Skip to the record
The gold standard in government transparency.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
                                                                                                                                   Environmental Management Plan
                                                                                                                                      Peregian Beach Caravan Park



OPERATIONAL PHASE - VEGETATION PROTECTION

                                              erosion/sedimentation, monitor weeds, and watering as necessary;
                                              Quarterly: check mulch, monitor weeds, check for erosion/sedimentation, and monitor regeneration success;
                                              12 months: monitor plant health, check for disturbances from pests, and monitor weeds.
                                  n   A qualified site arborist shall monitor the health and structural integrity of the retained trees to be retained on a quarterly
                                      basis for 12 months post construction.
Reporting / Responsibility        Reporting
                                  •   A brief report should accompany each rehabilitation monitoring period and should summarise the findings of monitoring
                                      events and identify the performance of rehabilitation works with reference to the objectives of this plan and performance
                                      criteria identified in the Ecological Restoration Plan (Appendix B). Recommendations for improvement should be provided
                                      where appropriate; and
                                  n   Quarterly reporting by the site arborist of the results and the monitoring and any recommendations;
                                  •   Records of planting lists and schedule maintenance works are to be maintained by the rehabilitation contractor.
                                  Responsibility
                                  n Restoration Ecologist.
                                  •   Site Arborist.
                                  n   Rehabilitation Contractor.
                                  n   Where mortalities of planted stock occur, they will be replaced with similar species consistent with the planting prescriptions
Corrective Action
                                      within two months (or at suitable planting periods);
                                  n   Replace plant guards;
                                  n   Re-instate damaged sediment fencing;
                                  n   Water daily if rainfall has not been sufficient;
                                  n   Replenish mulch if necessary; and
                                  n   Undertake any additional remedial measures recommended by the restoration ecologist and site arborist.




1101 14 PR20517 EMP.doc                                                                                                                        Page 59

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.