Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
EXECUTIVE SUMMARY Simmonds and Bristow were commissioned by Contrast Construction Pty Ltd (for the Scanlon Property Group Pty Ltd) to develop a Stormwater Management Plan (SWP) and Sediment Erosion Control Plan (SECP) for the proposed Essence of Peregian development. There are two previous versions of this plan, which represent the original plan (2009) and a modified plan for the operational works application (2010). Subsequent to these plans it has been decided that this development will be developed in stages. This revision represents Stage 1 of the development, which will include the construction of the commercial and hotel precincts (with the residential units being built at a later date). As such the SECP and SWP presented in this document are a reduced version of the existing plan to accommodate the reduced scope of the Stage 1 development. In all other respects, the SECP and SWP presented in the earlier versions (November 2009, December 2010) are the same. The SWP for the Stage 1 development describes the management of stormwater from the commercial area, the hotel, the upslope sources beyond the development area, and from stockpiled soil stored on the Stage 2 area. This SWP provides computer model outputs (MUSIC 4) that demonstrate compliance of the design stormwater quality with the required guideline standards. These standards were agreed at the Joint Experts Conference, and are consistent with loads reductions required by the Queensland Water Quality Guidelines (DERM 2009). Plans that describe the stormwater treatment train (Appendix A) and outputs from computer modelling used to support the stormwater design (Appendix B) are appended. These plans show the proposed site layout, the location of bioretention trenches, wetlands, building areas, plumbing layout, and the structure of bioretention trenches and wetlands within the development area. Procedures for maintaining stormwater treatment units (Appendix D) and implementing the Sediment and Erosion Control Plan are attached as Appendix C and Appendix E. These procedures describe how to control erosion, and minimise off-site exports of sediment and nutrients from the proposed development area during the construction and post-construction phases. A plan for monitoring water quality to demonstrate compliance with water quality objectives has also been included. 02011 Simmonds & Bestow Ply Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011 I ICLIEN T FILESIContrasl Constnuoonsl/ 109-155c - Essence of Pee an SCEP Stage I Updale\090utput DocumentsU I I09.155c SMP Scanlon Property G`oup_SECP_ge_ta_110905 doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.