Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Table 6: Sediment and Erosion Control for Construction of the Essence of Peregian
Management Action Description
EP-SLCE' 01 Up-slope stormwater flow diversion.
EP-SECP-02 Site entry and exit points.
EP-SECP-03 Designated on-site stockpiles and waste receptades.
EP-SECP-04 Down slope sediment controls.
EP-SECP-05 Maintaining ground cover.
EP-SECP-06 Stabilizing soil stockpiled for Stage 2 development
EP-SECP Refer to Appendix F
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
I ICLIENTFILES\Contrasl Constructions\1109-155c - Essence of Peregan SCEP Stage I Update\09_Output Doclmenlsu-1109-I55c_SMP Scanlon Property
Group_SECP_ge_la .110905 doc Page 10 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.