erosion Control Plan
(Simmonds & Bristow, 2010) (Appendix A):
Suspended solids <15 mg/L:
Total phosphors <35 ug/L;
Total nitrogen <350 ug/L; and
pH 5.0 - 7.0.
Maintaining 3m3 rainwater tank volume associated with each beach shack
n Water quality parameters should conform to the ANZECC 2000 guidelines for primary contact (to be used for laundry, toilet use and
irrigation) as outlined below:
Microbial: the median bacterial count should not exceed 150 faecal coliform organisms/100mL or 35 enterococci organisms/100mL.
Pathogenic free-living protozoans should be absent;
Nuisance organisms: Phytoplankton scums, filamentous algal mats, fungus, leeches should not be present. Direct contact activities
should be discouraged if algal levels of 15 000 - 20 000 cells/mL are present, depending on the algal species. Large numbers of
midges and aquatic worms should also be avoided.
pH: 5.0 - 9.0;
Toxic chemicals: Waters containing chemicals that are either toxic or irritating to the skin or mucous membranes are unsuitable. Toxic
substances should not exceed values in tables 5.2.3 and 5.2.4 in the ANZECC 2000 guidelines; and
Surface films, oil and petrochemicals: should not be noticeable as a visible film on the water nor should they be detectable by odour.
Maintaining underground rainwater tanks associated with the ornamental garden Irrigation scheme
n Water quality parameters should conform to the ANZECC 2000 guidelines for secondary contact (to be used for irrigation) as outlined below:
- Microbial: Median bacterial count should
............. not
... exceed
. 1000 faecal coliform organisms/100mL or 230 enterococci organisms/100mL.
1101 14-PR20517-EMP.doc Page 49
Page 54
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - SURFACE & GROUND WATER QUALITY
Pathogenic free-living protozoans should be absent.
Nuisance organisms: Phytoplankton scums, filamentous algal mats, fungus, leeches should not be present. Direct contact activities
should be discouraged if algal levels of 15 000 - 20 000 cells/mL are present, depending on the algal species. Large numbers of
midges and aquatic worms should also be avoided.
pH: 5.0 - 9.0;
Toxic chemicals: Waters containing chemicals that are either toxic or irritating to the skin or mucous membranes are unsuitable. Toxic
substances should not exceed values in tables 5.2.3 and 5.2.4 in the ANZECC 2000 guidelines; and
n Surface films, oil and petrochemicals should not be noticeable as a visible film on the water nor should they be detectable by odour.
Maintaining the vegetated buffer zones
No bare patches;
Minimal entry of grass clippings and plant detritus into the bioretention trenches;
Maintaining bloretention trenches
Bioretention trench and outlet weir grate are free of litter;
Bioretention trench is free of silt drapes or disturbances that could affect water infiltration into the trench substrate;
Bioretention trench has healthy growth of the required plant species and is free of weeds;
Maintaining Pipe Infrastructure
Evidence of flow along pipework:
No evidence of leaking pipework
Maintaining the constructed wetland system
Absence of litter;
Low, manageable presence of weeds;
Water quality conforming to the listed objectives above.
Implementation Strategies Install all stormwater management devices as outlined in the Stormwater Management Plan (Appendix A);
n The On-Site Manager / Owner shall implement strategies recommended in the Stormwater Management Plan (Appendix A), including:
Vegetated buffer zones are to be maintained by weed removal, mowing of lawns and pruning of gardens, with offsite disposal or
composting of lawn and garden clippings. Composting area to be isolated from stormwater runoff to underground storage tanks;
Avoid leaching of fertiliser nutrients from vegetated buffer zones into stormwater. This may require managing soil pH to manage
---........ .... nutrient availability
.........to plants;
. .
1101 14_PR20517_EMP.doc Page 50
Page 55
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - SURFACE & GROUND WATER QUALITY
- Brush-cut grass within the Bio-retention Trenches to maintain length;
Monitoring n Monitoring recommended in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Monthly water quality monitoring of rainwater tanks associated with each beach shack (microbial, nuisance organisms, pH, toxic
chemicals, surface films);
Monthly water quality monitoring of underground rainwater tanks (microbial, nuisance organisms, aesthetics, clarity and colour, toxic
chemicals and debris);
Monthly inspections of garden surfaces and vegetated buffers for bare patches;
Monthly inspections of the bioretention trenches for disturbances to trench floor, and the accumulated debris, litter and silt drapes;
Monthly inspections of the high flow outlet weir grate in bioretention trenches for blockages or detritus build-up;
Monthly inspections of the bioretention trenches for vegetation cover and weeds;
Maintaining pipe infrastructure
Inspect flows entering and exiting pipe-work during flow events;
Daily inspection for evidence of leaking pipe-work;
Maintaining the constructed wetland system
Monthly inspections of the wetland system for accumulated debris and litter and weeds;
Monthly water quality monitoring (total suspended solids, total phosphorus, total nitrogen, pH);
Twice yearly soil pH testing of gardens and vegetated buffers;
Reporting / Responsibility Reporting
• Annual reporting of the rainwater systems water quality performance.
• Monthly reporting of garden and vegetation buffer maintenance sites where permanent cover is difficult to maintain to the On-Site Manager /
Owner;
Maintaining bioretention trenches
Report accumulation of sediment and coarse particulates to the Site Manager (and senior management if necessary);
Report the need to restore vegetation or remove weeds to the Site Manager (and senior management if necessary);
Maintaining pipe infrastructure
- Plumbing subcontractor to report causes of blockages or leaks to the Site Manager;
Maintaining the constructed wetland system
- Report accumulation of litter and the need to restore vegetation or remove weeds to senior management if necessary;
1101 14_PR20517_EMP.doc Page 51
Page 56
Environmental Management Plan
Peregian Beach Caravan Park
- Report results of water quality testing against the water quality targets annually to senior management:
Responsibility
Landscape contractor and On-Site Manager/Owner (buffers, bioretention trenches);
Plumbing subcontractor and Site Manager (pipe infrastructure); and
Suitably qualified environmental consultant (all water quality & soil monitoring activities).
Corrective Action Maintaining the vegetated buffer zones
n When loss of control of the landscape irrigation system and vegetation buffer occurs:
Follow contingency plan as outlined for EP-SMP-03 in the Stormwater Management Plan / Sediment and Erosion Control Plan;
Site Manager to reinforce the need for off site disposal of composting;
Site manager to reinforce the need to avoid leaching of fertiliser nutrients into stormwater;
Maintaining bioretention trenches
n When loss of control of stormwater flow through the bioretention trench occurs:
Follow contingency plan as outlined for EP-SMP-05;
Remove litter, accumulated sediment, silt drapes (by rake and spade) from trench;
Remove detritus from outlet weir grate;
Restore vegetation if required by transplanting bare patches;
Remove weeds manually;
Maintaining pipe Infrastructure
• When loss of control of stormwater flow through the pipes occurs:
Follow contingency plan as outlined for EP-SMP-06;
Remove visible blockages to inflow pipes after flows have ceased:
Call plumbing subcontractor to inspect pipes for blockages and leaks as required;
Maintaining the constructed wetland system
n When poor quality water flows through the gabion wall:
Follow contingency plan as outlined for EP-SMP-07;
Manually remove accumulated litter and weeds;
Restore locally native plant species if required;
Identify upstream controls causing poor water quality and initiate improvements; and
1 101 I4_PR20517_EMP.doc Page 52
Page 57
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - SURFACE & GROUND WATER QUALITY
Maintaining 3m3 rainwater tank volume associated with each beach shack
• When loss of control of the rainwater tank and roof guttering system occurs:
Follow contingency plan as outlined for EP-SMP-01:
Empty and clean, repair or replace the rainwater tank if required;
Maintaining underground rainwater tanks associated with the ornamental garden Irrigation scheme
• When loss of control of the underground rainwater storage tank occurs:
Follow contingency plan as outlined for EP-SMP-02; and
Empty and clean, repair or replace the rainwater tank if required.
1 101 I4-PR20517_EMP.doc Page 53
Page 58
Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria • Efficient use of water by the proposed development;
n Performance criteria recommended in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Maintaining 3m3 rainwater tank volume associated with each beach shack
Costs of maintaining the rainwater capture system are kept to a minimum;
Water quality parameters should conform to the ANZECC 2000 guidelines for primary contact, as outlined in the Surface and Ground
Water Quality Element. Section 4.1;
Maintaining underground rainwater tanks associated with the ornamental garden Irrigation scheme
Costs of maintaining the rainwater capture system are kept to a minimum;
Water quality parameters should conform to the ANZECC 2000 guidelines for secondary contact, as outlined in the Surface and
Ground Water Quality Element, Section 4.1; and
Irrigating the ornamental gardens
- Routine delivery of harvested rainwater onto the gardens.
Implementation Strategies • The irrigation system design shall utilise drip irrigation systems or other water efficient techniques;
• All new kitchen, laundry and bathroom fittings shall comply with the AAA Water Conservation Ratings System as defined by the AS/NZS
6400 (Water Efficient Products - Rating and Labelling 2003) and AS/NZS 3500 (National Plumbing and Drainage Standard Part 1.2), or
current equivalent standards as may apply, with toilets to comply with the AAA Water Conservation Rating System. All new tapware and
shower roses shall not exceed a maximum flow of 9 Umin. Dishwashers and washing machines are excluded from this requirement (as
outlined in DA Condition 27);
• Implementation strategies recommended in the Stormwater Management Plan I Sediment and Erosion Control Plan (Appendix A), including:
Maintaining 3m3 rainwater tank volume associated with each beach shack
Carry out routine checks on structural integrity of rainwater tanks;
Carry out routine checks on water quality (as outlined in Section 4.1).
