Environmental Management Plan
Rr J
Peregian Beach Caravan Park
OPERATIONAL PHASE - VEGETATION PROTECTION
uncontrolled access during the maintenance period;
• Undertake maintenance of rehabilitation areas as outlined in the Ecological Restoration Plan (Appendix B), including weed
control, replacement of mortalities, mulching and watering;
n Herbicides should only be applied in accordance with the Ecological Restoration Plan. No herbicides are to be applied to
native vegetation;
n The parkland area will be demarcated and clearly identified as a'Vegetation Protection Area';
n Remove rubbish which enters the retained vegetation and parkland area;
• Regular weed control is to be conducted across the site to ensure weeds do not establish to levels that can threaten native
vegetation (refer to Weed and Pest Control Element, Section 4.4);
• The Site Arborist is to liaise with the landscape contractor so as to minimise any disturbance to retained trees on site during
landscaping works; and
n Planting of appropriate native and locally significant plant species within landscaping areas.
Monitoring • Monitoring by a suitably qualified restoration ecologist should be undertaken at the completion of revegetation works, then
every three months for the 12 months post rehabilitation. Amendments to the monitoring schedule may be required if
changes to rehabilitation works/progress occurs.
• Monitoring by a suitably qualified restoration ecologist is to consist of the following:
Weed control (extent and adequacy as well as any secondary weed responses to treatments);
Presence of specific environmental weeds;
Indicators of growth and survival of all plantings;
Adequacy of site preparation, mulching, tree (and plant) protection and maintenance; and
Adequacy of flow of information from ecological and project monitoring back to the Construction Foreman, and
subsequent response and integration of any modifications.
n The rehabilitation contractor is to carry out monitoring and maintenance in accordance with the Maintenance Schedule
outlined in the Ecological Restoration Plan, including:
Weekly for 2 months following completion of revegetation: monitor seedling health, check for disturbances from
pests (e.g. rabbits, vandals), check erosion and sediment controls are in place and in working order, and water as
necessary;
Monthly for the first 6 months: monitor plant health, check for disturbances from pests, check for
1 101 14_PR20517_EMP.doc Page 58
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.