INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008

S ECTIO N 4. Section 4 must be completed when the application seeks approval to carry out operational work,

PLANNING SCHEME

41 Is any of the proposed operational work assessable under a planning scheme?

DINo - Gote 042 BH Yes - (Complete Form 1, Pat 6) Answer Qs. 1 = 4.1.7 below.

STATE-CONTROLLED ROAD. : ;

4.1.1 {ts any part of the premises located in part of a future Siate-controted toad, or within 100m of a State-controlled road?

BH No
If no, is the proposed operational work for filling or excavating listed in integrated Planning Regulation 1998, schedule 5 and
does it exceed the threshold?

a} No 0 Yes - This application must be referred fo the Department of Main Roads (DMR) as Concurrence Agency.

(0 Yes . ;
If yes, is all of the proposed operational work associated with the following? .
(i) Amaterial change of use that is assessable under the planning scheme CNo (Yes

(i) Reconfiguring a tot that increases the total number of lots, or increases the total number oflots []No (] Yes
abutting the State-controlled road

 

 

 

 

if no to either or both (i) or (ii) above - Answer (a) - (c) below

(a) 4s any of the proposed operational work associated with access to a State-controlied road?
[No CU Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.

{b) 1s any of the proposed operational work for filling or excavation?

UINo (Yes
If yes, is the operational work proposed in a future State-controlled road not defined by route?
No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency
(1 Yes - mis application must be referred to DMR as Advice Agency.

(c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land,
through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road?
[No OYes

if yes, is the operational work proposed in a future State-controlled road not defined by route?
C) No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
oO Y@S - This application must be referred to DMR as Advice Agency.

IP Regutalion seheduis 2, teble 3 tem 3 'P Regulation, schedude 2, table 3. tom 15).
ACID SULFATE SOILS . : . | oo
4.1.2 js any of the operational work proposed in a local government area listed*! in State Planning Policy 2/02: Planning and Managing

Development Involving Acid Sulfate Soils?
PK] No-Gotoa41.3 [] Yes

If yes, is the naturat ground level of any point where work is being carried out less than 20m AHD?

 

 

CINo (J Yes
If yes, does the proposed operational work involve the following?
() Excavating more than 1,000m* of soil or sediment at or below 5m AHD [No (Yes

(ii) Filling the premises with 1,000m: or more of material with an average depth of 0.5m on CINo (lYes
land, soil or sediment at or below 5m AHD

It yes to either or both @ or (ii) above - This application must Lo be referred to the Department of Natural Resources and Water (NRW) as
Agency

IF Regpiation, cebodtuie 2, iable 3. dam 4, Slate Panning Pokey 202 Planning and Managing Decslogntant involving Ard Susie Sous, section 36.

 

 

 

 

41 Aurukun, Bowen, Srisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Caboolture, Caims, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cootoola, Douglas,
Fitzroy, Gladstone, Gold Coast , Hervey Bay, Hinchinbrook, Isis, Johnstone , Livingstone, Logan, Mackay, Maroochy, Maryborough, Miriam Vale, Momington, Noosa, Pine
Rivers, Radcliffe, Redland, Rockhampton, Sarina, Thuringowa, Taro, Torres, Townsville, Whitsunday

"Page 21

 

 

Used in these records

About this file

File size
2.0 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0531 - Op Works - Dam [As Published].pdf · 2.0 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.