Maintaining underground rainwater tanks associated with the ornamental garden irrigation scheme
Carry out routine checks on structural integrity of rainwater tanks;
Carry out routine checks on water quality (as outlined in Section 4.1): and
Irrigating the ornamental gardens
- Install an irrigation system with programmable logic that reliably delivers harvested rainwater onto the grounds:
1101 14_PR20517_EMP.doc Page 54
Page 59
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - WATER CONSERVATION
Ensure that the programmable logic delivers 2 - 5 mm/day onto the gardens; and
Advertise that water used for irrigation is harvested and not from the mains supply.
Monitoring n Monitoring recommended in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Maintaining 3m3 rainwater tank volume associated with each beach shack
Annual inspection of the structural integrity of tanks (e.g. leaves and detritus, cracks, rust, leaks in guttering, roof, down-pipe and
tank; check the mesh on the rainwater tank is intact and free of detritus);
Monthly water quality monitoring(as outlined in Section 4.1);
Maintaining underground rainwater tanks associated with the ornamental garden irrigation scheme
Daily inspection of the contributing catchment condition (hard surfaces used for collecting rainwater for pollutants such as oil or petrol
spills, dirt, litter);
Monthly inspection of the screen for litter and structural integrity;
Annual inspection of the structural integrity of the tanks (cracks, cement rot, leaks, check inside the tanks for accumulated sediment
and nuisance biota); and
Monthly water quality monitoring (microbial, nuisance organisms, aesthetics, clarity and colour, toxic chemicals, oils and debris, as
outlined in Section 4.1).
Irrigating the ornamental gardens
Weekly inspection to ensure the 100m3 tanks do not overflow; and
Monitoring of pipe infrastructure (daily inspection for evidence of leaking pipe-work; inspection of flow along pipe-work (entry and exit
of water along pipework) during stormwater flow events).
Reporting / Responsibility Reporting
• Annual reporting of the rainwater systems and water quality performance (as outlined in Section 4.1), and exception reporting of failure and
replacement, supplied to senior management;
Responsibility
• Site Manager; and
n Site Manager and plumbing subcontractor (underground rainwater tanks).
Corrective Action Maintaining 3m3 rainwater tank volume associated with each beach shack
n Correct structural integrity as required (e.g. clean out or repair guttering and downpipe, clean, repair or replace first flush diverter and mesh
on rainwater tank if required);
1 101 14_PR20S 17_EMP.doc Page 55
Page 60
Environmental Management Plan
Peregian Beach Caravan Park
• Empty and clean, repair or replace the rainwater tank if required (as outlined in Section 4.1);
Maintaining underground rainwater tanks associated with the ornamental garden irrigation scheme
• Clean contributing catchment area of oil spills, litter, sediment accumulation if required;
n Clean screen of accumulated detritus if required;
n Empty and clean, repair or replace the rainwater tank if required (as outlined in Section 4.1); and
Irrigating the ornamental gardens
• Repair and/or reprogram the programmable logic controller; and
• Repair the structure of the pipework as required.
1101 14_PR20S 17_EMP.doc Page 56
Page 61
Environmental Management Plan
B 0 r
Peregian Beach Caravan Park
OPERATIONAL PHASE - VEGETATION PROTECTION
This element to be read in conjunction with the Ecological Restoration Plan (RPS, 2010) (Appendix B). Relevant information has been extracted from these documents for
inclusion in this element of the EMP. This element is also related to the Weed Control, Bushfire Management and Fauna Elements, which also should be read / considered
when implementing this Element.
Performance Criteria Rehabilitation completed in accordance with the Ecological Restoration Plan (Appendix B) and the Landscape Plan to be
prepared for the site;
No destruction of retained vegetation within the designated parkland area;
Performance criteria listed in the Ecological Restoration Plan (Appendix B) including:
Rehabilitation zones 1 and 2 revegetated;
No weed species in rehabilitation zones;
Fencing intact;
After the completion of 1 year of maintenance the following should be achieved:
Mulched cover maintained around planted species;
All mortalities replaced;
No to minimal weeds;
Wildling recruitment evident in rehabilitation zone 1; and
All planted species showing evidence of health and vigour (i.e. new growth) and appear well established.
n Carry out rehabilitation in accordance with the Ecological Restoration Plan (Appendix B) including:
Implementation Strategies
Revegetation in rehabilitation zones 1 and 2 is to commence as soon as the construction phase has been
completed;
Rehabilitation zone 1 (landscape, fire trail and stormwater area) is to be revegetated with prescribed species and
densities for RE12.2.7 (listed in Appendix A of the Ecological Restoration Plan; Appendix B of this EMP);
Planting with prescribed species and densities for RE12.2.12 & RE12.2.15 (listed in Appendix A of the Ecological
Restoration Plan; Appendix B of this EMP) is to occur within spot treatment areas in rehabilitation zone 2;
Revegetation works to be undertaken in accordance with the methods prescribed in the Ecological Restoration Plan;
Signage is to be erected to demarcate the rehabilitation zones;
n Suitable fencing (e.g. fauna-friendly fencing) will be established around rehabilitation areas to prevent degradation through
1101 14_PR20517_EMP.doc Page 57
Page 62
Environmental Management Plan
Rr J
Peregian Beach Caravan Park
OPERATIONAL PHASE - VEGETATION PROTECTION
uncontrolled access during the maintenance period;
• Undertake maintenance of rehabilitation areas as outlined in the Ecological Restoration Plan (Appendix B), including weed
control, replacement of mortalities, mulching and watering;
n Herbicides should only be applied in accordance with the Ecological Restoration Plan. No herbicides are to be applied to
native vegetation;
n The parkland area will be demarcated and clearly identified as a'Vegetation Protection Area';
n Remove rubbish which enters the retained vegetation and parkland area;
• Regular weed control is to be conducted across the site to ensure weeds do not establish to levels that can threaten native
vegetation (refer to Weed and Pest Control Element, Section 4.4);
• The Site Arborist is to liaise with the landscape contractor so as to minimise any disturbance to retained trees on site during
landscaping works; and
n Planting of appropriate native and locally significant plant species within landscaping areas.
Monitoring • Monitoring by a suitably qualified restoration ecologist should be undertaken at the completion of revegetation works, then
every three months for the 12 months post rehabilitation. Amendments to the monitoring schedule may be required if
changes to rehabilitation works/progress occurs.
• Monitoring by a suitably qualified restoration ecologist is to consist of the following:
Weed control (extent and adequacy as well as any secondary weed responses to treatments);
Presence of specific environmental weeds;
Indicators of growth and survival of all plantings;
Adequacy of site preparation, mulching, tree (and plant) protection and maintenance; and
Adequacy of flow of information from ecological and project monitoring back to the Construction Foreman, and
subsequent response and integration of any modifications.
n The rehabilitation contractor is to carry out monitoring and maintenance in accordance with the Maintenance Schedule
outlined in the Ecological Restoration Plan, including:
Weekly for 2 months following completion of revegetation: monitor seedling health, check for disturbances from
pests (e.g. rabbits, vandals), check erosion and sediment controls are in place and in working order, and water as
necessary;
Monthly for the first 6 months: monitor plant health, check for disturbances from pests, check for
1 101 14_PR20517_EMP.doc Page 58
Page 63
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - VEGETATION PROTECTION
erosion/sedimentation, monitor weeds, and watering as necessary;
Quarterly: check mulch, monitor weeds, check for erosion/sedimentation, and monitor regeneration success;
12 months: monitor plant health, check for disturbances from pests, and monitor weeds.
n A qualified site arborist shall monitor the health and structural integrity of the retained trees to be retained on a quarterly
basis for 12 months post construction.
Reporting / Responsibility Reporting
• A brief report should accompany each rehabilitation monitoring period and should summarise the findings of monitoring
events and identify the performance of rehabilitation works with reference to the objectives of this plan and performance
criteria identified in the Ecological Restoration Plan (Appendix B). Recommendations for improvement should be provided
where appropriate; and
n Quarterly reporting by the site arborist of the results and the monitoring and any recommendations;
• Records of planting lists and schedule maintenance works are to be maintained by the rehabilitation contractor.
Responsibility
n Restoration Ecologist.
• Site Arborist.
n Rehabilitation Contractor.
n Where mortalities of planted stock occur, they will be replaced with similar species consistent with the planting prescriptions
Corrective Action
within two months (or at suitable planting periods);
n Replace plant guards;
n Re-instate damaged sediment fencing;
n Water daily if rainfall has not been sufficient;
n Replenish mulch if necessary; and
n Undertake any additional remedial measures recommended by the restoration ecologist and site arborist.
1101 14 PR20517 EMP.doc Page 59
Page 64
Environmental Management Plan
Peregian Beach Caravan Park
n • I 1
n i1'•-
Performance Criteria No (negligible) weed species in parkland area and across the site;
Weed species are to be controlled across the site, with no incidences of noxious and declared weeds to be recorded; and
No impacts of introduced fauna on native fauna.
Implementation Strategies Carry out weed control in accordance with the Ecological Restoration Plan (Appendix B);
Regular weed control is to be conducted across the site to ensure weeds do not establish to levels that can threaten native
vegetation. Weed removal is to form part of the post construction maintenance works on the site;
Weed control will be conducted by hand or mechanical means where possible. Mechanical control methods include:
Manual removal by hand or grubbing by using toppers, hatchets or small saws to remove the weed including the
roots;
Lopping where the weed is removed by an axe or chainsaw;
Mowing or brush-cutting to remove the seed heads of the weed; and
Ringbarking, which involves removing the sapwood around the entire girth of the trunk near the base of the plant.
