"DJ Environmental Management Plan
Peregian Beach Caravan Park
- Install a high pressure water hose that can reach the rock pad, to remove cohesive mud.
Designated on-site stockpiles
Have a designated site for stockpiling excavated earth, building sand and building materials. Ensure that the stockpiles have
designated covers with pegs to protect them from wet weather, and are sufficiently distant from kerbside drains;
Install a geo-log upslope of stockpile area to divert flow around the stockpile;
Install a sediment fence down-slope of stockpile area to collect sediment; and
At the end of each day, or before the onset of rain, cover and securely peg stockpiles.
Downslope sediment controls
Install geo-textile sediment fences on the lower slopes of the building site. Posts should be minimum of 2m spacing; the base
should be buried at least 200 mm below ground. The fences should be concave upslope to bund stormwater, while allowing
lateral overflow down-slope;
Stabilise ground that accommodates overflow from the sediment fences to avoid rill development (refer to 'Maintaining
groundcover';
Direct overflow into down-slope sediment fence. Use filter socks as a final barrier to contain suspended sediment. Overflow from
the filter socks will be into the terminal wetland. Use water from the terminal wetland to irrigate ground cover (refer to
'Maintaining groundcover);
Install a sediment curtain in the terminal wetland to contain any fine sediment in overtopped stormwater; and
Install temporary downpipes from newly constructed roofs.
Maintaining groundcover
Maintain existing grass cover as much as possible. Reduce damage to grass cover by limiting vehicle movements to work areas
and designated access tracks;
Cover disturbed ground under erosion blanket, secured with pegs and with the edge buried below the soil surface;
Reseed disturbed soils that will be left bare, using hydromulch or equivalent. Irrigate reseeded area daily for four weeks to
establish the grass surface; and
Lay turf in areas where concentrated flow is expected (e.g. at the overflow of sediment fences).
110114_PR20517_EMP.doc Page 13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.