Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
Corrective Action Reinstate barricading and signage, where required;
Modify clearing techniques, where necessary;
• In the event of accidental clearing of fauna habitat, fencing is to be reinstated and Council notified (refer to the Vegetation Management
Element, Section 3.4); and
n Rehabilitation of any non-authorised clearing will be done in consultation with Council (Vegetation Management Element, Section 3.4).
1101 14_PR20517_EMP.doc Page 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.