Skip to the record
Beware of cheap imitations.

Council archive · source document

Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335

of 275

Check the original when the exact wording matters.

Plans and drawings: the text below has words only, no drawings.

Very large file (49.6 MB): may take a few minutes to open.

Log in to see the plans as drawn
    Table 12: Monitoring Schedule for the Construction and Operational evelopment
                                           Site Site Site       Site Site Site Site Site
 Parameter                                      2
                                           1         3    4Site 5    6    7    8    9
 Rainfall                                                                                                 S

 pH                                                                      M       M        M       M

 Dissolved oxygen                                                        M       M        M       M
 BODE                                                                    M,      M*       M*      M,
 Suspended Solids                                                        M       M        M       M               S        S       S
 Total Nitrogen                                                          M       M        M       M

 Total Phosphorus                                                        M       M        M       M
 Herbicides                                                              M       M        M       M               S       S        S       S
 Faecal coliforms                                                        M       M        M       M
 Enterococci                                                             M       M        M       M

 Turbidity                                             M      M      M      M
M = monthly monitoring during construction and during the first year of operation; quarterly monitoring during the
second year and thereafter.
S = Monitoring during stormwater flow events




02011 Simmonds & Bristow Pty Ltd             Pacific Plumbing - Scanlon Property Group Pty Ltd                      J-1 109-155 - 8 September 2011
1 CCUENTFILES\Confrast Constwcwns11109- ISSc . Essence of Peregian SCEP Stage I Update 09- Output DocumentsU-1109155c_SMP_S anbn Property
Group SECP_gs_la_110905 doc                                                                                                       Page 16 o121

Used in these records

About this file

File size
49.6 MB (very large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Development Application Part 2 - Environmental & Stormwater Management Plans.pdf · 49.6 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.