Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plar
Peregian Beach Caravan Park
Responsibility
• Construction Foreman
• Site Manager
n Site Arborist
Corrective Action • If clearing and disposal methods are not consistent with Sunshine Coast Regional Council's guidelines, necessary changes
shall be made to comply with the guidelines, as required;
• In the event of accidental tree clearing, fencing to be reinstated and the Site Arborist and Council notified;
n Rehabilitation of any non-authorised vegetation clearing will be done in consultation with the Site Arborist and Council;
n Reinstate fencing of retained vegetation and around the parkland area, where necessary;
n The Construction Foreman shall alter procedures or apply corrective action after consultation with the Site Manager and
Site Arborist, as necessary to produce compliance with the performance indicator;
n Any decline in tree health or structural integrity shall be rectified in accordance with the Site Arborist's recommendations;
and
n In the event of a fauna injury, spotter-catcher to coordinate with a local veterinary surgery (refer to the Fauna Protection
Element. Section 3.7).
1101 14_PR20517_EMP.doc Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.