DRAINAGE CONTROL
on your building site
Where practicable, or where stormwater run-off from more than 0.5 ha feeds into the work site, divert
up-slope water around the soil disturbance. Stormwater can be diverted with the use of small catch drains
or perimeter banks (refer Fact Sheet 3). Line all high flow velocity drains with turf or a geotextile fabric to
avoid unnecessary soil erosion
(refer Figure 5.1).
Diverted stormwater should
be discharged onto stable
areas and should not be
diverted into neighbouring
properties, unless written
permission is obtained from
the land owner(s). Avoid
directing stormwater towards
the site's entry/exit point
(refer Figure 5.2).
Divert stormwater around disturbed area
Property Falls Towards Road Property Falls Along Road
Stockpiles
Stockpiles
Figure 5.2
0
Examples of how to divert stormwater run-off around the disturbed areas
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.