Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
>aual tty
DESIGN / CONSTRUCTION PHASE - AIR QUALITY
Performance Criteria Comply with:
Environmental Protection Act 1994;
Environmental Protection Policy (Air) 2008;
Relevant Sunshine Coast Regional Council by-laws; and
Health and safety requirements.
n Construction works shall not result in the creation of air nuisance. Air emissions are not considered a nuisance should monitoring of air
quality satisfy the standards listed below':
Total Suspended Particulate (Annual averaged dust concentration) = 90ug/m3
Dust Particles as PM102 (24 hour averaged dust concentration) = 50pg/m3
Visibility reducing particles (1 hr average) = 20km visibility).
n No visible dust emissions beyond the site boundaries; and
• No complaints from adjacent landholders.
Implementation Strategies Odour & Fumes
n All equipment shall be efficient and operated in an efficient manner to minimise exhaust emissions;
n Engines shall not be left idling needlessly;
n All vehicles and plant shall be properly maintained;
n Ensure that emission levels of all vehicles and plant are less than the limits defined by relevant Commonwealth Department of Infrastructure,
Transport, Regional Development and Local Government Australian Design Rules for Vehicle Emissions:
ADR30 - Diesel Engine Exhaust Smoke Emissions;
ADR36 - Exhaust Emission Control for Heavy Duty Vehicles;
ADR37 - Emission Control for Light Vehicles; and
ADR70 - Exhaust Emission Control for Diesel Engine Vehicles.
n No burning of waste material;
• Wastes shall be stored and managed in a manner that prevents odour emissions.
Please note: Concentrations detailed in the Environmental Protection (Air) Policy 1997 are considered the maximum concentrations allowable.
z Note: PM10 is the suspended particulate matter less than 10 microns in diameter.
1 101 14_PR20517_EMP.doc Page 39
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.