• Where chemical methods (preferably cut and paint) are required, chemicals will be kept away from sensitive areas:
• Any herbicides will be used in accordance with manufacturers' and DERM's guidelines;
• Herbicides used on the site will be only those designed for use near waterways and frog-friendly (e.g. Roundup Bioactive
TM Herbicide or Weedmaster Herbicide):
• Herbicide is to be directly applied to weeds and broad-scale spraying is not permitted;
• A chemical register and Material Safety Data Sheets shall be kept on site for any herbicides and pesticides used;
n Cleared weed material shall be placed in a disposable bag, sealed and disposed of offsite or placed in a Council-approved
facility. Burning of cleared exotic vegetation is not a permitted disposal technique;
• Planting of appropriate native plant species within landscaping, buffer and conservation areas;
n Declared weeds as defined by the Land Protection (Pest and Stock Route Management) Act 2002 as well as noxious
weeds are not to be planted on site;
• All nursery stock for landscaping works shall be weed, pest and disease free and certified as such by the supplier where
feasible. The certificates are to be obtained prior to the commencement of any landscaping works on site and shall be made
available to Council upon request;
n All mulch produced on site shall specifically exclude material from weed species; and
1 101 14_PR20517_EMP.doc Page 60
Page 65
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - WEED & PEST CONTROL
To minimise potential impacts on native fauna, domestic animals shall not be allowed on the site at any time.
Monitoring Monitoring by a suitably qualified restoration ecologist should be undertaken at the completion of revegetation works, then
every three months for the 12 months post rehabilitation. Amendments to the monitoring schedule may be required if
changes to rehabilitation works/progress occurs.
The rehabilitation contractor is to carry out monitoring and maintenance in accordance with the Maintenance Schedule
outlined in the Ecological Restoration Plan.
Reporting / Responsibility Reporting
• A brief report should accompany each rehabilitation monitoring period and should summarise the findings of monitoring
events and identify the performance of rehabilitation works with reference to the objectives of this plan and performance
criteria identified in the Ecological Restoration Plan (Appendix B). Recommendations for improvement should be provided
where appropriate; and
n Records of schedule maintenance works are to be maintained by the rehabilitation contractor.
Responsibility
• Restoration Ecologist.
n Rehabilitation Contractor.
n Site Grounds Keeper.
n Treat declared weed species and manage spread of other weeds; and
Corrective Action
n Appropriate feral animal control implemented following any incidences.
1 101 14_PR20517_EMP.doc Page 61
Page 66
Environmental Management Plan
Peregian Beach Caravan Park
Performance Criteria Correct access for Queensland Fire and Rescue Service (QFRS) to all parts of the site at all times;
Firebreaks and fire protection zones are established; and
Fuel loads in parkland areas are maintained at acceptable levels.
Implementation Strategies Implement the measures outlined below in accordance with the Fire Management Plan (Natural Solutions, 2007; Appendix
E):
Bushfire setbacks / firebreaks will be established between the retained parkland and the caravan park. A 20m
setback will be retained between flammable structures within the development and the retained (dry heath)
vegetation. This should incorporate a 6m fire access constructed of stable material and which has access points at
either end or sufficient turning capacity for a fire fighting vehicle at the terminating end. The fire trail must be
accessible from the development's internal road network and is to be maintained at all times so it is clearly
accessible by emergency services for bushfire management and firefighting purposes;
Weed management and revegetation using fire tolerant / retardant species in the wet heath buffer;
Fire hydrants to be placed between buildings along the western edge of the development (nominally 3-4);
All buildings adjacent to the buffer to have roof sprinkler system installed;
All building materials to be of highest Australian Standards for fireproof materials and construction (particularly those
near the buffer vegetation);
Leaf guards to be installed in all gutters; and
Planting of fire 'barrier' species along the edge (interface) of the buffer and between buildings (e.g. Macaranga,
Macaranga tanarius);
n All firebreaks, fire protection zones/setbacks and emergency access points will be appropriately maintained;
n Assessment and monitoring of fuel loads on the site will be undertaken by appropriately qualified personnel;
• If necessary, removal of excess fuel loads (via manual removal or prescribed burn) will be undertaken in accordance with
recommendations from appropriately qualified personnel (i.e. site ecologist and bushfire expert);
n No burning of waste or open fires allowed on site;
• No storage or dumping of waste or combustible material in protected areas or within 20m of these areas;
• Adequate and accessible water supplies will be on-hand for firefighting purposes:
n Replacement landscape planting near the retained vegetation to consist only of fire retardant species;
1 101 14_PR20517_EMP.doc Page 62
Page 67
Environmental Management Plan
Peregian Beach Caravan Park
Carry out the prevention measures recommended in the Queensland Government 'Are you Bushfire Prepared?' publication
including:
Clear space around buildings;
Clear and remove undergrowth;
Fill any gaps in the eaves, around windows, and door frames;
Protect larger under-deck areas with non-flammable screens;
Remove any fire hazards from around the house;
Rake up bark, leaves and twigs;
Ensure appropriate water and firefighting equipment is available; and
Ensure the area has cleared access for fire trucks.
Monitoring • Assessment and monitoring of fuel loads in retained vegetation will be undertaken by appropriately qualified personnel.
Reporting / Responsibility Reporting
n Monthly reporting of:
all monitoring;
control measures; and
corrective action undertaken.
n Copies of the report to be provided to Sunshine Coast Regional Council if requested.
Responsible Person
• Contrast Constructions Pty Ltd
Corrective Action • If control measures are not consistent with Sunshine Coast Regional Council's or Queensland Government guidelines,
necessary (and reasonable) changes shall be made as required to comply with the guidelines; and
• Consultation will be undertaken with an appropriately qualified professional and agreement reached in relation to
appropriate corrective and preventative actions to be taken.
1 101 14_PR20517_EMP.doc Page 63
Page 68
Environmental Management Plan
UO Peregian Beach Caravan Park
Performance Criteria No injury of protected fauna;
No destruction of fauna habitat within the designated green space areas;
n Fencing intact; and
• Minimise impacts on native fauna from the operational activities on the site through implementing environmental controls.
Implementation Strategies • No domestic animals to be allowed in the caravan park;
• Installation and maintenance of appropriate fencing (i.e. either fauna-friendly (e.g. by leaving at least a 30cm gap under the fence, and using
materials such as timber post-and-rail or chain wire that can be climbed) or fauna-exclusion) around retained fauna habitat (e.g. parkland);
• Fauna-friendly fencing should be implemented where possible along the boundaries of the subject site (i.e. areas additional to the 1m high
gabion basket fence) (in accordance with the Koala Management Plan; James Warren & Associates, 2010, Appendix D);
n To minimise the potential impact of David Low Way and minor roads to be constructed on the subject site, low traffic speeds will be
implemented on the site (in accordance with the Koala Management Plan, James Warren & Associates, 2010, Appendix D);
• Speed limits shall be displayed clearly and strictly adhered to;
n Signage will be installed to warn residents of the potential for fauna injury within the development;
n Feeding of native fauna is to be prohibited and appropriate signage erected;
n Lighting is to be designed to minimise light spillage into conservation areas;
• Landscape works will include Koala habitat trees (in accordance with the Koala Habitat Management Plan; James Warren & Associates,
2010; Appendix D, and the Landscape Plan);
• Preferred Koala habitat tree species to be used in landscaping include Tallowwood (Eucalyptus microcorys), Swamp Mahogany (Eucalyptus
robusta), Queensland Blue Gum (Eucalyptus tereticornis), Swamp Box (Lophostemon suaveolens) and Broad-leaved Paperbark (Melaleuca
quinquenervia) (in accordance with the Koala Habitat Management Plan; James Warren & Associates, 2010; Appendix D); and
n The proposed pool shall be designed with a shallow lagoon-style entry where the pool water is level with part of the surrounding pavement.
The proposed pool design is considered to comply with the Queensland Government's Koala Safety Fencing and Measures Guideline
(December 2009) (James Warren & Associates; Appendix D).
n Planting of appropriate native plant species to provide fauna habitat and food resources within landscaping;
Monitoring n Rehabilitation areas will be inspected by a Restoration Ecologist during the maintenance period to ensure that habitat areas have not been
damaged. Refer to the Vegetation Protection Element (Section 4.3); and
• Monitoring of the conservation areas by Sunshine Coast Regional Council after the maintenance period for at least two years.
1101 14_PR20517_EMP.doc Page 64
Page 69
Environmental Management Plan
up, Peregian Beach Caravan Park
OPERATIONAL PHASE - FAUNA PROTECTION
Reporting / Responsibility Reporting
n Any injured fauna on the site immediately reported to DERM (QPWS) (1300 130 372).
Responsible Person
• Contrast Constructions Pty Ltd
n Corrective works for any damaged fauna habitat: and
Corrective Action
• Reinstate fencing, where required.
