7.          INSTALLATION SEQUENCE

The installation sequence refers to implementation of the sediment and erosion controls during
construction. The installation sequence described in Table 7 includes management actions
detailed in EP-SECP-01 to -06 (Appendix E).



              Table 7: Installation Sequence for the Essence of Pereaian DeveloDment
                  Item                           Drawing                           Installed                                Removed
Mark out initi;rl Inml-, it                  Appe,ndix C            Before site dr.turtrlnce
disturbance                                   SBMP

Install upslope flow diversions              Appendix C:            Before site disturbance.                      After surface ground cover
around area of disturbance, and              SBMP                                                                 is established.
down-slope sediment control
points
Install access point on un-named             Appendix C:            Initiation of the project
road off David Low Way                       SBMP
Clear access track                           Appendix C:            Before installing site office.
                                             SBMP
Clear stockpile area                         Appendix C:            Before installing site office.
                                             SBMP
Install site office                          Appendix C:            Before building activity.
                                             SBMP
Install waste areas and stockpile            Appendix C:            Before building activity.                    After building activity is
sediment and erosion controls.               SBMP                                                                complete.
Building activity.                           Appendix C:            After flow diversions, sediment
                                             SBMP                   control structures, access track,
                                                                    stockpile area, and site office
                                                                    have been installed.

Install surface ground cover                 Appendix C:            Re-establish ground cover in
(gardens)                                    SBMP                   development sub areas within 2
                                                                    weeks after disturbance




02011 Simmonds 6 Bristow Pty Ltd              Pacific Plumbing - Scanlon Property Group Pty Ltd                     J-1109-155 - 8 September 2011
I nCUEN1FILES contresl ConsbucOOnstt 109.155c - Essence of Peregian SCEP Stage I up deM109_oo tot DocunwdsU.1109¢ 15k SUP Sca*on Property
Group_SECP_ge_fa_ 11090Sdoc                                                                                                       Page 11 of 21

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.