.ifTc
0 24 car spaces (236m2 restaurant, assuming 70m2 excluded as kitchen/food storage) PLUS 64 car spaces
7 car spaces (if 70m2 outdoor dining included) - refer to discussion in relation to Condition 13 + 8 motorbike spaces
3 motorcycle spaces + shuttle bus parking
24 car spaces (387m2 retail)
3 motorcycle spaces
5 car spaces (58 bed visitor accom) PLUS
2 car spaces (max 2 staff on-site at any one time) PLUS
shuttle bus parking
TOTAL = 62 car spaces and 6 motorcycle spaces required for Stage 1
(NB. total corporking requirement does not include any credit for motorcycle parking as per PSP26)
32 car spaces (32 visitor accom units - dual key apartments) 76 car spaces
U 30 car spaces (30 visitor accom units - beach shacks) Provided in Stage 2
124 car spaces required across all Stages 140 car spaces (Ii, •urplu%)
8 motorcycle spaces required across all Stages plus 8 motorcycle spaces
(NB. total corporking requirement does not include any credit for motorcycle parking as per PSP26) provided across all stages
n Conditions 39 and 40 will also apply to each stage.
Frontage Works
• Conditions 41-46 apply to Stage 1 only as all frontage works are to be constructed in conjunction with the
commercial building.
Parkland Restoration and Dedication
n Conditions 50-56 and 58-59 apply to Stage 3. As previously discussed, we request that the dedication of
parkland occur at Stage 3B due to the risk of damage to rehabilitation works during Stages 2 and 3
construction. It is impractical to require the rehabilitation of the parkland prior to completion of Stages 2
and 3 to lock-up. Refer to discussion above regarding "Staging".
Roof Water & Stormwater Drainage
• Conditions 61-69 be amended to refer to each stage. An updated Stormwater Management Plan and
Sediment and Erosion Control Plan has been submitted to detail stormwater management measures for
Stage 1 (refer Appendix Q. It is suggested Council include conditions for Stages 2 and 3 to require an
updated SMP for these stages prior to Operational Works approval (note that SMP works for Stages 2 and
3 will be carried out at Stage 2).
Contributions Towards Council Infrastructure
• Condition 88 be amended to provide a breakdown of infrastructure contributions for each stage. We
request that the existing credit applicable over the site be applied wholly in Stage 1 and we confirm that
this approach is in line with recent discussions with Council's Kerri Coyle on 29 July 2011 as the site has
been amalgamated and registered as one lot (Lot 77 on SP231615). Note that the more recent approval
for Reconfiguring a Lot (4 lots into 1 lot into 3 lots) has not been enacted, therefore the development site
JFP Ref: M2358 Page
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.