a a J Environmental Management Plar
Peregian Beach Caravan Park
Education of site personnel regarding erosion and sediment control measures, including inspection and maintenance requirements;
n Scheduling of work to avoid the highest rainfall risk period, where possible;
n Ground disturbance to be kept to the minimum required for construction activities;
• Progressive stabilisation of ground disturbance;
• Disturbed and exposed ground at risk of erosion to be stabilised and as soon as possible;
• Vehicles shall keep loads covered;
• If flocculation is required to meet the total suspended solids performance objective, it is to be used in accordance with the
manufacturer's guidelines and reasonable precautions to prevent potential impacts on receiving waters;
n Permanent control measures shall be provided as soon as possible after completion in each construction area. Permanent measures
(e.g. swales/bio-retention/wetlands) to be adopted for this project are outlined in the Stormwater Management Plan / Sediment and
Erosion Control Plan (Appendix A); and
n Construction of stormwater treatment devices, including swales and bioretention basin systems shall be protected from sediment runoff
until the site is stabilised and vegetation is established.
Monitoring • A daily site checklist will be used by the Construction Foreman to ensure that contractors understand and perform the required
management actions. The checklist to be utilised is included as Appendix C of the Stormwater Management Plan / Sediment and
Erosion Control Plan (Appendix A);
• Weekly monitoring of sediment accumulation build up behind sediment fences to be undertaken by Construction Foreman;
n Performance of temporary control measures, sediment accumulation and the suspended solid content of water entering and exiting the
site, is to be monitored by Construction Foreman during significant stormwater event;
• Monthly audit and review of implemented temporary control devices and site erosion and sediment control procedures by the
Environmental Officer;
n Monitoring to be undertaken as per the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Upsiope stormwater flow diversion
Daily inspection of the structural integrity of the perimeter bank and geo-logs:
Daily inspection of the ground surface for erosion;
110114_PR20517_EMP.doc Page 14
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.