Environmental Management Plan
I L111elow,r Peregian Beach Caravan Park
^• ' • a. : 7 __i t ill
Performance Criteria n To ensure wastes from the development are properly managed and do not pollute any waterbodies or natural areas;
n To ensure that a complaint for the same reason/s does not occur again; and
n Compliance with Environmental Protection (Waste Management) Policy 2000.
n Sealed waste collection bins distributed at strategic locations throughout the site for employees or persons visiting the site to dispose litter;
Implementation Strategies
• Litter collection bins shall be clearly identified as "general waste" and "recyclables";
• Ensure all waste bins are emptied on a regular basis, so that bins have sufficient capacity to contain all waste produced and unreasonable
odours should not be generated;
• Disposal of litter onsite is designed to reduce the possibility of gross pollutants entering adjacent natural areas;
• The commercial bin enclosure / bin wash down area within the Commercial Basement shall be bunded and include falls in the floor slab to a
gully pit that is connected to trade waste. This room shall include 3 refuse bins and 2 recycle bins (Plan WD 2001; Matrix Projects, 2010);
n Within Building A and Building B basements, two separate bin enclosure rooms will be included. Both rooms will have 2 refuse waste bins
and 1 recycle bin. One will service half the beach shacks, while the other will house the bins servicing the apartments within Building A (Plan
WD 3001; Matrix Projects, 2010);
• Within Buildings A and B, on apartment floors (levels 1 and 2), there is a room containing a rubbish chute and a room containing two co-mix
bins that will be decanted daily into the recycle bins by management. Guests staying within Buildings A or B within the resort will empty their
general waste into the rubbish chute (refer to Plan WD 3002 and WD 3003; Matrix Projects, 2010); and
• As required (i.e. weekly or more or less regular), the 1100m3 bins will be emptied by waste removal contractors.
Monitoring • Regular visual inspection of the site to ensure Performance Objectives/Indicators are being met.
Reporting / Responsibility Reporting
• Contrast Constructions Pty Ltd shall maintain records of all complaints received.
Responsibility
n Contrast Constructions Pty Ltd (or designated responsible person).
Corrective Action • Clean up works as required;
• Repair the waste receptacle/s as required; and
• If any complaints are received, the operator will liaise with the Sunshine Coast Regional Council to determine appropriate corrective and
preventative actions to be taken.
1101 14_PR20517_EMP.doc Page 66
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.