Skip to the record
Search everything, all in one place.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                                Environmental Management Plan
                                                                                                                                                   Peregian Beach Caravan Park



3.0           Construction Phase Management Plans

CONSTRUCTION PHASE - EROSION & SEDIMENT CONTROL

This element to be read in conjunction with the Stormwater Management Plan & Sediment l Erosion Control Plan (Simmonds & Bristow, 2010) (Appendix A). Relevant
information has been extracted from this document for inclusion in this element of the EMP.

Performance Criteria              No discharge of contaminated water to receiving waters;
                              •    No deterioration in water quality (upstream or downstream of development);
                              n    Location and velocity of drainage flow controlled;
                              n    Exposed and/or unstable soil surfaces revegetate and stabilised; and
                              n   Appropriately installed, operational and maintained erosion and sediment control devices and measures.
                              n    Performance Indicators outlined in the Stormwater Management Plan / Sediment and Erosion Control Plan (Simmonds & Bristow,
                                   2010), including:
                              Upslope storm water flow diversion
                                          Effective diversion of stormwater away from the building site, and in particular away from areas of high erosion hazard;

                                          No evidence of soil erosion on site, such as rills or sheet erosion;
                              Site entry and exit points
                                     -    Minimal transport of sediment offsite onto public roads by exiting vehicles:
                              Designated on-site stockpiles

                                          Minimal sediment accumulation against the sediment fence;
                                          Stockpile covered when required; and
                                          Effective containment of waste.
                              Downslope sediment controls
                                     -    No rill development;




110114_PR20517_EMP.doc                                                                                                                                      Page I I

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.