Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - SURFACE & GROUND WATER QUALITY
- Brush-cut grass within the Bio-retention Trenches to maintain length;
Monitoring n Monitoring recommended in the Stormwater Management Plan / Sediment and Erosion Control Plan (Appendix A), including:
Monthly water quality monitoring of rainwater tanks associated with each beach shack (microbial, nuisance organisms, pH, toxic
chemicals, surface films);
Monthly water quality monitoring of underground rainwater tanks (microbial, nuisance organisms, aesthetics, clarity and colour, toxic
chemicals and debris);
Monthly inspections of garden surfaces and vegetated buffers for bare patches;
Monthly inspections of the bioretention trenches for disturbances to trench floor, and the accumulated debris, litter and silt drapes;
Monthly inspections of the high flow outlet weir grate in bioretention trenches for blockages or detritus build-up;
Monthly inspections of the bioretention trenches for vegetation cover and weeds;
Maintaining pipe infrastructure
Inspect flows entering and exiting pipe-work during flow events;
Daily inspection for evidence of leaking pipe-work;
Maintaining the constructed wetland system
Monthly inspections of the wetland system for accumulated debris and litter and weeds;
Monthly water quality monitoring (total suspended solids, total phosphorus, total nitrogen, pH);
Twice yearly soil pH testing of gardens and vegetated buffers;
Reporting / Responsibility Reporting
• Annual reporting of the rainwater systems water quality performance.
• Monthly reporting of garden and vegetation buffer maintenance sites where permanent cover is difficult to maintain to the On-Site Manager /
Owner;
Maintaining bioretention trenches
Report accumulation of sediment and coarse particulates to the Site Manager (and senior management if necessary);
Report the need to restore vegetation or remove weeds to the Site Manager (and senior management if necessary);
Maintaining pipe infrastructure
- Plumbing subcontractor to report causes of blockages or leaks to the Site Manager;
Maintaining the constructed wetland system
- Report accumulation of litter and the need to restore vegetation or remove weeds to senior management if necessary;
1101 14_PR20517_EMP.doc Page 51
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.