Skip to the record
The first. The best. The only NoosaWatch™.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                              Environmental Management Plan
                                                                                                                                 Peregian Beach Caravan Park




                                 All regulated waste shall be collected and transferred from site only by appropriately licensed contractors;
                                 Ablution facilities / portable toilets to be used. Sewer waste shall be collected and transferred from site only by
                                 appropriately licensed contractors;
                             n   No burning or incinerating of waste is to occur on the site;
                             •   Refer to additional implementation strategies in the Hazardous Materials element of this EMP (Section 3.3).
Monitoring                   •   Daily inspection of the site, work areas and waste receptacles for litter containment;
                             n   Visual surveys will be conducted on a weekly basis by the Construction Foreman to monitor waste management
                                 performance: and
                             n   Monthly audit and review of site conditions and control measures implemented on site by the Environmental Officer.

Reporting / Responsibility   Reporting
                             n Weekly records of site inspection;
                             n   Records of regulated waste disposal to be maintained by the Construction Foreman as well as other general waste receipts;
                             n   Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
                                 document any information provided by the Construction Foreman; and
                             n   Copies of records and receipts are to be provided to Sunshine Coast Regional Council, if requested.
                             Responsibility
                             n The Construction Foreman.
                             n   Environmental Officer.

Corrective Action            •   Immediately remove any waste that has left the boundaries of the site;
                             •   Immediately cease any non-compliant waste management practices;
                             n   Construction Foreman to instruct a site clean up, when required;
                             n   The Site Manager reserves the right to request any works necessary to maintain compliance;
                             n   Repair the waste receptacle/s as required; and
                             n   Reinforce waste management education with all personnel.




1101 14_PR20S 17_EMP.doc                                                                                                                 Page 46

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.