1 101 14_PR20517_EMP.doc Page 65
Page 70
Environmental Management Plan
I L111elow,r Peregian Beach Caravan Park
^• ' • a. : 7 __i t ill
Performance Criteria n To ensure wastes from the development are properly managed and do not pollute any waterbodies or natural areas;
n To ensure that a complaint for the same reason/s does not occur again; and
n Compliance with Environmental Protection (Waste Management) Policy 2000.
n Sealed waste collection bins distributed at strategic locations throughout the site for employees or persons visiting the site to dispose litter;
Implementation Strategies
• Litter collection bins shall be clearly identified as "general waste" and "recyclables";
• Ensure all waste bins are emptied on a regular basis, so that bins have sufficient capacity to contain all waste produced and unreasonable
odours should not be generated;
• Disposal of litter onsite is designed to reduce the possibility of gross pollutants entering adjacent natural areas;
• The commercial bin enclosure / bin wash down area within the Commercial Basement shall be bunded and include falls in the floor slab to a
gully pit that is connected to trade waste. This room shall include 3 refuse bins and 2 recycle bins (Plan WD 2001; Matrix Projects, 2010);
n Within Building A and Building B basements, two separate bin enclosure rooms will be included. Both rooms will have 2 refuse waste bins
and 1 recycle bin. One will service half the beach shacks, while the other will house the bins servicing the apartments within Building A (Plan
WD 3001; Matrix Projects, 2010);
• Within Buildings A and B, on apartment floors (levels 1 and 2), there is a room containing a rubbish chute and a room containing two co-mix
bins that will be decanted daily into the recycle bins by management. Guests staying within Buildings A or B within the resort will empty their
general waste into the rubbish chute (refer to Plan WD 3002 and WD 3003; Matrix Projects, 2010); and
• As required (i.e. weekly or more or less regular), the 1100m3 bins will be emptied by waste removal contractors.
Monitoring • Regular visual inspection of the site to ensure Performance Objectives/Indicators are being met.
Reporting / Responsibility Reporting
• Contrast Constructions Pty Ltd shall maintain records of all complaints received.
Responsibility
n Contrast Constructions Pty Ltd (or designated responsible person).
Corrective Action • Clean up works as required;
• Repair the waste receptacle/s as required; and
• If any complaints are received, the operator will liaise with the Sunshine Coast Regional Council to determine appropriate corrective and
preventative actions to be taken.
1101 14_PR20517_EMP.doc Page 66
Page 71
Environmental Management Plan
1 1• Peregian Beach Caravan Park
5.0 References
James Warren & Associates Pty Ltd (2010) Koala Habitat Management Plan. Lots 8 - 10 on P9315 & Lot 76
on MCH2969; 215-219 David Low Way, Peregian Beach. A report to Matrix Projects (Old) Pty Ltd,
June 2010.
Leaf & Limb Horticultural Consultancy (2010) Arborist Report for Essence of Peregian, Peregian Beach.
Prepared for Matrix Projects. June 2010.
Natural Solutions (2007) Fire Management Plan for 'Essence of Peregian' - 215-219 David Low Way,
Peregian Beach. Prepared for Scanlon Property Group. November 2007.
Simmonds & Bristow (2010) Essence of Peregian - Stormwater Management Plan, Sediment and Erosion
Control Plan. Prepared for Scanlon Property Group Pty Ltd. December, 2010.
1 101 14_PR20517_EMP doc Page 67
Page 72
Appendix A Stormwater Management Plan / Sediment and Erosion Control Plan Insert Document Title Page A
Page 73
S uiimonds & Bristow
63 Established 1965 Pty LtdACN 010 252 418
ESSENCE OF PEREGIAN
Stormwater Management Plan
Sediment and Erosion Control Plan - Stage 1
Prepared for
Contrast Construction Pty Ltd
September 2011
Page 74
I
I
Document Control
I
• Simmonds & Bristow
Fstabli;tied 1965 ACNoilo: ",: . 118 Pty Ltd
I
Originating Office:
40 Reginald Street PO Box 3160 Ph: 07 3710 9100
I
Rocklea. Qld 4106 Yeronga, QId 4104 Fax: 07 3710 9199
Job Ref Number J-1108-155c
Document Number J-1108-155c-01
Client Contrast Constructions
Client Contact Bradley Durkin
Name Signed Date I
I
Graeme Esslemont BSc
Written by: (geology) PhD (marine chemistry) 06/07/2011
Terrence Allen BE(Chem) - :.
07/07/2011
David Bristow BE(Chem), IEAust,
Reviewed by: CPENG, RPEQ, FAIM.
( off
- '' _
Revision Histo
Rev No. Date Author Pa e s Descri lion / Revision Status
01 07/09/2011 TA & GE Sta e 1 Update to SCEP Draft
Disclaimer
The information contained in this document has been prepared specifically for our client named above
and as such its use is limited to the above project. Simmonds and Bristow accept no responsibility to any
third party who may use or rely upon this document or the information contained within.
Whilst S&B have made every effort to ensure the accuracy of the information contained within this
document it may include typographical errors and may be changed or updated without notice.
©2010 Simmonds and Bristow Pty Ltd All Rights Reserved. Copyright in the whole and part of this document
belongs to Simmonds and Bristow Pty Ltd and may not be used, sold, transferred, copied or reproduced in whole or
in part without the prior written consent of Simmonds and Bristow Pty Ltd.
©2010 Simmonds & Bristow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Lid J•1109-155 - 8 September 2011
L'CLIENTFILESContrast Constnwi onstt 109 155c - Essence of Peregian SCEP Stage 1 Update'49_Oufput DocumentsV-1109-155c_SMP_Scanlon
Property Group_SECP_ye,ta_ I t0905.doc
Page 75
EXECUTIVE SUMMARY Simmonds and Bristow were commissioned by Contrast Construction Pty Ltd (for the Scanlon Property Group Pty Ltd) to develop a Stormwater Management Plan (SWP) and Sediment Erosion Control Plan (SECP) for the proposed Essence of Peregian development. There are two previous versions of this plan, which represent the original plan (2009) and a modified plan for the operational works application (2010). Subsequent to these plans it has been decided that this development will be developed in stages. This revision represents Stage 1 of the development, which will include the construction of the commercial and hotel precincts (with the residential units being built at a later date). As such the SECP and SWP presented in this document are a reduced version of the existing plan to accommodate the reduced scope of the Stage 1 development. In all other respects, the SECP and SWP presented in the earlier versions (November 2009, December 2010) are the same. The SWP for the Stage 1 development describes the management of stormwater from the commercial area, the hotel, the upslope sources beyond the development area, and from stockpiled soil stored on the Stage 2 area. This SWP provides computer model outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with the required guideline standards. These standards were agreed at the Joint Experts Conference, and are consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM 2009). Plans that describe the stormwater treatment train (Appendix A) and outputs from computer modelling used to support the stormwater design (Appendix B) are appended. These plans show the proposed site layout, the location of bioretention trenches, wetlands, building areas, plumbing layout, and the structure of bioretention trenches and wetlands within the development area. Procedures for maintaining stormwater treatment units (Appendix D) and implementing the Sediment and Erosion Control Plan are attached as Appendix C and Appendix E. These procedures describe how to control erosion, and minimise off-site exports of sediment and nutrients from the proposed development area during the construction and post-construction phases. A plan for monitoring water quality to demonstrate compliance with water quality objectives has also been included. 02011 Simmonds & Bestow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011 I ICLIEN T FILESIContrasl Constnuoonsl/ 109-155c - Essence of Pee an SCEP Stage I Updale\090utput DocumentsU I I09.155c SMP Scanlon Property G`oup_SECP_ge_ta_110905 doc
Page 76
Pacific Plumbing - Scanlon Property Group Pty Ltd
Essence of Peregian: Stormwater Management Plan, Sediment and Erosion Control Plan
Table of Contents
1. INTRODUCTION ........................................................................................................................................1
2. SITE LOCATION ........................................................................................................................................ 2
3. LOCAL ENVIRONMENT ...........................................................................................................................3
4. SITE FEATURES .......................................................................................................................................4
5. STORMWATER MANAGEMENT PLAN ...................................................................................................5
5.1. MANAGEMENT OF OVERLAND FLOW OF STORMWATER ...................................................5
5.2. PROPOSED TREATMENT TRAIN .............................................................................................6
5.3. MODELLING OF THE STORMWATER TREATMENT TRAIN ...................................................7
5.4. LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES ..................8
6. SEDIMENT AND EROSION CONTROL PLAN .........................................................................................9
7. INSTALLATION SEQUENCE ..................................................................................................................11
8. ENVIRONMENTAL IMPACT ASSESSMENT .........................................................................................12
9. MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS ................................14
10. CONDITIONS AND LIMITATIONS ..........................................................................................................17
11. COMPLIANCE CERTIFICATE ................................................................................................................18
12. REFERENCES .........................................................................................................................................19
APPENDICES
APPENDIX A: ........................................................................................................................... SITE PLANS
APPENDIX B: .............................................................................................................. MUSIC MODELLING
APPENDIX C: .................................... SEDIMENT AND EROSION CONTROL PLAN DAILY CHECKLIST
APPENDIX D: .............. LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES
APPENDIX E: ............................................................. SEDIMENT AND EROSION MANAGEMENT PLAN
©2011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
1 CLIENTFILES\Conlrast Constructions\1109-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documenls\J-1109-155c_SMP_Scanes Property
Group_SECP_ ge_ta_110905 doc
Page 77
TABLE OF FIGURES
Figure 1: General Location of the Proposed Development ............................................... ...........2
LIST OF TABLES
Table 1: Water Quality Objectives .............................................................................................................3
Table 2: Water Quality Design Objectives for Loads Reductions ..........................................................3
Table 3: MUSIC Model Results from the Developed Site with Treated Stormwater .............................8
Table 4: Management Actions of the Essence of Peregian Stormwater Management Plan ...............8
Table 5: Factors Contributing to Erosion Hazard ....................................................................................9
Table 6: Sediment and Erosion Control for Construction of the Essence of Peregian .................... 10
Table 7: Installation Sequence for the Essence of Peregian Development ....................................... 11
Table 8: Site Details of the Essence of Peregian Development .......................................................... 12
Table 9: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions ....................... 13
Table 10: Summary of Test Methods for Ambient Surface Waters ..................................................... 14
Table 11: Location of Water Quality Monitoring at the Essence of Peregian Site ............................ 15
Table 12: Monitoring Schedule for the Construction and Operational Development ....................... 16
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
11CLIENTFILES'Contrast ConstruceonsU 109-155c - Essence of Peregian SCEP Stage 1 Updatet09_Output DocutnentsU-1109-155q-SMP_Scan1on Property
Group SECP,ge_ta_ 110905. doe
Page 78
1. INTRODUCTION
Simmonds and Bristow have been commissioned by Contrast Construction Pty Ltd (for the
Scanlon Property Group Pty Ltd) to revise the Stormwater Management Plan (SWP) and
Sediment Erosion Control Plan (SECP) for re-development of the Peregian Caravan Park as
the Essence of Peregian. This revision addresses Stage 1 of the development only, and does
not reiterate discussion of receiving water quality and soils information as these were previously
described in sufficient detail (SCEP, Simmonds and Bristow, 2010)
The revised plans for the Stage 1 development describe two development phases. The
construction phase, when building activity disturbs the ground surface, is described by the
SECP. The maintenance phase, when the commercial and hotel development is fully built and
operational, is described by the SWP. The plans are intended to protect the environmental
values of receiving waters by minimising the hydraulic disturbance and loads of contaminants in
run-off from the development site.
