Skip to the record
NoosaWatch™: The source of truth.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
          parking. Further, we argue that many patrons to the restaurant would constitute walk-up trade
          originating from existing residential and tourist venues within the local area.
     n    We request that condition 15 be amended to allow hours of operation from 6am to 10pm Sunday to
          Thursday and 6am to 12 midnight Friday and Saturday. The purpose of this change is to accommodate
          residents, visitors and tradespeople wishing to buy breakfast or morning coffee. Again we argue that this
          would not create an unreasonable demand on carparking and would largely suit a walk-up customer base.
          Noise issues are unlikely to be a concern given the ambient background traffic noise.


Landscaping


     n    Condition 21 still applies to all stages, however Council may wish to provide a staged breakdown of the
          landscape condition to enable specification of individual requirements for each stage, particularly for
          Stage 1 fronting David Low Way.


Bicycle Parking & End of Trip Facilities


     n    Condition 23 applies to Stage 1 only.


Relevant Period


     n    Condition 31 be amended to provide a relevant period for the commencement of use of each stage as
          follows:


          Stage 1- 4 years


          Stage 2 - 6 years


          Stage 3 - 8 years


          We note that the roll forward provisions of SPA will further extend the relevant periods by the periods
          stated above where a related approval is lodged within two years of the parent approval.

Lot Amalgamation


     n    Condition 32 has been fulfilled as the lot amalgamation has already occurred. We therefore request that
          this condition be deleted.


Vehicle Access

     n    Conditions 33-37 apply to Stage 1 as the access driveway is to be constructed as part of Stage 1 works.


Car and Motorbike Parking


     n    Condition 38 be amended to provide a breakdown of carparking requirements for each stage. A
          breakdown of the carparking requirements versus the number of carparks provided is given in the table
          below (note that carparking for Stage 3 is to be constructed in Stage 2):




JFP Ref: M2358                                                                                                  Page

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.