Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
TABLE OF CONTENTS
Page
1. Introduction I
2. Methodology 1
3. Site Observations
3.1 The Site 2
3.2 Approved Development 2
3.2.1 Building and Earthworks Plan/Tree Impact 2
3.2.2 Koala Habitat Management Plan 3
3.3 The Trees
3.3.1 Tree Survey 3
4. Discussion
4.1 Visual Tree Assessment 9
4.2 Tree Protection Methods and Roots 10
5. Conclusions
5.1 Condition No 16 11
5.2 Condition No 17 11
5.3 Condition No 49 1l
5.4 Tree Protection (Western Reserve) 11
6. Recommendations
6.1 Tree Removal 12
6.2 Tree Protection (Western Side) 12
6.3 Tree Management and Protection Plan 12-16
Bibliography 18
Appendix A - Bulk Earthworks Plan 19-20
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.