08/0531 - Op Works - Dam [As Published] · 142008.531
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008
EASEMENTS AND SUBSTATIONS
413
Is any of the proposed operational work for filling or excavation?
CINo-Gotoass4 [Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
CO Yes No - Answer both (a} and (b) below
{a) Is any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
NI No (Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
O No oO Yes - This application must be referred to the entity as Advice Agency.
{b) Is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
No (1 Yes - This application must be referred to the entity responsible for the substation as Advice Agency.
'P Retpiation, sitecde 2, labie 3 dem ira): iP Ragutation. scimdile 2, lodte 3, ten: 10{5)
4.1.4
ls any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
FRINo-Gotoas1.5 (Yes
If yes, is any of the proposed operational. work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring a lot?
CI No Yes
if yes, is any of the operational work proposed to be located in any part of the easement?
CINo C1 Yes - This application must be referred to the ficance holder as Advice Agency.
JP Regulation schedule 2. table 3 tom 17
PUBLIC PASSENGER TRANSPORT
4.1.5
Is any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
M4 No - Goto 04.1.6 (DD Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Roguilsiton, schedule ¢, table 3, sen 14
RAILWAY SAFETY AND EFFICIENCY
ls any of the proposed operational work listed in schedule 13D of the /ntegrated Planning Regulation 1998 and does it exceed the
4.16
specified threshold?
No - Goto 04.1.7 oO Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
iP Regulation. scbociie Z laties & den 15.
KOALA CONSERVATION
4.1.7 |\s any part of the premises in a koala conservation area or koala sustainability area?
[dl No - Goto 04.2 (Yes
If yes, is all of the proposed operational work associated with a material change of use or reconfiguring a lot for which referral
is required in relation to koala conservation (i.e. did you answer ‘yes' to all questions in either Q2.1.8 or Q 3.12}?
(Yes - Goto 04.2 CINo
If no, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
(Yes -Gotoas2 LJNo
If no, will the activity result in the following?
(i) Clearing of native vegetation over an area 1 greater than 2, 500m? - O No ‘Oh Yes i
(ii) Extracting gravel, rock or sand from an area greater than 5, ooome Oo No oO Yes —
‘ (iii) Excavating or filling an area greater t ‘than 5,000 5,000m? . Oo No “O) Yes |
if yes fo one or more of (i) — (iii) above - This application must be referred to the Environmental Protection Agency (EPA} as
Concurrence Agency.
1? Regulater scree 2 Iie; 2 dem 10
WILD RIVER AREA - atthough legislation provides for assessment of operational works for residential, commercial and industrial development for the purposes of the
Wild Rivers Act 2005, currently no declarations for any of ihe wild river areas apply the Wild Rivers code to that type of development.
Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0531 - Op Works - Dam [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.