Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
Recover used absorbent materials and petroleum product and place in a sealed container. Clearly label the
container to identify its contents;
Organise a waste contractor, licensed to receive such waste under the Environmental Protection Act 1994, to collect
and treat/dispose of the container;
• Clean-up equipment and materials repaired and replaced as required;
n Corrective actions to be developed in consultation with Sunshine Coast Regional Council and relevant regulatory agencies,
where required;
n The Construction Foreman shall alter procedures or apply, as necessary to produce compliance with the performance
objectives / indicators;
n In the event of a spill the Construction Foreman shall delegate clean up works, as required; and
n The Construction Foreman reserves the right to request any works necessary to maintain compliance.
1 101 14_PR20517_EMP.doc Page 26
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.