Appendix D_Engineering Report
Attached to the e-mail MCU15/0109 IDAS Forms, Planning Report & Engineering Report - Links Drive Noosa Heads.
The original of this document is very large (10.0 MB). Opening the original or downloading it may take a few minutes. Please be patient and don't click again. The page text is quick to read. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Original PDF page 13, section 1. The text section number identifies this passage in the reader.
15128/1
Page 12
The proposed development will discharge stormwater to the existing stormwater infrastructure
within Resort Drive and subsequently into the Noosa Springs Golf Course which contains a series
of gross pollutant traps, sediment basins and lakes containing deep zones and shallow
macrophyte zones. The lake system was designed for amenity, water storage for irrigation
purposes, flood mitigation and sediment and nutrient removal.
The above mentioned lake system also receives tertiary treated wastewater effluent from the
nearby wastewater treatment plant for the dual purpose of providing the Golf Course with
additional irrigation capacity, and to further treat the wastewater prior to being discharged
into the receiving water body of Lake Weyba. The lake system provides significant nutrient
removal for both incoming stormwater runoff and the tertiary treated effluent.
In addition to the existing stormwater quality treatment measures contained within the Noosa
Springs Development, it is proposed to provide on-site stormwater quality treatment measures
to protect and augment the existing drainage infrastructure and lake system within the Noosa
Springs development. The proposed on-site treatment assets are outlined in Table 5-6
Table 5-6 – Proposed On-Site Treatment Assets
Treatment Treatment
Description
Level Asset
First Flush devices are to be fitted to the roofwater
Primary/ First Flush and downpipe systems for the proposed buildings on
Secondary Device site. The first flush devices will discharge into the
proposed landscaping areas within the site.
Gross Humeceptor Gross Pollutant Traps will be
Primary/
Pollutant incorporated into the internal drainage system to
Secondary
Traps remove sediment, litter and hydrocarbons.
Refer Appendix H for the Humeceptor Maintenance Guidelines.
5.6 Flooding
Noosa Council Flood Overlay mapping indicates the site is not flood affected. Refer to
Appendix F for the Noosa Council Flood Overlay Mapping.
Engineering Services Assessment
Residential Development at Precinct E2, Noosa Springs, Noosa Heads
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalVery large file: the download may take a few minutes. If you are on mobile data, it is best to wait until you are on Wi-Fi.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.