The SECP for the Stage 1 development has adopted the existing erosion hazard and risk
assessment for the development site (SCEP, Simmonds and Bristow, 2010). The SECP
provides information on managing the erosion and off-site export of soil from the development
site, and identifies the personnel responsible for establishing and maintaining all erosion and
sediment control measures.
The SWP for the Stage 1 development describes the stormwater treatment train, which has
been reduced to managing stormwater from the commercial area, the hotel precinct, and
overland flow from upslope sources. It is proposed that stormwater from these sources will be
channelled through treatment units before release into the receiving waters of the Noosa
National Park. The SWP is based on assessments and MUSIC computer modelling of likely
changes to annual stormwater sediment and nutrient loads from the proposed Stage 1
development. The plan also provides information on managing the stormwater treatment train,
and the personnel responsible for this management.
The plans are prepared in accordance with the Queensland Best Practice Environmental
Management Guidelines 2009. References were also made to the following guidelines:
• Introductory Erosion and Sediment Control Guidelines for Queensland Councils;
• Erosion & Sediment Control: A decade of lessons learnt; and
• Controlling stormwater pollution on your building site.
This report directly follows from the revised SWP and SECP (J-1005-310: Essence of Peregian:
Stormwater Management Plan; Sediment and Erosion Control Plan, Simmonds & Bristow,
December 2010). The SWP for the Stage 1 development addresses only stormwater from the
commercial precincts, which are to be routed directly into the Constructed Wetland C2 (the
southern wetland).
02011 Simmonds & Bristow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
I ICLIENTFILESIContrast Conslnr cao.sU I09L 155c Essence of Peregian SCEP Stage 1 Update109_Output DocumentsU 1109. 155c_SMP_Scanbn Property
Gmup_SECP_ga_1a_t10905 doc Page 1 of 21
Page 79
2. SITE LOCATION
The development will be called "Essence of Peregian", which will be sited on Lots 8, 9 and 10
on P 9315 and Lot 76 on MCH 2969, Parish of Weyba, County of March (Figure 1). These
allotments are collectively located at 215-219 David Low Way, Peregian Beach, and vehicle
access to the site is from an unnamed road that runs off David Low Way. The site is 23,131 m2.
The Stage 1 development proposal is for a commercial building containing a retail/restaurant
area.
%nfrsa r'U1ele ^7<al2s - Powered by MalInforZr -v ....:. .,: ' ` lea lplQ a^3.ipm 't1v'r•:V I:y 'taplnfrr:.
jewantin
0 Iloosa
Meads
a
6232M1171313/792 S 3 t:- 6 -445
2i^3 2
^2R2201i tt
1 t2 A.
10 ., Sc
2 is C i^ x
dloosatnge
p S1lrtshile beach
2P 23 21 tf 37131311 3 tt
3^
1777 231253 2M 1t' 7 J^
24 1t7c 33 t
s7
za i
20 ItD ` a
2 acct
23f7622^'^
11237233
f37]M23f
rzT
23.3 224
221
f t f 11
t15 l
213 - 1?
211 ^ 45 ..
207 2otj - k
198 31
191•» •7•
Source: http://rrif.noosa.qld.gov.au/masterviewpublic/modules/mappingcontrol/default aspx?page=search
Figure 1: General Location of the Proposed Development
02011 Simmonds & Bnstow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
I ICLIENTFILES\Contrasl Constructions\1109-155c - Essence of Peregian SCEP Stage I Updale100_Output UocumentsU.I 109-155c SMP_Scanbn Property
Group SECP_ge_ta_ 110905 doc Page 2 of 21
Page 80
3. LOCAL ENVIRONMENT
The site, surrounding land use, existing topography and stormwater flow direction were
described in the conceptual Stormwater Management Plan (Simmonds and Bristow, 2009)
The receiving environment for stormwater runoff is remnant native wet-heath vegetation that
grows along the western boundary as an extension of the Noosa National Park (Natural
Solutions, 2007). For this development it was proposed at the Joint Experts Conference that
the long term median water quality targets for stormwater entering the receiving environment
should be the values listed in Table 1. These long term targets do not apply to individual
measurements from runoff events, or to construction phase monitoring. The low pH target for
stormwater reflects the naturally low pH character of the wallum/tannin stained receiving waters.
Table 1: Water Quality Objectives
Indicator Water Quality Objectives
Suspended Solids 15 mg/ L
Total Phosphorus 35 pg/L
Total Nitrogen 350 pg/L
pH 5-7
These outcomes can also be compared with the Water Quality Objectives for loads reductions
required by the Queensland Water Quality Guidelines (DERM 2009)(Table 2). The loads
reductions water quality design objectives are important because stormwater flow is
intermittent, with most export of sediment and nutrients occurring during a few short rainfall
events each year. Management needs to cover those few rainfall events, and design objectives
for annual load reductions need to accommodate for high stormwater-flow events.
Table 2: Water Quality Design Objectives for Loads Reductions
Indicator Water Quality Objectives
Suspended Solids 80% reduction
Total Phosphorus 60 % reduction
Total Nitrogen 145 % reduction
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
[ %CLIENTFILES\Contrast ConslruchonsM09-155c - Essence of Pereglan SCEP Stage I Update\09_Outpm DocumentsU. 1109.155c_SMP_Scanlon Property
Group_SECP_ge_ta_110905 dot Page 3 of 21
Page 81
4. SITE FEATURES The planned Stage 1 development seeks to change part of the site from a caravan park to commercial, retail and restaurant uses. The remainder of the site will be developed as visitor accommodation during the Stage 2 development. The proposal for Stage 1 is a commercial development that will face David Low Way, and provide a street level frontage of retailing and restaurant services, with an accommodation module on the upper level of the building. The proposal includes car parking spaces and motor cycle bays located under the accommodation and commercial buildings. The objectives with regard to the conserving and utilising the landscape and ecological features of the site are described in the conceptual Stormwater Management Plan (Simmonds and Bristow, 2009). They include utilising existing native vegetation, topography, natural buffers to the wetlands adjacent to the national park and aspect in building design. The intensity of stormwater flows will be mitigated by one (1) large underground water storage tank for the commercial building. The captured water will be reused for non-potable domestic purposes (laundry, toilets) or for irrigation of the gardens. Stormwater will also be directed through a treatment train consisting of a Bio-retention Trench, and a Constructed Wetland System with a gabion wall diffuser adjacent to the Noosa National Park. This treatment train is designed to achieve the median water quality objectives listed in Table 1 and Table 2. 02011 Simmonds & Bristow Pty Ltd Paofic Plumbing - Scanlon Property Group Pry Ltd J-1109-155 - 8 September 2011 I CUENTFit FSCo.*a$l Cunsbuceons\11041S5c - Essence o1 Perepen SCEP Siege I Up0e4109_OubW Doo,,w sU-110-155c_SMP_Scanbn Properly Group_SECP_9ep_710905 me Page 4 of 21
Page 82
S. STORMWATER MANAGEMENT PLAN
Plans provided in Appendix A show the location of key features of the Essence of Peregian
SWP that are relevant to Stage 1 of the development. These plans are:
J-1005-310-01 - Rev 2, Nov. 2010, Site Location;
J-1005-310-02 - Rev 2, Dec 2010, Proposed Bio-retention Basins and Wetlands;
J-1005-310-04 - Rev 1, Dec 2010, Bio-retention Basin and Wetland Layout;
J-1005-310-05 - Rev 2, Dec 2010, Bio-retention Basin and Wetland Cross Section A-A;
J-1005-310-06 - rev 1, Nov. 2010, Stormwater Treatment Train (Operation Phase);
J-1005-310-07 - Rev 1, Nov 2010, Stormwater Management Control Areas;
J-1 105-310-07b - Rev 1 Sep 2011, Stormwater Management Control Areas Stage 1 Only;
Plans that are directly relevant to the Stage 1 development are listed in Appendix A as follows:
The Site Location (Drawing 01) and the Bio-retention Basin and Wetlands Plan (Drawing 02)
show site boundaries of the Essence of Peregian in relation to the Noosa National Park to the
west, and urban development to the north, south and east.
