Environmental Management Plan
Peregian Beach Caravan Park
OPERATIONAL PHASE - VEGETATION PROTECTION
erosion/sedimentation, monitor weeds, and watering as necessary;
Quarterly: check mulch, monitor weeds, check for erosion/sedimentation, and monitor regeneration success;
12 months: monitor plant health, check for disturbances from pests, and monitor weeds.
n A qualified site arborist shall monitor the health and structural integrity of the retained trees to be retained on a quarterly
basis for 12 months post construction.
Reporting / Responsibility Reporting
• A brief report should accompany each rehabilitation monitoring period and should summarise the findings of monitoring
events and identify the performance of rehabilitation works with reference to the objectives of this plan and performance
criteria identified in the Ecological Restoration Plan (Appendix B). Recommendations for improvement should be provided
where appropriate; and
n Quarterly reporting by the site arborist of the results and the monitoring and any recommendations;
• Records of planting lists and schedule maintenance works are to be maintained by the rehabilitation contractor.
Responsibility
n Restoration Ecologist.
• Site Arborist.
n Rehabilitation Contractor.
n Where mortalities of planted stock occur, they will be replaced with similar species consistent with the planting prescriptions
Corrective Action
within two months (or at suitable planting periods);
n Replace plant guards;
n Re-instate damaged sediment fencing;
n Water daily if rainfall has not been sufficient;
n Replenish mulch if necessary; and
n Undertake any additional remedial measures recommended by the restoration ecologist and site arborist.
1101 14 PR20517 EMP.doc Page 59
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.