08/0531 - Op Works - Dam [As Published] · 142008.531
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.1, 3 March 2008 WILD RIVER AREA Sas 4.15. | Is any of the operational work proposed to be carried out in a wil river area declared under the Wild River Act 2005? be) No~Gotoaai6 (Yes If yes, is the proposed operational work for the following and also declared under the wild river declaration for the areas to be assessable? (i) Agricultural activities as defined under the Wild Rivers Act 2005 CINo O1Yes (ii) Animal husbandry activities as defined under the Wild Rivers Act 2005 ONo OYes If yes to either (i) or (ii) above, is any part of the premises in the wild river high preservation area? oO Yes - An application for the operational work will be taken fo be not properly made and the Assessment Manager must refuse to receive it (J) No If no, is the proposed use in relation to the production of a high risk species as defined under the Wild Rivers Act 2005? oO Yes - An application for the operational work will be taken to be not properly made and the Assessment Manager must refuse to receive i. C No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse fo receive it (Complete Form 1, Part Q if agricutture. Complete Form 1, Part R if animal husbandry) Subject to the declaration for the relevant wild river area, this application requires assessment by the Department of Natural Resources and Water (NRW). if NRW is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency. IPA, scheduie 2. par i. table 4. dem 10 IP Regutalon, schedule 2. table 2 item 37; Wiki Rivers Act 2005, sections 42, 434, STATE-CONTROLLED ROAD 4.16 Is any part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road? No-Endofsection4 [C] Yes If yes, is the proposed operational work associated with any of the following? (Tick applicable box/es) (i) A material change of use that is assessable under the planning scheme DNno (Yes (ii) Reconfiguring a lot that increases the total number of lots, or increases the total number of lots [JNo [1] Yes abutting the State-controlled road If no to either or both (i) or (i) above, and answers to questions in this section of the checklist indicate the proposed operational work is assessable under IPA, schedule 8 - Answer (a) - (¢) below. (a) Is any of the proposed operational work associated with access to a State-controlled road? oO No oO Yes - This application must be refarred to the Department of Main Roads (DMR) as Concurrence Agency, (b) Is any of the proposed operational work for filling or excavation? (No Yes If yes, is the operational work proposed in a future State-controlled road not defined by route? LI No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. O Yes - This application must be referred to the DMR as Advice Agency, (c) Does any of the proposed operational work involve the redirection or intensification of site stormwater from the land, through a pipe with a cross-sectional area greater than 625cm? that directs stormwater to a State-controlled road? ONo (J Yes If yes, is the operational work proposed in a future State-controlled road not defined by route? C) No - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency. Cl Yes - This application must be referred to the DMR as Advice Agency. Ib Reapuiabesn ila 2 tahl 2, tern 2 Page 32
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0531 - Op Works - Dam [As Published]Related documentApplication case desk ↗
About this file
- File size
- 2.0 MB (small file)
- File type
No other editions are linked here.