Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Environmental Management Plan
up, Peregian Beach Caravan Park
OPERATIONAL PHASE - FAUNA PROTECTION
Reporting / Responsibility Reporting
n Any injured fauna on the site immediately reported to DERM (QPWS) (1300 130 372).
Responsible Person
• Contrast Constructions Pty Ltd
n Corrective works for any damaged fauna habitat: and
Corrective Action
• Reinstate fencing, where required.
1 101 14_PR20517_EMP.doc Page 65
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.