15128/1
Page 11
5.4.9 Downstream Stormwater Infrastructure
An assessment of the existing downstream stormwater infrastructure within Resort Drive and
through Precinct E1 to the Golf Course has been provided. The capacity of the downstream
pipes within Resort Drive and Precinct E1 and the flows from their corresponding contributing
catchments are summarised in Table 5-4 below. Refer to Appendix E for the Concept Siteworks
and Drainage Plans which outline the location of the existing stormwater pipes and their
proposed contributing catchments.
Table 5-4 – Pre and Post-Development Peak Flows
Pipe Contributing Q10 Flow Pipe Capacity
Pipe Grade
Pipe Number Diameter Catchments (m3/s) (m3/s)
(%)
(mm)
1 675 1.1 C2 0.396 0.841
2 375 1.4 C1 0.134 0.208
3 535 0.34 C1 0.134 0.261
4 800 5.0 C1+C2+Road 0.692 2.957
5 800 4.7 C1+C2+Road 0.692 2.886
6 800 7.8 C1+C2+Road 0.692 3.668
It has been demonstrated that the existing pipe system within Resort Drive and within Precinct
E1 has sufficient capacity cater for the Q10 flows from the ultimate development of Precinct
E2. Therefore, on-site detention is not deemed necessary for the proposed development on
Precinct E2.
5.5 Stormwater Quality Management
The proposed development will involve an increase in impervious surfaces and a change in land
use. Potential sources of contaminants and stormwater quality improvement devices identified
for the operational phase of the development are outlined in Table 5-5
Table 5-5 - Sources of Contaminants
Pollutant
Target Pollutant Type Acceptable Treatment Examples
Size
Primary Screening of gross Litter baskets, swales, buffer strips,
>5000um
Pollutants pollutants GPT’s
Sedimentation of
Secondary 125um -
coarse to medium Swales, sedimentation basins, ponds
Pollutants 5000um
sediment
Enhanced Bio-retention basins, constructed
10um –
sedimentation of fine wetland macrophyte zones, other bio
125um
particulates technologies
Tertiary Adhesion and filtration
0.45um – Constructed wetland macrophyte zones,
Pollutants of very fine / colloidal
10um other bio technologies
sediment
Biological uptake of Constructed wetland macrophyte zones,
<0.45um
dissolved particles other bio technologies
Engineering Services Assessment
Residential Development at Precinct E2, Noosa Springs, Noosa Heads
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.