                                                                                                                                      Environmental Management Plan
                                                                                                                                         Peregian Beach Caravan Park



DESIGN / CONSTRUCTION PHASE - HAZARDOUS SUBSTANCES

                                      Weekly records of visual inspections by Construction Foreman;
                                  •   Monthly reporting by the Construction Foreman to Site Manager covering all monitoring activities and results as well as
                                      compliance with performance criteria;
                                  n   Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
                                      document any information provided by the Construction Foreman;
                                  n   Non-conformance and complaint details will be forwarded to the Site Manager as soon as practicable;
                                  •   All complaints or incidents of non-compliance are to be recorded on the site Incidents and Complaints Register (refer to
                                      Section 2.5);
                                  n   In the event of a spill the following additional details are to be recorded in the Incidents and Complaints Register:
                                              Reasons why the spill occurred;
                                             Quantity and type of oil/chemical spilled;
                                             Actions implemented to clean up the spill;
                                              Method of disposal of used absorbent and spilled petroleum product;
                                              Details of any potential or actual environmental harm caused consequent to the spill; and
                                              Cost to clean up spill (all costs of materials and labour).
                                  •   The Site Manager is to report any events of non-conformance to the Environmental Officer;
                                  n   In the event of material or serious environmental harm, the Site Manager is to report to Council and appropriate regulatory
                                      authorities;
                                  Responsibility
                                  •   The Construction Foreman
                                  n   Site Manager
                                  n   Environmental Officer
                                  n   Steps to be implemented if a spill occurs:
Corrective Action
                                              stop the spillage or leakage at the source;
                                              ensure the spill does not leave the site, enter waterbodies or drains by bunding (e.g. earth mound, filter sock,
                                              Enretech);
                                              chemical spills to be cleaned up in accordance with the relevant Material Safety Data Sheet for the product spilled;
                                              Use absorbent materials (e.g. Enretech (land spills) or Cellusorb (water spills) to isolate and clean up the spills;



1101 14_PR20517_EMP.doc                                                                                                                           Page 25

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.