                                                                                                                              Environmental Management Plan
                                                                                                                                 Peregian Beach Caravan Park




                             retained vegetation will only be allowed for weed removal purposes by a suitably qualified restoration team (in accordance
                             with the Ecological Restoration Plan; Appendix B);
                         n   The following activities are not to occur within the areas of retained vegetation including the TPZ - vehicle movements,
                             storage and mixing of materials, vehicle parking, liquid disposal, machinery repairs and/or refuelling, construction site office
                             or shed, combustion of any material, stockpiling of soil, rubble or debris, and any filling or excavation including trenching,
                             topsoil skimming and/or surface excavation;
                         n   Construction workers are to be specifically advised of areas and individual trees that are to be retained;
                         •   All tree surgery and pruning works will be undertaken by a suitably qualified and experienced arborist in accordance with
                             Australian Standard AS4373:1996 Pruning of Amenity Trees;
                         n   All activities in areas adjacent to protected vegetation shall be carried out in such a manner as to minimise any damage to
                             trees and/or the conserved area;
                         n   Tree limbs (of trees to be retained) that are likely to be in the way of earthworks shall be pruned by a qualified tree surgeon
                             prior to construction activity commencing (in accordance with the Arborist Report; Appendix C);
                         n   Stockpiling of felled trees will only occur within the development footprint (i.e. areas to be cleared);
                         •   No roots greater than 25mm shall be cut during construction without the consent of the site arborist;
                         n   At least one day prior to vegetation removal a wildlife spotter-catcher will assess the site for the presence of native fauna
                             and undertake procedures outlined in the Fauna Protection Element (Section 3.7);
                         n   Vegetation clearing to be undertaken in a sequential manner and in stages, in a manner where only the minimum amount
                             of ground is open at any one time. Rehabilitation/landscaping of disturbed areas to commence immediately after clearing,
                             where appropriate;
                         n   Upon completion of clearing works the Site Arborist is to undertake an assessment to determine the health and vigour of all
                             retained trees;
                         •   Cleared native vegetation is to be processed by one of the following methods and removed from the site:
                                         Re-use for building materials;
                                         Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less
                                         than 1000m3, less than 2.5m high with a minimum of 1 Om between edges of heaps;
                                         Disposal for firewood:
                                         Disposal for landscaping purposes; or



110114_PR20517_EMP.doc                                                                                                                    Page 28

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.