Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Matrix Projects (QLD)- Essence of Peregian, David Low Way Peregian Beach QLD 4573 Page 2
3 Observations
3.1 The Site
The site is known as Lots 8-10 on P9315 and Lot 76 on MCH2969 and is
located at 215-219 David Low Way, Peregian Beach QLD (as described by the
Koala Habitat Management Plan by James Warren & Associates, for the site).
The area specifically addressed in this report is the area of the site impacted by
development, specifically those shown on the bulk earthworks plans by TOD
Consulting Engineers (see Appendix A- Bulk Earthworks Plan). The area on
the western side of the gabion wall (Appendix A) is assumed to have no
development impacts, for example soil movement or disturbance.
Site soils weren't assessed during inspection, although casual inspection found
them to be sandy. Considering the habitat of the surrounding area, available
soil depth for root growth is limited by the water logged, and/or relatively high
water table that are preferred by the endemic Melaleuca quinquenervia.
The area is currently used as a caravan and camping site.
3.2 Approved Development
The site has been approved for commercial and visitor accommodation
consisting of 2 buildings with a total of 64 units, and thirty other units, either
duplex or freestanding.
3.2.1 Building and Earthworks Plan/Tree Impact
DA condition No 16 addresses retention of trees outside of the approved
building layout footprint. Given that this affects the majority of trees on the
site, attention was then focused on the bulk earthworks plan that affects the
remaining trees outside of building footprints.
Comparison of the existing contours with the new levels on the bulk
earthworks plan (TOD Consulting Engineers, Job No 10525, Dwg No C4 and
C5) found that from the Gabion wall there is an increase of between 300mm
and 1000mm at the turfed fire trail. The western line of buildings will require
an 800 to 1300mm increase in soil level over the existing soil levels.
Increases over the existing soil RL's continue until approximately the 5-metre
contour, then becomes a cut for the main unit complex in the northeast corner
of the site. The same occurs for the building in the southeast comer, where the
bulk earthworks level is 6.20 metres, which will require up to 2800mm of cut.
This is evidenced by the requirement for sheet piling around the south, east
and northern side of the building footprint.
Areas of undisturbed natural ground level are limited to the section inside the
entrance turnaround, and the area along the southern boundary at the eastern
end, or eastern side of the entrance to the development, bar impacts from sheet
piling installation (a required minimum 1200mm from the building footprint).
Leaf and Limb Horticultural Consultancy©
Prepared by Samuel Cowie I I'h of June 2009
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.