The Essence of Peregian development will install water sensitive urban design features to
ensure that water quality entering the Noosa National Park meets the required guideline
concentrations (Table 1). These features will capture and hold stormwater in a Rainwater Tank
and on the land, the stored rainwater will be used for domestic purposes within the commercial
complex, or for irrigating the gardens to ensure stable ground cover. Stable ground cover is an
important feature of erosion risk management.
Stormwater will be piped directly into a Bio-retention Trench (Drawing 03, Drawing 04) which is
a depression storage designed to infiltrate stormwater into the ground. This features will be
installed within fill platforms placed over the existing landscape, hence acid sulphate soils will
not be excavated and disturbed. The fill platforms in the design plans have a minimum height
of 3.3 m, which is above the 100 year ARI flood level identified for the nearby Lake Weyba (RL
2.05m AHD) (Brown, 2007). After passing through the Bio-retention trench, stormwater will flow
through a constructed wetland system (Drawing 05).
Overland flow will be diverted, via catch drains, into the Bio-retention trench (Drawing 06,
Drawing 07) for treatment by the Bio-retention trenches and constructed wetlands.
Overflow from the rainwater catch tank will be piped directly to the constructed wetland.
The development site does not fall within the flood hazard area nominated by the Noosa
Council (Brown, 2007). The stormwater treatment train is designed to accommodate the most
intense stormwater event encountered during a 5 year interval described by the ARI records
(202 mm/hour over a 5 minute period) (Australian Government, Bureau of Meteorology).
5.1. MANAGEMENT OF OVERLAND FLOW OF STORMWATER
This sub-section describes the treatment train (Drawings 02, 06 and 07) used to
manage stomiwater flowing through the Essence of Peregian development. The
treatment train is designed to keep stormwater within the landscape of the proposed
development site. There are three treatment units in the design treatment train:
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
1 `CLIENTFILES'Cont,st ConstrucbonsU 109.155c - Essence of Peregan SCEP Stage I Updatet09_0utpne Docun,enlsU-1109-155c_ShW_SCanbn PTopedy
G'oup SECP_ge_ta_1t0905.doc Page 5 of 21
Page 83
Vegetated Buffers
Vegetated buffers provide stable groundcover, thereby minimising the erosion potential
of the landscape surface. Vegetation includes grassed surfaces and deep rooted
vegetation. Energy from rainfall is dissipated over a broad, stable surface, and shallow
sheet-flow of accumulated stormwater is slowed by the rough surface provided by the
vegetation. The soil binding capacity of the plant roots, and the capacity of the plants to
assimilate nutrients from infiltration water, provides the first step of the treatment train.
Stormwater flows from the vegetated buffers into Bio-retention Trenches or directly into
the Constructed Wetland System.
Bio-retention Trenches
The Bio-retention Trenches are generally dry, but during a stormwater flow the trenches
may contain accumulated water to a depth of 200 mm, and 150 mm shortly thereafter
when the trench is dewatering. The trenches are designed to allow passive infiltration of
stormwater through the substrate of the trenches, and into the adjacent soil. The
infiltration rate is designed to allow effective assimilation of nutrients by grasses in the
trenches, which evapo-transpire some of this water, and filter off suspended solids
during the process.
Flow out of the Bio-retention Trenches is underground, with collection of filtered water in
a gravel layer that exits the trench through a Low Flow Underdrain Pipe. Flow out of the
Bio-retention Trenches during high flow will primarily be through, and across, the crest of
the gabion weirs. Maximum flow depths over the weir crests in the 100 year local runoff
event are estimated to be less than 25 mm, assuming minimal flow losses through the
gabion weir walls due to long term blockage. Outflow is towards the Constructed
Wetland System.
Constructed Wetland System.
The Constructed Wetland System features permanent water bodies that provide a final
polishing step to stormwater flowing through the treatment train. Suspended solids
settle out within the standing water, and the flora and fauna within the constructed
wetlands assimilate nutrients. Pollutants that may enter the Constructed Wetland
System are contained, diluted by the large volume of water in the standing water body,
and collect in sediment at the base of the wetland system or at the water margin. The
processed stormwater in the water column can exit the Constructed Wetland System
through the gabion diffuser wall.
The Constructed Wetland System provides an ecological barrier to pest flora entering
the Noosa National Park. By maintaining local plants within the Constructed Wetland
System, and removing weeds, the Constructed Wetland System is designed to work as
an ecological barrier.
5.2. PROPOSED TREATMENT TRAIN
This sub-section describes the proposed treatment train for stormwater management
associated with the operating phase of the developed site (after construction is fully
complete). The treatment units include a Rainwater Tank, Vegetation Buffers,
Bioretention Trenches and the Constructed Wetland System used to manage
stormwater. The treatment train sequence is shown in Appendix B as follows:
02011 Simmonds & Bnstow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
I ICLIENTFILES1Contraft Conse,ct,ons11 109-1550- Essence of Pemgan SCEP Stage I UpdateW9-output Docume, IsU-1109-1SSc_SMP_Sc nbn Property
Group SECP_ge_ta_ 110905d0C Page 6 of 21
Page 84
Commercial Section
1) Direction of flow from the Commercial area (hotel, restaurant roof, tank) into Wetland
C2
2) Direction of flow from the South balance (overland flow) and Commercial area
(restaurant podium) into Bio-retention Cl,
3) Direction of flow from Bio-retention C1 into Wetland C2.
Stormwater that has passed through all these treatment units enters the receiving node
(Appendix B). The design stormwater quality passing through the treatment units, as
well as into the receiving node, were modelled using MUSIC Version 4.
5.3. MODELLING OF THE STORMWATER TREATMENT TRAIN
Results of MUSIC modelling showed that there will be a decrease in stormwater runoff
from the Stage 1 development area. Loads of sediment, total nitrogen and total
phosphorus will be substantially removed from stormwater before entering the Noosa
National Park from the Stage 1 development area (Appendix B).
There will be an 84% reduction in stormwater entering Noosa National Park, from 6
MUyear to 0.9 MUyear. The annual load of total suspended solids from the
undeveloped commercial area is about 1000 kg/year, whereas the annual load from the
developed site is 140 kg/year (Appendix B). Likewise, annual loads for total nitrogen
and total phosphorus are also expected to be an order of magnitude lower than the
present load from the existing caravan park site (Appendix B).
Water Quality predictions from the MUSIC model (Appendix B) indicate that
contributions of total suspended solids, nitrogen and phosphorus in treated stormwater
from the developed site (Table 3) comply with the required water quality objectives
(Table 1 and Table 2). The median design concentrations are expected to be below the
required water quality objectives, and 90% of the time this should be the case (refer to
receiving node results listed in Appendix B).
The predicted maximum concentrations of suspended solids, nitrogen and phosphorus
in extreme stormwater flows might temporarily exceed the guidelines (Appendix B), but
the design concentrations (Table 3) will be improved from the existing water quality in
the terminal wetland measured after a stormwater flow event (refer to Table 3 in
Simmonds and Bristow, 201OErrorl Reference source not found.). The MUSIC
modelling indicated that the treatment train for the Essence of Peregian development will
improve the water quality of stormwater entering the terminal wetland.
©2011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Ply Ltd J-1109-155 - 8 September 2011
IICLIENTFILES1Contrast Constmcuons11109. 15Sc . Essence of Peregian SCEP Stage 1 Up1ateto9_outpul DocumentsU-11o9.1SScSMP_Scanlon Property
Group_SECP_ge_ta_110905 aoc Page 7 of 21
Page 85
Table 3: MUSIC Model Results from the Developed Site with Treated Stormwater
Water Quality Indicator Result
Estimated long-term concentration (mg/L) Median (mg/L) Maximum (mg/L)
Suspended Solids <1 3
Total Phosphorus < 0.01 1.2
Total Nitrogen < 0.01 7.5
Estimated long-term load (kg/year) % reduction Load (kg/year)
Suspended Solids 87 140
Total Phosphorus 88 0.4
Total Nitrogen 84 2.4
Assume Kim= 150 mm/hr
5.4. LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES
Management actions for keeping the treatment train in working order are listed in Table
4, and are described in detail in Appendix D. Management of stormwater during the
construction phase will be covered by the Sediment and Erosion Control Plan.
Table 4: Management Actions of the Essence of Pereoian Stormwater Management Plan
Management Action Description
EP-SMP-02 Maintaining the 100 m3 underground rainwater tanks associated with the
ornamental garden irrigation scheme
EP-SMP-03 Maintaining the vegetated buffer zones
EP-SMP-04 Irrigating the ornamental gardens
EP-SMP-05 Maintaining the bio-retention trenches
EP-SMP-06 Maintaining the pipe infrastructure
EP-SMP-07 Maintaining the terminal wetland
Refer to Management Actions in Appendix D of Simmonds and Bristow (2010)
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
11 CLIENT FILES\Conlrasl Construcuons11 109-155C - Essence of Peregian SCEP Stage 1 Update109 Output DocumentsV-1109-155c_SMP_Scanion Property
Group_SECP_ge_ta_110905.doc Page 8 of 21
Page 86
6. SEDIMENT AND EROSION CONTROL PLAN
The Noosa River: Environmental Values and Water Quality Objectives state that the
environmental values associated with the Noosa River Wetlands include aquatic ecosystem
protection, and cultural and spiritual values. Because Noosa National Park is a protected area,
these values require a high level of protection (level 1 protection).
During the construction of the Essence of Peregian Stage 1 development, there is a hazard that
disturbed soil might be carried into the wetland by stormwater. Mobilisation of stockpiled
sediment is of particular concern, but this hazard can be easily managed. In particular, fine
sediment mobilised by stormwater will potentially carry nutrients into the wetland. The likely
consequence of this is increased nutrient availability to weeds, with potential negative
consequences for the adjacent Noosa National Park ecosystem.
