Environmental Management Plan
Peregian Beach Caravan Park
All regulated waste shall be collected and transferred from site only by appropriately licensed contractors;
Ablution facilities / portable toilets to be used. Sewer waste shall be collected and transferred from site only by
appropriately licensed contractors;
n No burning or incinerating of waste is to occur on the site;
• Refer to additional implementation strategies in the Hazardous Materials element of this EMP (Section 3.3).
Monitoring • Daily inspection of the site, work areas and waste receptacles for litter containment;
n Visual surveys will be conducted on a weekly basis by the Construction Foreman to monitor waste management
performance: and
n Monthly audit and review of site conditions and control measures implemented on site by the Environmental Officer.
Reporting / Responsibility Reporting
n Weekly records of site inspection;
n Records of regulated waste disposal to be maintained by the Construction Foreman as well as other general waste receipts;
n Monthly audit report to be completed by Environmental Officer and should include any recommended corrective action and
document any information provided by the Construction Foreman; and
n Copies of records and receipts are to be provided to Sunshine Coast Regional Council, if requested.
Responsibility
n The Construction Foreman.
n Environmental Officer.
Corrective Action • Immediately remove any waste that has left the boundaries of the site;
• Immediately cease any non-compliant waste management practices;
n Construction Foreman to instruct a site clean up, when required;
n The Site Manager reserves the right to request any works necessary to maintain compliance;
n Repair the waste receptacle/s as required; and
n Reinforce waste management education with all personnel.
1101 14_PR20S 17_EMP.doc Page 46
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.