Skip to the record
Beware of cheap imitations.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
11.        COMPLIANCE CERTIFICATE

Simmonds & Bristow hereby certifies that the Stormwater Management Plan, as detailed within
this report, "Essence of Peregian, Stormwater Management Plan & Sediment & Erosion Plan,
Simmonds & Bristow, September 2011," (including the associated drawings listed and attached
herein - J-1005-310-01 to 09), if implemented and maintained on site in accordance with the
detailed instructions set out for both the Operational and Construction Phase of the
development contained within the report, will result in compliance with the relevant conditions of
development consent, in particular:

Condition 61 - " All stormwater drainage (including roof water overflow from the rainwater
storage system) shall be collected and discharged so there is no net increase in stormwater
runoff from the site.

Condition 62 - " A detailed Stormwater Management Plan and a Sediment and Erosion Control
Plan shall be prepared that refines the MUSIC modelling prepared for the concept report.

Condition 63 - "Grease and Oil arrestors and/or stormwater quality improvement devices must
be incorporated into the design to treat all run-off prior to run-off exiting the premises.

Condition 64 - "A detailed maintenance plan shall be prepared for the proposed stormwater
management system - refer specifically to Section 7.4 and Appendix D.

This report and the certification incltided':withm it has been prepared for aspecific location and a
specific development proposal, as (described in this report..Any.1,changes to the development
layout, sequencing, or the relative areas of pervious, impervious or roof areas made
subsequent to this certification shall render this certification void and an amended certification is
to be obtained.




Signed:

David Bristow BE(Chem), lEAust, CPENG, RPEQ, -F-AIM.--




®2011 Simmonds & Bristow Pty Ltd           Pacific Plumbing - Scanlon Property Group Pty Ud                 J-1109-155 - 8 September 2011
L1cUENTFlLES%Coretest Canstucbo %1103155c- Essence C1 Perega, SCEP Stage I tlpdete109_Oup.A Dou esU-1109.155e_SmP_Scuilm Propsly
Ora: p_SECP-ge-la_110905 doc                                                                                              Page 18 of 21

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.