AMENDED ADVICE - Energex - Approved subject to conditions Taylor

of 4
18 June 2026




Chief Executive Officer
Noosa Council
Attention: Georgina Schramm
Via email: [email protected]



               cc    Pace Planning Pty Ltd
                     Attention: Brooke Wildin
                     Via email: [email protected]


Dear Sir/Madam,

Energex Advice Agency Response
Our Ref: ECM 39501951-40677416

This Amended Referral Agency response is given under section 56 of the Planning Act
2016.

 Response
 Outcome                 Approved in full - subject to conditions
 Date of response        18 June 2026
 Referral assessment     Advice
 capacity
 Matters referral        The purpose of the Electricity Act 1994 and Electricity
 assessment made         Safety Act 2002
 against (S55(2))
 Reasons for decision    The works do not conflict with:
 (S56(7)(b))
                              ▪   the objectives set out within Part 2, Section 3 of the
                                  Electricity Act 1994
                              ▪   the purpose of the Electricity Safety Act 2002 as set
                                  out within Part 1 Division 2 Section 4 & 5.
                         The works do not adversely impact on the safe, efficient,
                         and economically viable operation of the supply network.

 Development Details
 Applicant                   Pace Planning Pty Ltd
 Assessment Manager          Noosa Council
 Council Application No.     MCU26/0040, OPW26/0066, RAL26/0013
 Street Address              18 Taylor Ct, Cooroy
 Real Property Description   Lot 2 on SP197517
 Development Type            Development Permit for Material Change of Use - Low
                             Impact Industry (54 units), Transport Depot & Caretakers
                             Accommodation, Operational Works - Road Work,

Log in to download the original (AMENDED ADVICE - Energex - Approved subject to conditions Taylor.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 3 pages

Page 2

                                                   2




                                  Drainage Work, Stormwater, Earthworks &
                                  Landscaping, Reconfiguring a Lot - Community Title
                                  Subdivision (1 Lot into 54 Lots)
 Referral Trigger                 ☒ Schedule 10, Part 9, Division 2, Table 1, Item 1
                                  (10.9.2.1.1) – Reconfiguring a lot subject to an easement
                                  for the benefit of a distribution entity under the Electricity
                                  Act for a supply network; or part of the lot is within 100m
                                  of a substation site
                                  ☒ Schedule 10, Part 9, Division 2, Table 2, Item 1
                                  (10.9.2.2.1) – Material Change of use of premises within
                                  100m of a substation site or subject to an easement for
                                  the benefit of a distribution entity under the Electricity Act
                                  and the easement is for a supply network
                                  ☒ Schedule 10, Part 9, Division 2, Table 3, Item 1
                                  (10.9.2.3.1) - Operational Work on premises subject to
                                  an easement for the benefit of a distribution entity under
                                  the Electricity Act for a supply network; or part of the lot
                                  is within 10m of a substation site
 Impacted Electrical              Easement AA on SP316697
 Infrastructure

Energex provides the following response to the application in accordance with Section
56(1) of the Planning Act 2016:

 Component of                     Advice Agency direction
 Development
 MCU/ ROL/ OPW                    ☒ S56(1)(b)(i) – approval subject to stated development
                                  conditions


In accordance with Section 56(1) should the Assessment Manager decide to approve
the proposed Development Application, as an Advice Agency, Energex requires that
the assessment manager impose the below conditions. These conditions have been
imposed in response to the matters prescribed under Section 55 (2) of the Planning Act
2016.

                                    Table 1
                       Plans forming part of this Approval
 Title                            Plan No.         Issue                        Date
 SITE / FLOOR PLAN LEVEL 1- 2025-68                I                            29.05.26
 OPT 05
 Overall Development Layout Plan C010              B                            08.05.26

 Landscape Plan                             2025-68               I             29.05.26
                                            Sheet 30

                                               Table 2
 Condition                                                 Timing             Purpose/Reason
 1   Carry out the approved development                    At all times       To ensure the
     generally in accordance with the approved                                development is
                                                                              carried out generally


                                  Have you seen our fact sheets?
    See the ‘considerations when developing around electricity infrastructure’ section of our website
                                www.energex.com.au/referralagency

Page 3

                                                    3




         plans and documents outlined within                                   in accordance with
         Table 1 of this approval and the following:                           the plans of
             ▪ The specifications, facts and                                   development
                circumstances as set out in the                                submitted within the
                development application                                        application
                submitted to Energex; and
             ▪ Where a discrepancy or conflict
                exists between the written
                conditions of the approval and the
                approved plans, the requirements
                of the written conditions prevail.

 2       Any alterations to the plans and                   At all times       To ensure the
         document(s) identified within Table 1 of                              development is
         this response are to be resubmitted to                                carried out generally
         Energex for comment.                                                  in accordance with
                                                                               the plans of
                                                                               development
                                                                               submitted within the
                                                                               application

General Advice:

     ▪   Compliance with the Electrical Safety Act 2002, including any Code of Practice
         under the Act and the Electrical safety Regulation 2013 including any safety
         exclusion zones defined in the Regulation is mandatory

         Should any doubt exist in maintaining the prescribed clearance to the overhead
         conductors and electrical infrastructure then the applicant is obliged under the
         Act to seek advice from Energex.

     ▪   Any costs incurred by Energex as a result of the works on the easement are to
         be met by the property Developer / owner.

     ▪   This response does not constitute an approval to commence any works within
         the easement. Consent to commence works relevant to the conditions of the
         easement is required. All works on easement (including but not limited to
         earthworks, drainage and detention basins, road construction, underground and
         overhead services installation) require detailed submissions, assessment, and
         consent (or otherwise) by Energex.

     ▪   All works proposed to be undertaken in close proximity to overhead or
         underground electrical lines are to be undertaken in accordance with Energex’s
         Works Practice Manual WP1323. This document refers to various standards,
         guidelines, calculations, legal requirements, technical details, and other
         information relevant to working near high voltage infrastructure. A copy of
         WP1323 can be found online via Energex’s document library (Document library
         | Energex).




                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency

Page 4

                                                    4




Should you require any further information on the above matter, please contact the
undersigned on 0428 943 997 or via email at [email protected] faithfully,




Scott Pearson
Senior Town Planner




                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.