Original source · versioned page text
Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
15128/1
Page 13
5.7 Water Reticulation
An existing 150mm diameter water main terminating at the western boundary of the site
adjacent to the site entrance was provided as part of the Noosa Springs Development. The main
is currently servicing Precinct E1. It is proposed to maintain the existing water main to service
Precinct E2. An internal domestic water main and internal fire system will be provided. Details
of the internal water main and hydrants will be provided by a Hydraulic Consultant during
detailed design.
Refer to Appendix E for the Civil Engineering Plans which indicate the location of the existing
water main.
5.8 Sewerage Reticulation
A 150mm diameter sewer main terminating at the western boundary of the site adjacent to the
site entrance was previously constructed as part of the Noosa Springs Development. The main is
currently servicing Precinct E1. It is proposed to maintain the existing sewer main to service
Precinct E2. An internal sewer main will be provided to service the proposed residential
buildings. Details of the internal sewer main will be provided by a Hydraulic Consultant during
detailed design.
Refer to Appendix E for the Civil Engineering Plans which indicate the location of the existing
sewer main.
5.9 Electrical and Telecommunications and Gas
The site is serviced by electrical and telecommunications at the following locations:
1. Underground Electrical Cable (Energex), voltage less than 33kV: Resort Drive
2. Underground Telstra Cable: Resort Drive
3. LPG Gas Main: Resort Drive
Refer to Appendix D for the Dial Before You Dig (DBYD) Plans.
Engineering Services Assessment
Residential Development at Precinct E2, Noosa Springs, Noosa Heads
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.