I   EROSION AND SEDIMENT CONTROL
    DAILY SITE CHECK LIST
    (t>ntrttIIin;; stt^rn lw.l ei' po Ilun        , onytourbuildingsite


    Location of site

    Site Supervisor



    It is suggested that the site supervisor completes the following checklist daily while site work occurs.

                                                                                               TIMING


                                                                                                         0
                            ITEM AND/OR LOCATION TO CHECK
                                                                                                         a



I      a.   Have the tradespeople and suppliers been made aware of the
            requirements for erosion and sediment control, and the consequences
            involved if there is a breach?

       b. If required, has an Erosion and Sediment Control Management Plan been
            prepared and approved?
            •   Are all contractors and subcontractors aware of the contents of this plan?

       c.   Is the builder's sign displayed?

       d.   Are the sediment fences erected adequately/correctly?
            NOTE:
            •   Geotextile sediment fence buried at least 200 mm below ground.
            •   Posts installed at minimum 2m spacing.
            • Built up sediment should not exceed 1/3 of the height of the sediment fence.
            • No tears or rips.
            •   Not laying down or covered over by materials.
            •   Is there an advisory/attention sign on the sediment fence?

       e.   Is the stabilised entry/exit point (rumble pad) in the correct location?
            NOTE'
            •   Are all tradespeople/suppliers using this entry point?

       f.   Does the entry/exit point (rumble pad) require maintenance?
            NOTE:

            •   Has the entry/exit pad got excessive sediment in it?
            • Turn over with a machine to expose the coarse aggregate again.
            • Aggregate must be 40 mm or greater.
            •   is there a bunding/diversion drain above the stabilised entry/exit point
                (rumble pad) to divert sediment behind the sediment fence?
            • Are the tradespeople using an adjacent lot to gain entry to the site?
                If so, has permission been sought from the land owner(s) and are there
                control measures in place to prevent the movement of sediment off the
                lot and into the gutter?

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.