Environmental Management Plan
F
W11 lire, Peregian Beach Caravan Park
1.0 Introduction
Backer
This Environmental Management Plan (EMP) has been prepared on behalf of Contrast Constructions Pty Ltd
to manage potential environmental impacts in relation to the approved redevelopment of the Peregian Beach
Caravan Park located at 215-219 David Low Way, Peregian.
The approved development involves the upgrading of the current tourist accommodation facilities by
constructing commercial buildings (restaurant/retail/offices) and accommodation units and beach shacks to
replace the current caravan park. The development also incorporates an approximately 20m service and
buffer area to the adjacent Noosa National Park.
As a condition of approval, an EMP is to be prepared that outlines management strategies to implement
during the construction and operational phase of the development to reduce the risk of environmental harm.
This EMP has been developed with general reference to the following:
Ecological Assessment, June 2007 by Natural Solutions;
Stormwater Management Plan / Sediment and Erosion Control Plan, December 2010 by Simmonds &
Bristow;
Ecological Restoration Plan, June 2010 by RPS;
Arborist Report, June 2010 by Leaf & Limb Horticultural Consultancy;
Koala Habitat Management Plan, June 2010 by James Warren & Associates;
Fire Management Plan, November 2007 by Natural Solutions;
Acid Sulfate Soils Assessment, July 2010 by Butlers Partners;
Waste Management Plan;
Conditions of Development Approval; and
Approved design drawings.
pment Approval
The preparation of the EMP is in response to Condition 69-71 of the Development Approval for a
Reconfiguration of a Lot (ROL) application for the site, issued by the Sunshine Coast Regional Council
(SCRC). The prepared EMP is to address relevant environmental issues in relation to the construction and
operational phase of the development.
Construction and operational works for the approved development need to be undertaken in accordance with
the EMP to ensure the development's impact on the environment is minimal, the environmental values of the
site are protected and enhance, and the development is ecologically sustainable.
Statutory Obligations
In addition to the condition requirements outlined in the Development Approval for the site, the development
has obligations and responsibilities under numerous pieces of legislation and policies at the federal, state
and local levels. The EMP has been prepared to assist the development in meeting these obligations. Table
1.1 outlines the relevant statutory documents and associated compliance requirements.
110114_PR20517_EMP.doc Page I
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.