Assessment of the Queensland Best Practice Environmental Management Guidelines (DERM,
2009) checklist (Table 5), shows that overall there is a high erosion hazard for this site. This
hazard is directly affected by soil type (particularly imported fill on lower slopes), the need to
reshape the ground surface to construct structures, and the anticipated duration of site
disturbance being 3 to 6 months. The hazard is greater during the wet season between
November and July when the average monthly rainfall is expected to be above 100 mm.
Table 5: Factors Contributing to Erosion Hazard
Erosion Hazard Assessment Form
Controlling Factor Points Score
Average Slope of Whole Site 1 1
Soil type being disturbed 2 or 5 3 or 6
Anticipated duration of site disturbance 5 8 or 11
Erosive rainfall risk during site disturbance 1 between Aug - 9 or up to 13
Oct; 2 between Nov
- Jul.
Off-site sediment control (downslope of soil disturbance) 0 9 or up to 13
Run-off entering the site 0 9 or up to 13
Extent of site disturbance 2 11 or up to 15
Total Score 11 -15 High Erosion Risk
By implementing sediment and erosion controls, it is possible to moderate the erosion hazard.
This includes protective covering of disturbed soils (particularly on erosion prone parts of the
landscape, and when rain is expected), promptly revegetating soil that is planned to be
stockpiled in the Stage 2 area (in anticipation of future development), scheduling work to avoid
the highest rainfall risk period, installing upslope diversion of runoff away from soil disturbance,
and installing purpose built sediment control traps down-slope of the soil disturbance.
The SECP has identified construction site best practices for managing sediment erosion and
control. A daily site check-list will be used to ensure that building contractors are cognizant of
and performing the required management actions. This check-list is attached in Appendix C.
The SECP also coordinates stormwater management with construction milestones, for effective
implementation of sediment erosion and control measures during the construction phase.
The plan layout of the SECP in the proposed development area is shown in Drawing J-1005-
310-08 (Appendix E), which shows where erosion management structures need to be placed
during construction activities. Slope-related erosion hazard areas within the development site
were identified from the topographic map (Drawing J-1005-310-09 in Appendix E), and
represent control points within the construction site where particular care will be needed. The
management actions for controlling erosion of the site, and movement of sediment and nutrients
from the site, are described in Table 6. The detail management plans for sediment and erosion
control are described in Appendix E.
02011 Simmonds & Bristow Pty Ltd Pacific PlumbNng - Scanlon Property Group Ply Ltd J-1109-155 - 8 September 2011
19CLIENTFILESIContrasl Conslruclions11109.155c - Essence of Peregran SCEP Stage I UpdaIef09_Outpul Documen1sU.t109-155c_SMP_Scanlon Property
Group_SECP_ge_u_110905AOC Page 9 of 21
Page 87
Table 6: Sediment and Erosion Control for Construction of the Essence of Peregian
Management Action Description
EP-SLCE' 01 Up-slope stormwater flow diversion.
EP-SECP-02 Site entry and exit points.
EP-SECP-03 Designated on-site stockpiles and waste receptades.
EP-SECP-04 Down slope sediment controls.
EP-SECP-05 Maintaining ground cover.
EP-SECP-06 Stabilizing soil stockpiled for Stage 2 development
EP-SECP Refer to Appendix F
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
I ICLIENTFILES\Contrasl Constructions\1109-155c - Essence of Peregan SCEP Stage I Update\09_Output Doclmenlsu-1109-I55c_SMP Scanlon Property
Group_SECP_ge_la .110905 doc Page 10 of 21
Page 88
7. INSTALLATION SEQUENCE
The installation sequence refers to implementation of the sediment and erosion controls during
construction. The installation sequence described in Table 7 includes management actions
detailed in EP-SECP-01 to -06 (Appendix E).
Table 7: Installation Sequence for the Essence of Pereaian DeveloDment
Item Drawing Installed Removed
Mark out initi;rl Inml-, it Appe,ndix C Before site dr.turtrlnce
disturbance SBMP
Install upslope flow diversions Appendix C: Before site disturbance. After surface ground cover
around area of disturbance, and SBMP is established.
down-slope sediment control
points
Install access point on un-named Appendix C: Initiation of the project
road off David Low Way SBMP
Clear access track Appendix C: Before installing site office.
SBMP
Clear stockpile area Appendix C: Before installing site office.
SBMP
Install site office Appendix C: Before building activity.
SBMP
Install waste areas and stockpile Appendix C: Before building activity. After building activity is
sediment and erosion controls. SBMP complete.
Building activity. Appendix C: After flow diversions, sediment
SBMP control structures, access track,
stockpile area, and site office
have been installed.
Install surface ground cover Appendix C: Re-establish ground cover in
(gardens) SBMP development sub areas within 2
weeks after disturbance
02011 Simmonds 6 Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
I nCUEN1FILES contresl ConsbucOOnstt 109.155c - Essence of Peregian SCEP Stage I up deM109_oo tot DocunwdsU.1109¢ 15k SUP Sca*on Property
Group_SECP_ge_fa_ 11090Sdoc Page 11 of 21
Page 89
8. ENVIRONMENTAL IMPACT ASSESSMENT
The environmental impact of stormwater from the development was assessed using the
accepted solutions for managing stormwater quality in South East Queensland. The Water
Sensitive Urban Design Deemed to Comply Solutions for South East Queensland (henceforth
termed "the Solutions") outlines a seven step process for selecting and designing stormwater
management solutions, to achieve the stormwater management outcomes required by DERM
(2009). The Solutions identify acceptable solutions for "common" development scenarios to
meet design objectives, which are:
1) Stormwater Quality: Limiting the quantity of pollutants by adopting a best practices pollutant
load reduction approach, with consideration of the local climate.
2) Waterway Stability: Controlling the magnitude and duration of stormwater flows, to prevent
exacerbated in-stream erosion downstream of the development.
3) Frequent Flow: The hydraulic disturbance of in-stream ecosystems is similar to the pre-
development condition, which is achieved by capturing the initial portion of runoff from
impervious areas.
The proposed Essence of Peregian development will be in the Sunshine Coast Regional
Council jurisdiction, which is in the North Coast climate region of South East Queensland. The
proposed development type is residential land use, with a scenario of residential development
greater than 2 lots up to 20 lots. The residential development scenario can include commercial
development of high-density, multiple dwelling buildings at a scale of <_ 12,500 m2. This
scenario applies to the 6,970 m2 commercial node of the "Essence of Peregian" Stage 1
development.
The site details of the Essence of Peregian Development are presented on the annotated site
details plan (Appendix C), and summarized in Table 8.
Table 8: Site Details of the Essence of Peregian Development
Site Detail Description
Existing topography The average grade is 12% across the Stage 1 development area and 3 6%
across the entire development (Stage 1, Stage 2 & Stage 3), with a preferred
flow pathway from east to west across the development.
Existing Drainage Characteristics There are no significant existing drainages in the proposed development area.
Proposed Discharge Points and A proposed stormwater drainage has been designed for this development
Invert Levels (refer to plan drawings in Appendix A).
Soils The surface and sub-surface soils of the proposed development area include
imported fill. silty-clay, silty-sand, and fine sand. The surface soils are acidic,
with low nitrogen concentration and very low salinity. Acid sulphate soils may
occur in the sub-surface, but these soils will not be excavated or disturbed
because additional fill will be placed over them.
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
1 CLIENTFILES\Contrast Consimcbons11109-155c - Essence of Peregian SCEP Stage I Update\09_Ontput OocumenI \J.I I09-155c_SMP Scanbn Property
Group_SECP_ge_Ia_110905 doc Page 12 of 21
Page 90
Development details (site layout, sub-catchments, conceptual earthworks and conceptual
drainage) are provided as plan drawings in Appendix A (drawing numbers J-1005-310-01 to
05). Specifications of the site layout (roof area, balance area) are given in Appendix B. The
south sub-catchment (drawing J-1005-310-07 & J-1005-310-07b) will feature a designed
treatment train that flows from the Stage 1 development toward the Constructed Wetland
System and the receiving node of the receiving waters next to the Noosa National Park.
The Solutions state minimum sizes of Rainwater Tanks, Bio-retention systems and Constructed
Wetlands that are required to meet the Queensland Development Code Mandatory Part 4.2 and
4.3, and the stormwater quality objectives outlined in the Best Practice Environmental
Guidelines - Urban Stormwater. The stated dimensions proposed for the Essence of Peregian
development are listed in Table 9.
Table 9: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions
Deemed to Comply
Deemed to Comply Solution Development size
Requirement
Rainwater tank for attached Old Development Code MP 4.3 1 x 1 flOkl - -ornrnernal building
dwellings in the Sunshine Coast requiresl-5 kL per required
Regional Council (North Coast) pedestal in commercial building
region: with a class 3 code (i.e. motels
or boarding houses that
unrelated people co-habit).
Bio-retention System Filter Media 1.1 % Bio-retention South = 0.6
Area (% of catchment area):
Constructed Wetland Macrophyte 6%. Wetland C = 3.2 %
Zone Area (% of catchment area):
The Rainwater Tank is sized appropriately for the commercial building, with ample volume to
satisfy the non-potable water use requirement of the Qid Development Code MP 4.3. The
surface areas represented by the Bio-retention Trenches (0.6 % of the catchment area) and the
Constructed Wetland System (3.2 % of the catchment area) are less than the WSUD Deemed
to Comply Solutions (1.1 % and 6 % respectively).
