Matrix Projects (QLD)- Essence of Peregian, David Low Way Peregian Beach QLD 4573 Page I
1 Introduction
1.1 I, Samuel Cowie Arborist/Horticulturist and Principal of Leaf & Limb
Horticultural Consultancy, have been engaged by Matrix. I have been
engaged for the purpose of investigating and reporting on options related to
the retention or removal, and protection of the existing trees located on the site
being developed as The Essence of Peregian, and advise on any relevant on-
going tree management that is required between trees and proposed
development works.
I inspected the site and trees on the 14th of April 2010 and the 7th of June 2010.
The site inspection and this report were conducted as per SCRC's DA
conditions, specifically conditions No 17, 18, and 49. The report also
addressed issues with condition No 16. This forms the brief of the report.
2 Methodology
2.1 Identification of plant material was conducted using Barwick (2004), Rowell
(1983) and Haslam (2004). All references to pruning are taken from AS 4373-
2007, Pruning of Amenity Trees. Assessment of the trees was conducted
using Visual Tree Assessment (VTA) from Mattheck (1994 & 1999), with
additional references from Matheny & Clark (1994), and Harris (1999 &
2004). Any risk assessment was done using Quantified Tree Risk Assessment
(QTRA version 2007). Additional references to tree anatomy and structure are
taken from Shigo (1986 & 1991), including references to roots from Perry
(1982) and Urban (2008). Specifications on protection of trees and tree roots
during construction activities are taken from AS 4970-2009 and BS
5837:2005, including additional references from Urban (2008).
Mr Clint Sloan of Matrix provided all information in relation to current plans,
reports etc.
A Pentax Optio A30 digital camera set on the highest resolution possible (10
Mega pixels) was used for photographic documentation. A diameter tape was
used for all measurements, giving an average diameter based on the
circumference measurement. Diameter at Breast I (eight (DBH) was taken at
1400mm above ground level on the highest side of the trunk, or as per
AS4970-2009.
No soil or root excavation assessment was carried out during the time of
inspection. Root mapping where specified was done by obvious and visual
signs of disturbance to the soil, surrounding structures and obvious surface
roots.
Leaf and Limb Horticultural ('onsultancy,CJ
Prepared by Samuel Cowie I 1 h of June 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.