Council archive · source document
08/0531 - Op Works - Dam [As Published] · 142008.531
°
INTEGRATED PLANNING ACT 1997
(DAS Assessment Checkfist, Version 21.1, 3 March 2008
REMOVAL, DESTRUCTION OR DAMAGE OF.A MARINE PLANT; WILD RIVER AREA.
4.14
Is any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
[KNo-Gotoas1s (1 Yes
if yes, is the proposed operational work reasonably necessary for: (Tick applicable box/es and answer (a) andlor (ot below)
'() The removal, destruction or damage of dead marine wood on unallocated State land, other than ina a) No (1) Yes
wild river area, for trade or commerce
(ii), The maintenance of existing structures, including, for example, the following structures, if the CNo -(1 Yes
structures were constructed in compliance with all the requirements, under any Act, relating to a ‘ :
structure of that type —
« boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures and
weirs;
» — existing drainage structures;
« — existing powerlines or associated powerline infrastructure
“(i) For educational or research purposes or for the monitoring the impact of devefopment on marine : Vo No oO Yes
Plants
“Ww For the construction or placement of structures, including, for for example, swimming enclosures, safety | ([] No [CNo -L] Yes |
signs, aids to-navigation, fences, pontoons, public boat ramps and pipelines, if - i
« The extent of the removal, destruction or damage is minor, and i : i
+ The structures were constructed in compliance with all the requirements, under any Act, relating |
structure of that type
(v) For the construction of runnels for mosquito control, removal of Lyngbya, seed collection for site (No ‘T) Yes
__Tehabilitation or the collection of marine plants for fishing bait, or handicraft _
() If yes to one or more of (i) — (v) above, does all the proposed operational work comply with any applicable Department of
Primary Industries and Fisheries (DPI&F) self-assessable code?
(1 Yes - 4 permit for that aspect of the operational work is not required. Go to Q4.15 oO No - Go to (b)
(b) If no to all of (i) - (v) or no to (a) above, is that proposed operational work to be carried out in a wild river area declared
under the Wild Rivers Act 2005?
oO No - (Complete Form 1, Part 0,) This application requires assessment by the Department of Primary Industries and Fishertes (DPI&F). If DPIGF is not
the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
(1 Yes
es, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?
YeS - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part 02) This application requires assessment by the Department of Primary Industries and Fisheries
(OPI8F) and, subject to the dectaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. if
DPI8F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
LINo
If n0, is all of the proposed operational work necessary and unavoidable part of installing or maintaining works or
infrastructure required to support other development for which a development permit is not required or, ifa
development permit is required, the permit is held or has been applied for?
O Yes - Unless the application is consistent with any property development plan applying to the lend, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O,) This application requires assessment by the Department of Primary Industries and Fisherles
(OPI&F) and, subject to the declaration for the relevant wild niver area, assessment for the purposes of the Wild Rivers Act 2005. if
OPI8F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
oO No - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse fo receive it.
IPA schedule 8. p27 Z tabled dem + Fisheries Reguichon 1995 $1130 {sei-assessabie codas); [P Regulation, schadisie 2. take 2, dem 29; iP
| Rent b: Fisheries Act 1994, seca 7608 fwd dver area). Wid Rivers Art 2003, section 42A; relevant wilt mer dactaration; Wild Rivers Ce
Page 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0531 - Op Works - Dam [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.