It is possible to design a stormwater treatment train outside the prescribed parameters,
provided that the Best Practice Environmental Management Guidelines - Urban Stormwater and
the planning requirements of the assessment authority are followed. A carefully designed
stormwater treatment train has been proposed by the Stormwater Management Plan, and has
been supported by detailed MUSIC modelling (Section 5).
In summary, the Environmental Impact Assessment indicated that the proposed Essence of
Peregian Stage 1 development will have negligible consequences resulting from total
suspended solids, total nitrogen and total phosphorus entering Noosa National Park. The
treatment train for the SWP has been designed to minimise the effects of rainfall and
stormwater erosion of the landscape, retain rainwater collected on roofs and hard surfaces for
irrigation and commercial use, and direct remaining overflow through Bio-retention Trenches
and the Constructed Wetland System. Detailed MUSIC modelling identified that the proposed
development will achieve the required water quality objectives (Appendix B). Suspended solids
and total nutrients will be removed early in the treatment sequence (Appendix B). It is predicted
that the maximum concentrations of pollutants in stormwater during extreme events (Appendix
B) will be substantially less than concentrations presently measured in stormwater entering the
terminal wetland from the existing caravan park site (Table 3Errorl Reference source not
found.)
©2011 Simmonds & Bristow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
1:1CUENTFILES1Conlrasl ContNC110n511109-1SSc -Essence of Peregian SCEP Stage 1 Update109 Oulpul Documen1sU-1109-155c_SMP_Scan1on Property
Group SECP_ge_la_l10905.doc Page 13 of 21
Page 91
9. MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS
A draft water quality monitoring program has been developed to measure the performance of
the proposed stormwater treatment train against targets (Table 1). The objective of the
monitoring program is to quantitatively show whether or not the nominated water quality targets
are being met.
The key water quality indicators are total suspended solids, total nitrogen, total phosphorus and
pH (Table 1). Other relevant water quality parameters include microbiological parameters
(faecal coliforms, Escherichia colt), chemical and physical parameters (dissolved oxygen,
turbidity), and herbicides if they are used within the development site. The following water
quality indicators are recommended (Table 10):
• Microbiological: Faecal coliforms, Escherichia coli
• Physical: Biological Oxygen demand, dissolved oxygen, suspended solids, turbidity,
pH;
• Chemical: Total suspended solids, total nitrogen, total phosphorus; and
• Herbicides: If herbicides are used to control weeds on the development site, then
they should be included in the suite of water quality indicators.
Table 10: Summary of Test Methods for Ambient Surface Waters
S&B
Internal
Sample Preparation
Parameter Test Sample Analysis Method
Method
Method
Number
WC250 &
Nutrients - total Heated persulphate digestion SEAL A02 discrete analyser
WC270
E coli WB302 Membrane filtration EC Broth or EC-MUG medium
Faecal coliforms WB302 Membrane filtration M-FC Agar
BOD5 WC265 Incubation Membrane electrode in Wheaton Bottles
Suspended solids WP100 Membrane filtration Gravimetric
Dissolved oxygen F260 None Membrane electrode
pH F090 None Membrane electrode
Turbidity F170.1 None Photometer
Herbicides 00022 Solvent extraction #GC/MS
#GCMS - Gas Chromotograph/Mass Spectrometer
It is recommended that the water quality of the terminal wetland is represented by four (4)
sampling points per sampling event (i.e. 4 spatial replicates): two (2) from the Constructed
Wetland System and two (2) more from the heath on the west of the terminal wetland (adjacent
to Noosa National Park). The recommended sample points are indicated in Table 11, which
lists the location of sample points during the construction phase and the operational phase.
Monitoring needs to commence during the construction phase, and continue during the
operational phase.
02011 Simmonds & Bristow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
I %CLIENTFILES%Contrast Consvwbons\1109-ISSc - Essence of Peregian SCEP Stage 1 UpdaI W9_Outpul OocumentsU-1109-155c_SMP Scanbn Property
Group SECP_ge_ta_ 11090S.d0c Page 14 of 21
Page 92
Table 11: Location of Water Quality Monitoring at the Essence of Pereqian Site
Site Site No. Description
Wetland C2 1 Monitor quality of stormwater entering wetland C2
Wetland C2 2 Replicate monitoring of stormwater quality entering wetland C2
Heath 3 Monitor quality of stormwater entering the receiving waters
Heath 4 Replicate monitoring of stormwater quality entering the receiving
waters
Construction Site 5 Monitor rainfall onto construction site
Inflow onto construction 6 Monitor quality of stormwater entering construction
site
Inflow onto construction 7 Monitor quality of stormwater entering construction
site
Outflow from construction 8 Monitor quality of stormwater exiting construction sitr-
site
Outflow from construction 9 Monitor quality of stormwater exiting construction sits
site
Water Quality Monitoring During Construction
During construction, monthly monitoring for the parameters described in Table 10 is
recommended from sites 3 and 4 (Table 11). Additionally, it is recommended that the
suspended solids concentration of stormwater is measured at sites 5 to 9 during stormwater
events, with collection of four (4) stormwater samples flowing onto the construction site, four (4)
more stormwater samples flowing from the construction site into the terminal wetland, and a
rain-gauge is installed on site to indicate the intensity of rainfall during a stormwater event
(Table 11).
Inflow and outflow water needs to be collected as paired samples within a short time frame, with
each pair representing the same phase of stormwater activity. The volume of stormwater
generated in the catchment can be calculated by the area of catchment and the intensity of
rainfall during the event. The proportionate change in the suspended solids loads in stormwater
flowing over the construction site will provide a measure of the sediment being generated from
the construction site.
Herbicide monitoring in stormwater entering and leaving the construction site should be
performed when applications are known to occur, rather than routinely. Some herbicides have
a short residence time, so arrangements may need to be made with the laboratory for rapid
courier service and turnaround time. The monitoring schedule is listed in Table 12
The temporal frequency of stormwater monitoring during the construction phase is listed in
Table 12.
Water Quality Monitoring During Routine Operation of the Essence of Peregian
Sampling should be performed at sites 1 to 4. The temporal sampling frequency is
recommended at monthly intervals for the first 12 months, with quarterly sampling thereafter
(Table 12). This temporal frequency is intended to show the proportional improvement from the
existing water quality condition in response to improved stormwater management associated
with the new development. Seasonal variations can be identified from the quarterly samples.
Herbicide monitoring is as described for the construction phase.
02011 Simmonds & Bristow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
11CLIENT FILE SlConlrast Consiructions\1109-155c -Essence or Peregran SCEP Stage I Updale109_Outpul O ocumentsU-1109-155c_SMP_Scanlon Property
Group SECP_ge_la_ 110905.doc Page 15 of 21
Page 93
Table 12: Monitoring Schedule for the Construction and Operational evelopment
Site Site Site Site Site Site Site Site
Parameter 2
1 3 4Site 5 6 7 8 9
Rainfall S
pH M M M M
Dissolved oxygen M M M M
BODE M, M* M* M,
Suspended Solids M M M M S S S
Total Nitrogen M M M M
Total Phosphorus M M M M
Herbicides M M M M S S S S
Faecal coliforms M M M M
Enterococci M M M M
Turbidity M M M M
M = monthly monitoring during construction and during the first year of operation; quarterly monitoring during the
second year and thereafter.
S = Monitoring during stormwater flow events
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
1 CCUENTFILES\Confrast Constwcwns11109- ISSc . Essence of Peregian SCEP Stage I Update 09- Output DocumentsU-1109155c_SMP_S anbn Property
Group SECP_gs_la_110905 doc Page 16 o121
Page 94
10. CONDITIONS AND LIMITATIONS The data contained in this volume has been commissioned by Contrast Construction Pty Ltd to support a Development Application for Operational Works associated with the development known as 'Essence of Peregian' located at 215-219 David Low Way, Peregian Beach. In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level data, calculations and previous reports prepared by Council and external consultants to support the original development application, and the preparation of Joint Experts Reports for the court ordered mediation process associated with the preparation of the negotiated approval conditions. While reasonable precautions have been taken to validate the data provided before its incorporation into modelling and design procedures, the absolute accuracy of such data cannot be guaranteed with certainty and may vary over time as site conditions change. As such, it is anticipated that minor changes may be required on site to allow the recommendations of this plan to be implemented effectively. Minor or temporary changes to accommodate on-site conditions during the construction phase should be made in consultation with a suitably qualified and experienced professional engineer or qualified sediment and erosion control specialist. Any proposed permanent changes required to the layout, geometry, depth and/or volume of bio- filtration basins and/or wetland elements as a result of any site conditions that are different to those assumed and modelled during design, should be referred back to the designer, or to a suitably experienced and qualified stormwater management consultant, and resubmitted to Council for compliance re-cert ifi cation and approval. The Stormwater Management Report contained within this report comprises of all constituent parts of the report in full, including the text, calculation summary and appended drawings. If additional copies of this report are required, separate sections or individual pages must not be copied in isolation. Except for archival and record keeping purposes, this report should not be copied and stored in any electronic media or passed onto other parties without the express written permission of Simmonds & Bristow. No part of this report may be copied or used for any other purposes other than the purpose stated in this report. 02011 Simmonds & Bestow Ply Ltd Pacific Plumbing - Scanlon Property Group Ply Ltd J-1109-155 - 8 September 2011 I %CLIENTFILES1Conuast Construcoons11109-155c - Essence of Pemggan SCEP Stage I Updateb9 Output Ooc,nnenlsU-1109-155c_SMP_Sunbn Properly Gmup_SECP_ge_tn_ 110905.doc Page 17 of 21
The text continues on page 95.
Used in these records
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.