Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Pacific Plumbing - Scanlon Property Group Pty Ltd
Essence of Peregian: Stormwater Management Plan, Sediment and Erosion Control Plan
Table of Contents
1. INTRODUCTION ........................................................................................................................................1
2. SITE LOCATION ........................................................................................................................................ 2
3. LOCAL ENVIRONMENT ...........................................................................................................................3
4. SITE FEATURES .......................................................................................................................................4
5. STORMWATER MANAGEMENT PLAN ...................................................................................................5
5.1. MANAGEMENT OF OVERLAND FLOW OF STORMWATER ...................................................5
5.2. PROPOSED TREATMENT TRAIN .............................................................................................6
5.3. MODELLING OF THE STORMWATER TREATMENT TRAIN ...................................................7
5.4. LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES ..................8
6. SEDIMENT AND EROSION CONTROL PLAN .........................................................................................9
7. INSTALLATION SEQUENCE ..................................................................................................................11
8. ENVIRONMENTAL IMPACT ASSESSMENT .........................................................................................12
9. MONITORING AND EVALUATION OF WATER QUALITY AGAINST TARGETS ................................14
10. CONDITIONS AND LIMITATIONS ..........................................................................................................17
11. COMPLIANCE CERTIFICATE ................................................................................................................18
12. REFERENCES .........................................................................................................................................19
APPENDICES
APPENDIX A: ........................................................................................................................... SITE PLANS
APPENDIX B: .............................................................................................................. MUSIC MODELLING
APPENDIX C: .................................... SEDIMENT AND EROSION CONTROL PLAN DAILY CHECKLIST
APPENDIX D: .............. LONG TERM MAINTENANCE OF STORMWATER MANAGEMENT FACILITIES
APPENDIX E: ............................................................. SEDIMENT AND EROSION MANAGEMENT PLAN
©2011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
1 CLIENTFILES\Conlrast Constructions\1109-155c - Essence of Peregian SCEP Stage 1 Update\09_Output Documenls\J-1109-155c_SMP_Scanes Property
Group_SECP_ ge_ta_110905 doc
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.