Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
[==_*iii^^7 SECTION 3 - FIELDWORK 3.1 Drilling and Sampling Methods Fieldwork was undertaken on 14 May 2007 and comprised the drilling and sampling of six bores using a trailer- mounted Hydrapower Trekker drilling rig operating solid flight augers. Strata identification and sampling was from drill cuttings brought to the surface on the auger flights. All soil samples collected from the bores were placed in plastic bags that were sealed after removing as much air as possible and stored on ice prior to analysis. 3.2 Bore Locations and Supervision Bore locations were determined in the field by direct measurement from existing site features and are indicated approximately on the attached Drawing No. 1. The ground surface levels at the bore locations have been interpolated from contours given on PMM's Combined Detail Survey Plan (Drawing No. 7328-03, dated 18 April 2007). An experienced senior geotechnician set out the test locations, logged the stratigraphy encountered in the bores and directed the in-situ sampling and testing program. Residential Development Page 4of10 215-219 David Low Way. Peregian Beach Project No. 07160 18 June 2007
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.