Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
8. ENVIRONMENTAL IMPACT ASSESSMENT
The environmental impact of stormwater from the development was assessed using the
accepted solutions for managing stormwater quality in South East Queensland. The Water
Sensitive Urban Design Deemed to Comply Solutions for South East Queensland (henceforth
termed "the Solutions") outlines a seven step process for selecting and designing stormwater
management solutions, to achieve the stormwater management outcomes required by DERM
(2009). The Solutions identify acceptable solutions for "common" development scenarios to
meet design objectives, which are:
1) Stormwater Quality: Limiting the quantity of pollutants by adopting a best practices pollutant
load reduction approach, with consideration of the local climate.
2) Waterway Stability: Controlling the magnitude and duration of stormwater flows, to prevent
exacerbated in-stream erosion downstream of the development.
3) Frequent Flow: The hydraulic disturbance of in-stream ecosystems is similar to the pre-
development condition, which is achieved by capturing the initial portion of runoff from
impervious areas.
The proposed Essence of Peregian development will be in the Sunshine Coast Regional
Council jurisdiction, which is in the North Coast climate region of South East Queensland. The
proposed development type is residential land use, with a scenario of residential development
greater than 2 lots up to 20 lots. The residential development scenario can include commercial
development of high-density, multiple dwelling buildings at a scale of <_ 12,500 m2. This
scenario applies to the 6,970 m2 commercial node of the "Essence of Peregian" Stage 1
development.
The site details of the Essence of Peregian Development are presented on the annotated site
details plan (Appendix C), and summarized in Table 8.
Table 8: Site Details of the Essence of Peregian Development
Site Detail Description
Existing topography The average grade is 12% across the Stage 1 development area and 3 6%
across the entire development (Stage 1, Stage 2 & Stage 3), with a preferred
flow pathway from east to west across the development.
Existing Drainage Characteristics There are no significant existing drainages in the proposed development area.
Proposed Discharge Points and A proposed stormwater drainage has been designed for this development
Invert Levels (refer to plan drawings in Appendix A).
Soils The surface and sub-surface soils of the proposed development area include
imported fill. silty-clay, silty-sand, and fine sand. The surface soils are acidic,
with low nitrogen concentration and very low salinity. Acid sulphate soils may
occur in the sub-surface, but these soils will not be excavated or disturbed
because additional fill will be placed over them.
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1109-155 - 8 September 2011
1 CLIENTFILES\Contrast Consimcbons11109-155c - Essence of Peregian SCEP Stage I Update\09_Ontput OocumenI \J.I I09-155c_SMP Scanbn Property
Group_SECP_ge_Ia_110905 doc Page 12 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.