            DRAINAGE CONTROL
                                                                   on your building site


            Soil erosion in unlined diversion drains can be controlled with the use of check dams constructed from
            sand or gravel filled bags. Space the check dams so the crest of the down-slope dam is level with the base
            of the up-slope dam (refer Figure 5.3).




            Check dams




           The early connection of roof water to the stormwater
           system will reduce site wetness and the generation of
           on-site mud. Temporary or permanent downpipes
           should be installed prior to frame inspection and as
           soon as practicable after the roof is laid.

           This practice has been shown to reduce downtime
           following storm events and decrease the average
            building construction time.




                                                                                            temporary roof water connection




For further information about the Healthy Waterways Campaign and The Partnership telephone (07) 3403 4206 or visit the Healthy Waterways website at www.heahhywaterways.org




    F -1                        c. u..aw   1.0(.A\
                                                               X-Ills .6.11 1N I                         s -A a _Jq
                                                                                                         .J!
                                                                                                                                               r.<[^ ^JNxi b a.n#l   MY
                                                                                                                                                                     Redland
                                                                                                                                                                     r.r^

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.