Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
Table 12: Monitoring Schedule for the Construction and Operational evelopment
Site Site Site Site Site Site Site Site
Parameter 2
1 3 4Site 5 6 7 8 9
Rainfall S
pH M M M M
Dissolved oxygen M M M M
BODE M, M* M* M,
Suspended Solids M M M M S S S
Total Nitrogen M M M M
Total Phosphorus M M M M
Herbicides M M M M S S S S
Faecal coliforms M M M M
Enterococci M M M M
Turbidity M M M M
M = monthly monitoring during construction and during the first year of operation; quarterly monitoring during the
second year and thereafter.
S = Monitoring during stormwater flow events
02011 Simmonds & Bristow Pty Ltd Pacific Plumbing - Scanlon Property Group Pty Ltd J-1 109-155 - 8 September 2011
1 CCUENTFILES\Confrast Constwcwns11109- ISSc . Essence of Peregian SCEP Stage I Update 09- Output DocumentsU-1109155c_SMP_S anbn Property
Group SECP_gs_la_110905 doc Page 16 o121
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.