Council archive · source document
08/0531 - Op Works - Dam [As Published] · 142008.531
INTEGRATED PLANNING ACT 1997 {DAS Assessment Checklist, Version 21.1, 3 March 2008
DECLARED FISH HABITAT AREA; WILD RIVER-AREA
4.13
's any of the proposed operational work to be carried out completely or partly within.a declared fish habitat area under the Fisheries
Act 1994.
[RINo-Gotoosss §=[[] Yes
If yes, is the operational work reasonably necessary for: (Tick applicable box/es and answer (a) and/or {b) below) _ _
(i) The maintenance of existing structures, including for example the following structures, if the structures ([] No|[_] Yes |
were constructed in compliance with all the requirements, under any Act, relating to a structure of that \ !
type - .
+ Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs; i i
+ Existing powerlines or associated powerline infrastructure i
(ii) Educational or research purposes relating to the fish habitat area oO Noi iO Yes
(ii) Monitoring the impact of development on the declared fish habitat area ‘a No O Yes
(iv) The construction or placement of structures, including for example, safety signs, swimming enclosures [7] No/ [_] Yes
and aids to navigation, if -
« The impact on the area is minor; and !
+» The structures are constructed in compliance with all the requirements, under any Act, relating to a | I
structure of that type !
(v) Public benefit ‘works, including, for example, the construction of runnels for mosquito control, the “Ar No ot oO Yes |
removal of Lyngbya and seed collection for site rehabilitation, if the impact on the area is minor
(a) If yes to one or more of (i) ~ (v) above, does all the proposed operational work comply with any / applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(7) Yes - 4 permit for that aspect of the operational work is nat required. Goto Q4.14 — [[] No-Goto(b)
(b) If no to all of (i) — (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part O:) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not
Oo the Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency.
Yes
It yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part Q2) This application requires assessment by the Department of Primary industries and Fisheries
(OPI&F) and assessment for the purposes of the Wiki Rivers Act 2005. if DPI&F is not the Assessment Manager for the application, the
agency has jurisdiction as Concurrence Agency.
Ono
If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse
to receive it, (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers
Act 2005. If DPI&F is not the Assessment Manager far the application, the agency has jurisdiction as Concurrence Agency.
Oo Yes- An gppication for the operational work will be taken to be not properly made and the assessment manager must refuse to
3 S0des! IF Regulation, schadule 2 tabi 2, dem 25; IP
Page 30
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records