Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
TABLE OF FIGURES
Figure 1: General Location of the Proposed Development ............................................... ...........2
LIST OF TABLES
Table 1: Water Quality Objectives .............................................................................................................3
Table 2: Water Quality Design Objectives for Loads Reductions ..........................................................3
Table 3: MUSIC Model Results from the Developed Site with Treated Stormwater .............................8
Table 4: Management Actions of the Essence of Peregian Stormwater Management Plan ...............8
Table 5: Factors Contributing to Erosion Hazard ....................................................................................9
Table 6: Sediment and Erosion Control for Construction of the Essence of Peregian .................... 10
Table 7: Installation Sequence for the Essence of Peregian Development ....................................... 11
Table 8: Site Details of the Essence of Peregian Development .......................................................... 12
Table 9: Dimensions of Rainwater Tanks and WSUD Deemed to Comply Solutions ....................... 13
Table 10: Summary of Test Methods for Ambient Surface Waters ..................................................... 14
Table 11: Location of Water Quality Monitoring at the Essence of Peregian Site ............................ 15
Table 12: Monitoring Schedule for the Construction and Operational Development ....................... 16
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
11CLIENTFILES'Contrast ConstruceonsU 109-155c - Essence of Peregian SCEP Stage 1 Updatet09_Output DocutnentsU-1109-155q-SMP_Scan1on Property
Group SECP,ge_ta_ 110905. doe
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.