Appendix D_Engineering Report

Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.

of 80

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file: it may take a few minutes

The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

                                                                                                15128/1
                                                                                                 Page 10




5.4.4 Design Storms
As defined in Noosa Council’s Planning Scheme the following design storms were adopted:
    1. Minor Drainage System: 10 year ARI statistical flood (Q10 storm), and;
    2. Major Drainage System: 100 year ARI statistical flood (Q100 storm).

5.4.5 Rainfall Intensity
Rainfall intensities for this study were obtained from the IFD chart for the Noosa Region
calculated from AR&R, 1987 and sourced from the Australian Bureau of Meteorology.

5.4.6 Times of Concentration
Times of concentration (tc) were calculated as defined in Section 4.06 of the QUDM. Refer to
Table 5-1 for the adopted tc’s and to Appendix G for tc calculations.

                                      Table 5-1 – Adopted tc values
                                   Pre Development         Post Development
                                       tc (mins)                tc (mins)

                                          11.2                       6.9


5.4.7 Runoff Coefficients
The 10 year runoff coefficient’s (C10) were determined as defined in Section 4.05 of the QUDM.
Refer to Table 5-2 below for the adopted C10 values.

                                      Table 5-2 – Adopted C10 Values

                                          Property State                   C10

                                        Pre-development                    0.35
                                        Post-development                   0.83


5.4.8 Peak Flows
Refer to Table 5-3 for a summary of the predicted minor and major discharge rates for pre- and
post-development conditions and to Appendix G for the Rational Method calculations.

                                Table 5-3 – Pre and Post-Development Peak Flows

                             Property State                Q10 (m3/s)             Q100 (m3/s)

                           Pre-development                   0.190                  0.331
                           Post-development                  0.543                  0.942


It is evident that there will be an increase between the pre-development and post-development
peak discharge flow rates.




Engineering Services Assessment
Residential Development at Precinct E2, Noosa Springs, Noosa Heads
Log in to download the original file

Appendix D_Engineering Report.pdf · 10.0 MB (very large file)

Very large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.