Council archive · source document
Development Application Part 2 - Environmental & Stormwater Management Plans · OPW11/0335
Plans and drawings: the text below has words only, no drawings.
Very large file (49.6 MB): may take a few minutes to open.
10. CONDITIONS AND LIMITATIONS The data contained in this volume has been commissioned by Contrast Construction Pty Ltd to support a Development Application for Operational Works associated with the development known as 'Essence of Peregian' located at 215-219 David Low Way, Peregian Beach. In preparing this report, Simmonds and Bristow has, in part, relied on survey data, flood level data, calculations and previous reports prepared by Council and external consultants to support the original development application, and the preparation of Joint Experts Reports for the court ordered mediation process associated with the preparation of the negotiated approval conditions. While reasonable precautions have been taken to validate the data provided before its incorporation into modelling and design procedures, the absolute accuracy of such data cannot be guaranteed with certainty and may vary over time as site conditions change. As such, it is anticipated that minor changes may be required on site to allow the recommendations of this plan to be implemented effectively. Minor or temporary changes to accommodate on-site conditions during the construction phase should be made in consultation with a suitably qualified and experienced professional engineer or qualified sediment and erosion control specialist. Any proposed permanent changes required to the layout, geometry, depth and/or volume of bio- filtration basins and/or wetland elements as a result of any site conditions that are different to those assumed and modelled during design, should be referred back to the designer, or to a suitably experienced and qualified stormwater management consultant, and resubmitted to Council for compliance re-cert ifi cation and approval. The Stormwater Management Report contained within this report comprises of all constituent parts of the report in full, including the text, calculation summary and appended drawings. If additional copies of this report are required, separate sections or individual pages must not be copied in isolation. Except for archival and record keeping purposes, this report should not be copied and stored in any electronic media or passed onto other parties without the express written permission of Simmonds & Bristow. No part of this report may be copied or used for any other purposes other than the purpose stated in this report. 02011 Simmonds & Bestow Ply Ltd Pacific Plumbing - Scanlon Property Group Ply Ltd J-1109-155 - 8 September 2011 I %CLIENTFILES1Conuast Construcoons11109-155c - Essence of Pemggan SCEP Stage I Updateb9 Output Ooc,nnenlsU-1109-155c_SMP_Sunbn Properly Gmup_SECP_ge_tn_ 110905.doc Page 17 of 21
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Development Application Part 2 - Environmental & Stormwater Management PlansRelated documentApplication case desk ↗
About this file
- File size
- 49.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.